ANALISIS

DE

PRECIOS

RUBRO N
1
DETALLE: DESBROCE, DESBOSQUE Y LIMPIEZA
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION
CANTIDAD (A)
1 HERRAMIENTAS MANUALES
1.00
2 MOTOSIERRA
1.00
3 TRACTOR ORUGAS
1.00
4
0
0.00
5
0
0.00
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
CANTIDAD (A)
1 PEONES
2.00
2 TRACTOR CARRILES O RUEDAS(BULDOZER, T
1.00
3 ENGRASADOR O ABASTECEDOR RESPONSABLE
1.00
4
0
0.00
5
0
0.00
0.00
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
2
DETALLE: REPLANTEO Y NIVELACION Y COLOCACION DE LATERALES
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION
CANTIDAD (A)
1 HERRAMIENTAS MANUALES
1.00
2 EQUIPO TOPOGRAFICO
1.00
3
0
0.00
4
0
0.00
5
0
0.00
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
CANTIDAD (A)
1 CADENERO
3.00
2 TOPOGRAFO 2: TITULO EXPER. MAYOR A 5
1.00
3
0
0.00
4
0
0.00
5
0
0.00
0.00
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1 ESTACAS DE MADERA
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
SUBTOTAL O

TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
3
DETALLE: EXCAVACION SIN CLASIFICAR A MAQUINA
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION
1 HERRAMIENTAS MANUALES
2 TRACTOR ORUGAS
3
0
4
0
5
0
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
1 PEONES
2 RETROEXCAVADORA
3
0
4
0
5
0
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1
0

CANTIDAD (A)
1.00
1.00
0.00
0.00
0.00

CANTIDAD (A)
1.00
1.00
0.00
0.00
0.00
0.00

2
3
4
5
6
7
8
9

0
0
0
0
0
0
0
0
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
4
DETALLE: LIMPIEZA DE DERRUMBES INCLUYE TRANSPORTE
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION
1 HERRAMIENTAS MANUALES
2 CARGADORA FRONTAL
3 VOLQUETE
4
0
5
0
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
1 CHOFER VOLQUETAS (EST. OCUP. C1)

CANTIDAD (A)
1.00
1.00
1.00
0.00
0.00

CANTIDAD (A)
1.00

2 CARGADORA FRONTAL (PAYLOADER SOBRE


3 ENGRASADOR O ABASTECEDOR RESPONSABLE
4
0
5
0
0.00
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

1.00
1.00
0.00
0.00

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
5
DETALLE: TRANSPORTE DE MATERIAL DE EXCAVACION
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION
1 VOLQUETE

CANTIDAD (A)
1.00

2
3
4
5

0
0.00
0
0.00
0
0.00
0
0.00
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
CANTIDAD (A)
1 CHOFER VOLQUETAS (EST. OCUP. C1)
1.00
2
0
0.00
3
0
0.00
4
0
0.00
5
0
0.00
0.00
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
6
DETALLE: MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONADO
ESPECIFICACION: TENDIDA HIDRATADA Y COMPACTADA DE MATERIAL DE MEJORAMI
EQUIPOS
N
DESCRIPCION
CANTIDAD (A)
1 HERRAMIENTAS MANUALES
1.00
2 MOTONIVELADORA
1.00
3 RODILLO LISO
1.00
4 TANQUERO 4000 GALONES
1.00
5
0
0.00
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
CANTIDAD (A)
1 MOTONIVELADORA
1.00
2 RODILLO AUTOPROPULSADO
1.00
3 ENGRASADOR O ABASTECEDOR RESPONSABLE
1.00
4 CHOFER TANQUEROS (EST. OCUP. C1)
1.00
5
0
0.00
0.00
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1 AGUA
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
7
DETALLE: TRANSPORTE DE MATERIAL DE MEJORAMIENTO
ESPECIFICACION: DISTANCIA DE TRANSPORTE 1 KM.
EQUIPOS
N
DESCRIPCION
CANTIDAD (A)
1 VOLQUETE
1.00
2
0
0.00
3
0
0.00
4
0
0.00
5
0
0.00
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
CANTIDAD (A)
1 CHOFER VOLQUETAS (EST. OCUP. C1)
1.00
2
0
0.00
3
0
0.00
4
0
0.00
5
0
0.00
0.00
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
SUBTOTAL O
TRANSPORTE

N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
8
DETALLE: EXCAVACION Y RELLENO PARA ESTRUCTURAS MENORES
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION
1 HERRAMIENTAS MANUALES
2 RETROEXCAVADORA
3 COMPACTADOR MECANICO
4
0
5
0
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
1 RETROEXCAVADORA
2 PEONES
3
0
4
0
5
0
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1 AGUA
2
0

CANTIDAD (A)
1.00
1.00
1.00
0.00
0.00

CANTIDAD (A)
1.00
2.00
0.00
0.00
0.00
0.00

3
4
5
6
7
8
9

0
0
0
0
0
0
0
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
9
DETALLE: HORMIGON CICLOPEO (60% H.S., 40% PIEDRA) EN MUROS INCLUYE ENCOF
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION
1 HERRAMIENTAS MANUALES
2 HORMIGONERA
3
0
4
0
5
0
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
1 PEONES

CANTIDAD (A)
1.00
1.00
0.00
0.00
0.00

CANTIDAD (A)
7.00

2 ALBAIL
3
0
4
0
5
0
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1 CEMENTO
2 ARENA GRUESA
3 GRAVA
4 PIEDRA
5 AGUA
6 TABLA DE ENCOFRADO
7 LISTON ENCOFRADO
8 PUNTALES DE ENCOFRADO
9 CLAVOS >2"
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

1.00
0.00
0.00
0.00

0.00

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

ANALISIS

DE

PRECIOS

RUBRO N
10
DETALLE: TUBERIA DE ACERO CORRUGADO D = 1.20 m., e = 2 mm
ESPECIFICACION: .
EQUIPOS
N
DESCRIPCION

CANTIDAD (A)

1 HERRAMIENTAS MANUALES
1.00
2
0
0.00
3
0
0.00
4
0
0.00
5
0
0.00
SUBTOTAL M
MANO DE OBRA
N
DESCRIPCION
CANTIDAD (A)
1 PEONES
2.00
2 ALBAIL
1.00
3
0
0.00
4
0
0.00
5
0
0.00
0.00
SUBTOTAL N
MATERIALES
ND E S C R I P C I O N
1 ARMCO D = 1,20 m e= 2 mm INCLUYE PERNOS
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
SUBTOTAL O
TRANSPORTE
N
DESCRIPCION
1
2
3
4
5
6
7

0
0
0
0
0
0
0

SUBTOTAL P

ESTE PRECIO NO INCLUYE IVA

DE

PRECIOS

UNITARIOS
HOJA:

1
UNIDAD: Ha.

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


0.50
0.50
0.5000
0.25
2.50
2.50
5.0985
12.75
50.00
50.00
5.0985
254.93
0.00
0.00
0.00
0.00
0.00
0.00
267.93
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
3.26
6.52
5.0985
33.24
3.66
3.66
5.0985
18.66
3.30
3.30
5.0985
16.83
0.00
0.00
0.00
0.00
0.00
0.00
68.73
UNIDAD
0
0
0
0
0
0
0
0
0

UNIDAD

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.00
CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

COSTO (C=A*B)
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

DE

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
67.33
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

UNITARIOS
HOJA:

LATERALES

20.00%
0.00%

0.00
336.66
67.33
0.00
403.99
403.99
0.00

2
UNIDAD: KM.

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


0.50
0.50
0.5000
0.25
5.00
5.00
40.5700
202.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
203.10
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
3.30
9.90
40.5700
401.64
3.66
3.66
40.5700
148.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
550.13
UNIDAD
GLOBAL
0
0
0
0
0
0
0
0

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
1.0000
0.50
0.50
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.50

DE

UNIDAD

CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
150.75
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

COSTO (C=A*B)
0
0
0
0
0
0
0

20.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
753.73
150.75
0.00
904.48
904.48
0.00

UNITARIOS
HOJA:

3
UNIDAD: M3

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


0.50
0.50
0.5000
0.25
50.00
50.00
0.0145
0.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.98
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
3.26
3.26
0.0145
0.05
3.66
3.66
0.0145
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
UNIDAD
0

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
0.0000
0.00
0.00

DE

0
0
0
0
0
0
0
0

UNIDAD

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

CANTIDAD (A)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
0.22
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
COSTO (C=A*B)

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
1.08
0.22
0.00
1.30
1.30
0.00

20.00%
0.00%

UNITARIOS
HOJA:

4
UNIDAD: M3

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


0.50
0.50
0.5000
0.25
45.00
45.00
0.0115
0.52
25.00
25.00
0.0115
0.29
0.00
0.00
0.00
0.00
0.00
0.00
1.06
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
4.79
4.79
0.0115
0.06

DE

3.66
3.30
0.00
0.00

UNIDAD
0
0
0
0
0
0
0
0
0

UNIDAD

3.66
3.30
0.00
0.00

0.0115
0.0115

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.00
CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
0.24
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

0.04
0.04
0.00
0.00
0.14

COSTO (C=A*B)
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
1.20
0.24
0.00
1.44
1.44
0.00

20.00%
0.00%

UNITARIOS
HOJA:

5
UNIDAD: M3/KM

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


25.00
25.00
0.0082
0.21

DE

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.21

JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
4.79
4.79
0.0082
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
UNIDAD
0
0
0
0
0
0
0
0
0

UNIDAD

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.00
CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
0.05
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

COSTO (C=A*B)
0
0
0
0
0
0
0

20.00%
0.00%

UNITARIOS

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.25
0.05
0.00
0.30
0.30
0.00

HOJA:

LO SELECCIONADO
DE MATERIAL DE MEJORAMIENTO

6
UNIDAD: M3

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


0.50
0.50
0.2000
0.10
45.00
45.00
0.0348
1.57
40.00
40.00
0.0348
1.39
25.00
25.00
0.0348
0.87
0.00
0.00
0.00
3.93
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
3.66
3.66
0.0348
0.13
3.48
3.48
0.0348
0.12
3.30
3.30
0.0348
0.11
4.79
4.79
0.0348
0.17
0.00
0.00
0.00
0.53
UNIDAD
M3
0
0
0
0
0
0
0
0

UNIDAD

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
0.0200
6.00
0.12
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.12
CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

COSTO (C=A*B)
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

DE

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
0.92
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

4.58
0.92
0.00
5.50
5.50
0.00

20.00%
0.00%

UNITARIOS
HOJA:

7
UNIDAD: M3/KM

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


25.00
25.00
0.0082
0.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.21
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
4.79
4.79
0.0082
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
UNIDAD
0
0
0
0
0
0
0
0
0

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.00

DE

UNIDAD

CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
0.05
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.25
0.05
0.00
0.30
0.30
0.00

20.00%
0.00%

UNITARIOS
HOJA:

MENORES

COSTO (C=A*B)

8
UNIDAD: M3

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


0.50
0.50
0.5000
0.25
25.00
25.00
0.1168
2.92
4.00
4.00
0.1168
0.47
0.00
0.00
0.00
0.00
0.00
0.00
3.64
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
3.66
3.66
0.1168
0.43
3.26
6.52
0.1168
0.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.19
UNIDAD
M3
0

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
0.0500
6.00
0.30
0.0000
0.00
0.00

DE

0
0
0
0
0
0
0

UNIDAD

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

CANTIDAD (A)

0.00
0.00
0.00
0.00
0.00
0.00
0.00

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
1.03
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

PRECIOS

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.30
COSTO (C=A*B)

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
5.13
1.03
0.00
6.16
6.16
0.00

20.00%
0.00%

UNITARIOS
HOJA:

) EN MUROS INCLUYE ENCOFRADO

9
UNIDAD: M3

DE 10

TARIFA (B) COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)


0.50
0.50
0.5000
0.25
5.00
5.00
1.6000
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.25
JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
3.26
22.82
1.6000
36.51

3.30
0.00
0.00
0.00

3.30
0.00
0.00
0.00

UNIDAD

1.6000

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
206.0000
0.18
37.08
0.3900
30.00
11.70
0.5400
30.00
16.20
0.4500
30.00
13.50
0.1300
6.00
0.78
1.7900
3.20
5.73
0.7100
2.00
1.42
5.0000
1.20
6.00
0.2000
2.20
0.44
92.85

KG
M3
M3
M3
M3
U
U
U
LIBRA

UNIDAD

CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
28.58
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

DE

PRECIOS

TARIFA (B)

COSTO (C=A*B)
0
0
0
0
0
0
0

20.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
142.89
28.58
0.00
171.47
171.47
0.00

UNITARIOS
HOJA:

e = 2 mm

5.28
0.00
0.00
0.00
41.79

10
UNIDAD: ML

DE 10

COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)

0.50
0.00
0.00
0.00
0.00

0.50
0.00
0.00
0.00
0.00

5.0000

2.50
0.00
0.00
0.00
0.00
2.50

JORNAL/HORA (B)
COSTO HORA (C=A*B) RENDIMIENTO ( R ) COSTO (D =C*R)
3.26
6.52
0.7882
5.14
3.30
3.30
0.7882
2.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.74
UNIDAD
ML
0
0
0
0
0
0
0
0

UNIDAD

CANTIDAD (A)
PRECIO UNITARIO (B)COSTO (C =A*B)
1.0000
165.00
165.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
0.0000
0.00
0.00
165.00
CANTIDAD (A)

TARIFA (B)
0
0
0
0
0
0
0

TOTAL COSTO DIRECTO (M+N+O+P)


INDIRECTOS %
UTILIDAD %
35.05
COSTO TOTAL DEL RUBRO
VALOR OFERTADO

COSTO (C=A*B)
0
0
0
0
0
0
0

20.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
175.24
35.05
0.00
210.29
210.29
0.00

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

D =C*R)

GOBIERNO AUTONOMO DESCENTRALIZADO RURAL D

TABLA DE RUBROS, CANTIDADES Y P

PROYECTO: Estudio y diseo de la apertura de la via para los barrios: San Ramon - Lance de la parroquia Bellavi
OBRA: Estudio y diseo de la apertura de la via para los barrios: San Ramon - Lance de la parroquia Bellavista, C
FECHA: BELLAVISTA, FEBRERO DE 2016
UBICACION: PARROQUIA BELLAVISTA, CANTON ESPINDOLA, PROVINCIA DE LOJA
NOMBRE DEL CONSULTOR: ING. JOSE V. ZHININ LITUMA
PLAZO : 120 DIAS CALENDARIO
NRUB.
1
2
3
4
5
6
7
8
9
10

GOBIERNO AUTONOMO DESCENTRALIZADO RURAL DE LA P


TABLA DE RUBROS, CANTIDADES Y PRECIOS

YECTO: Estudio y diseo de la apertura de la via para los barrios: San Ramon - Lance de la parroquia Bellavista, Cantn Esp
A: Estudio y diseo de la apertura de la via para los barrios: San Ramon - Lance de la parroquia Bellavista, Cantn Espndo
HA: BELLAVISTA, FEBRERO DE 2016
CACION: PARROQUIA BELLAVISTA, CANTON ESPINDOLA, PROVINCIA DE LOJA
MBRE DEL CONSULTOR: ING. JOSE V. ZHININ LITUMA
ZO : 120 DIAS CALENDARIO
D E S C R I P C I O N
DESBROCE, DESBOSQUE Y LIMPIEZA
REPLANTEO Y NIVELACION Y COLOCACION DE LATERALES
EXCAVACION SIN CLASIFICAR A MAQUINA
LIMPIEZA DE DERRUMBES INCLUYE TRANSPORTE
TRANSPORTE DE MATERIAL DE EXCAVACION
MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONADO
TRANSPORTE DE MATERIAL DE MEJORAMIENTO
EXCAVACION Y RELLENO PARA ESTRUCTURAS MENORES
HORMIGON CICLOPEO (60% H.S., 40% PIEDRA) EN MUROS INCLUYE ENCOFRADO
TUBERIA DE ACERO CORRUGADO D = 1.20 m., e = 2 mm

URAL DE LA PARROQUIA BELLAVISTA

ADES Y PRECIOS
FORMULARIO N 2

quia Bellavista, Cantn Espndola, Provincia de Loja


Bellavista, Cantn Espndola, Provincia de Loja

UNIDAD
Ha.
KM.
M3
M3
M3/KM
M3
M3/KM
M3
M3
ML

CANTIDAD
9.66
3.22
203010.02
1800.00
298038.14
11306.27
11306.27
548.64
189.36
96.00

P.UNITARIO

403.99
904.48
1.3
1.44
0.3
5.5
0.3
6.16
171.47
210.29

P.TOTAL
3,902.54
2,912.43
263,913.03
2,592.00
89,411.44
62,184.49
3,391.88
3,379.62
32,469.56
20,187.84

SUBTOTAL

484,344.83

IVA: (12% )
TOTAL:

58,121.38
542,466.21

GOBIERNO AUTONOMO DESCENTRALIZADO RURAL DE LA PARROQ


VOLUMENES DE CANTIDADES DE OBRA DE CONSTRUCCIN
Va San Ramn - El Lance
1.- OPERACIONES PRELIMINARES
1

DESBROCE, DESBOSQUES Y LIMPIEZA


Longitud total de la va
Ancho lado Izquierdo
Ancho lado Derecho

3221.16
15.00
15.00

REPLANTEO, NIVELACIN Y COLOCACIN DE LATERALES


Longitud total de la va
Nmero de replanteos

3221.16
1

2.- MOVIMIENTO DE TIERRAS


3

EXCAVACIN SIN CLASIFICAR A MQUINA


EXCAVACIN
% Uso suelo

LIMPIEZA DE DERRUMBES
NMERO DE DERRUMBES PROMEDIO
LONGITUD
ANCHO
ALTURA
VOLUMEN TOTAL

312323.11
35%

10
15
6
2
1800

TRANSPORTE DE MATERIAL DE EXCAVACIN


VOLUMEN TOTAL EXCAVACIN
203010.02
DISTANCIA PROMEDIO TRANSPORTE
1.50
RELLENO
4,317.93
VOLUMEN DE ACARREO 298038.14

3.- CALZADA
6

CAPA DE MEJORAMIENTO CON SUELO SELECCIONADO


LONGITUD
ANCHO
ALTURA
% Compactacin
VOLUMEN PARCIAL

3221.16
6.00
0.30
95%
11306.27

TRANSPORTE MATERIAL DE MEJORAMIENTO


Volmen Mejoramiento
Distancia recorrido

11306.27
1

4.- DRENAJE
8
CAJONES

EXCAVACIN Y RELLENO PARA ESTRUCTURAS


VIA PRINCIPAL
ALCANTARILLA = 1.20 m, ARMCO
LONGITUD TOTAL DE TUBERA

96.00

ESTRUCTURAS DE ENTRADA
VIA PRINCIPAL
NMERO DE ALCANT. = 1.20 ARMCO
LONGITUD

12.00
2.00

ESTRUCTURAS DE SALIDA
VIA PRINCIPAL
NMERO DE ALCANT. = 1.20 ARMCO
LONGITUD

12.00
2.00

VOLUMEN TOTAL EXCAVACION Y RELLENO =


9

HORMIGN CICLOPEO (60% H.S., 40% PIEDRA) EN MUROS, INCLUYE ENCOFRADO


VIA PRINCIPAL
ALCANTARILLAS DE ARMCO =1.2 TIPO I-II

10

12.00

TUBERA DE ACERO CORRUGADO = 1,20 Mts E = 2 MM


Va

LONGITUD
96.00

RURAL DE LA PARROQUIA BELLAVISTA


OBRA DE CONSTRUCCIN
- El Lance
Ha
m
m
m

Area m
48317.4
48317.4

m
m

9.66

TOTAL

9.66
Km

m
TOTAL

3.22

VOL. EXCAVACIN (m)

203010.02
m

m
m
m
m

1800.00
m/Km

m
Km
m/Km

298038.14

m
m
m
m
m
VOLUMEN TOTAL MEJORAMIENTO =

11306.27
m - Km

m
Km

VOLUMEN TOTAL MEJORAMIENTO =

11306.27

ANCHO

ALTO

VOLUMEN

1.8

2.00

345.60

VOLUMEN EN CAJONES =

345.60

ANCHO

ALTO

VOLUMEN

1.80

2.20

95.04

u
m

VOLUMEN EN ESTRUC. ENTRADA =

95.04

ANCHO

ALTO

VOLUMEN

1.80

2.50

108.00

u
m

VOLUMEN EN ESTRUC. SALIDA =

XCAVACION Y RELLENO =

108.00
548.64

NCLUYE ENCOFRADO

m
Volumen/Alc.

15.78

189.36
m

96.00

GOBIERNO AUTONOMO DESCENTRALIZADO RURAL D


PROYECTO: VIA SAN RAMON - EL LANCE
NOMBRE CONSULTOR: ING. JOSE V. ZHININ LITUMA
PLAZO: 120 DIAS

CRONOGRAMA VALORADO DE TRA


N

DESCRIPCION

CANTIDAD

1.- OPERACIONES PRELIMINARES


1 DESBROCE, DESBOSQUE Y LIMPIEZA

9.66

2 REPLANTEO Y NIVELACION Y COLOCACION DE LATERALES

3.22

2.- MOVIMIENTO DE TIERRAS


3 EXCAVACION SIN CLASIFICAR A MAQUINA

4 LIMPIEZA DE DERRUMBES INCLUYE TRANSPORTE

5 TRANSPORTE DE MATERIAL DE EXCAVACION

203010.02

1800.00

298038.14

3.- CALZADA
6 MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONAD

11306.27

7 EXPLOTACION, CARGADA Y TRANSPORTE DE MATERIAL DE MEJ

11306.27

4.- DRENAJE
8 EXCAVACION Y RELLENO PARA ESTRUCTURAS MENORES

548.64

9 HORMIGON CICLOPEO (60%H.S., 40% PIEDRA) EN MUROS, INC

189.36

10 TUBERIA DE ACERO CORRUGADO D = 1.20 m., e = 2 mm

96.00

TOTAL
PARCIAL
ACUMULADO
PARCIAL
ACUMULADO

LIZADO RURAL DE LA PARROQUIA BELLAVISTA

VALORADO DE TRABAJOS
PRECIO
UNITARIO

PRECIO
TOTAL

403.99

3,902.54

904.48

2,912.43

1.30

263,913.03

1.44

2,592.00

0.30

89,411.44

5.50

62,184.49

0.30

3,391.88

6.16

3,379.62

171.47

32,469.56

210.29

20,187.84

PERIODOS EN MESES
2
3

9.66
3,902.54
=========
3.22
2,912.43
=========
50,752.51
50,752.51
50,752.51
50,752.51
65,978.26
65,978.26
65,978.26
65,978.26
=====================================
450.00
450.00
450.00
450.00
648.00
648.00
648.00
648.00
=====================================
74,509.54
74,509.54
74,509.54
74,509.54
22,352.86
22,352.86
22,352.86
22,352.86
=====================================
2,826.57
2,826.57
2,826.57
2,826.57
15,546.12
15,546.12
15,546.12
15,546.12
=====================================
2,826.57
2,826.57
2,826.57
2,826.57
847.97
847.97
847.97
847.97
=====================================
274.32
274.32
1,689.81
1,689.81
===================
94.68
94.68
16,234.78
16,234.78
===================
48.00
48.00
10,093.92
10,093.92
===================

484,344.83
112,188.18
112,188.18
23.16
23.16

105,373.21
217,561.39
21.76
44.92

133,391.72
350,953.11
27.54
72.46

133,391.73
484,344.83
27.54
100.00

9.66
3,902.54
3.22
2,912.43
203,010.02
263,913.03

========

1,800.00
2,592.00

========

298,038.14
89,411.44

========

11,306.27
62,184.49

========

11,306.27
3,391.88

========

548.64
3,379.62

========

189.36
32,469.56

========

========

96.00
20,187.84

9.66
3.22
203010.02
1800.00
298038.14
11306.27
11306.27
548.64
189.36
96.00

403.99
904.48
1.3
1.44
0.3
5.5
0.3
6.16
171.47
210.29

COMPONENTES

VA SAN RAMON - EL LANCE


OBRAS PRELIMINARES
DESBROCE, DESBOSQUE Y LIMPIEZA
REPLANTEO, NIVELACIN Y FRANJA TOPOGRFICA
MOVIMIENTO DE TIERRAS
EXCAVACIN SIN CLASIFICAR
LIMPIEZA DE DERRUMBES
TRANSPORTE DE MATERIALES
CALZADA
MEJORAMIENTO DE LA SUBRASANTE CON SUELO ELECCIONADO
TRANSPORTE DE SUELO SELECCIONADO PARA MEJORAMIENTO DE LA SUBRASANTE
DRENAJE
EXCAVACIN Y RELLENO PARA ESTRUCTURAS

HORMIGON CICLOPEO (60% H.S., 40% PIEDRA) EN MUROS INCLUYE ENCOFRADO


TUBERIA DE ACERO CORRUGADO D = 1200mm, e = 2.00mm

COMPONENTES ADICION
SUBTOTAL
IVA 12%
SUPERVISION (2%)
FISCALIZACION (4%)
TOTAL

CRONOGRAMA VALORADO POR COMPONENTES Y FUENTES DE FINANCIAMIENTO (DOLARES)

PERIODO 1

EXTERNAS

INTERNAS

COOPERACIN

RECURSOS PROPIOS

PERIODO 2

PERIODO 3

PERIODO 4

PERIODO 1

PERIODO 2

3902.540
1456.215

1456.215

131956.515

131956.515

648.000

648.000

648.000

648.000

22352.860

22352.860

22352.860

22352.860

15546.123

15546.123

15546.123

15546.123

847.970

847.970

847.970

847.970

1689.810

1689.810

16234.780

16234.780

10093.920

10093.920

COMPONENTES ADICIONALES
172807.683

171351.468

67413.463

67413.463

5358.755

0.000

20736.922

20562.176

8089.616

8089.616

643.051

3456.154

3427.029

1348.269

1348.269

107.175

6912.307

6854.059

2696.539

2696.539

214.35

203913.066

202194.732

79547.887

79547.887

6323.331

0.000

NCIAMIENTO (DOLARES)
INTERNAS

TOTAL

RECURSOS PROPIOS
PERIODO 3

PERIODO 4

3,902.540

3902.54

2,912.430

2912.430

263,913.030

263913.030

2,592.000

2592

89,411.440

89411.44

62,184.490

62184.49

3,391.880

3391.88

3,379.620

3379.62

32,469.560

32469.56

20,187.840

20187.84

0.000

0.000

484344.830

58,121.380
9,686.897

19,373.793

0.000

0.000

571,526.900

COMPONENTES/RUBROS
VA SAN RAMON - EL LANCE
OBRAS PRELIMINARES
DESBROCE, DESBOSQUE Y LIMPIEZA
REPLANTEO, NIVELACIN Y FRANJA TOPOGRFICA
MOVIMIENTO DE TIERRAS
EXCAVACIN SIN CLASIFICAR
LIMPIEZA DE DERRUMBE
TRANSPORTE DE MATERIALES
CALZADA
MEJORAMIENTO DE LA SUBRASANTE CON SUELO ELECCIONADO
TRANSPORTE DE SUELO SELECCIONADO PARA MEJORAMIENTO DE LA SUBRASANTE
DRENAJE
EXCAVACIN Y RELLENO PARA ESTRUCTURAS

HORMIGON CICLOPEO (60% H.S., 40% PIEDRA) EN MUROS INCLUYE ENCOFRADO


TUBERIA DE ACERO CORRUGADO D = 1200mm, e = 2.00mm
COMPONENTES ADICIONALES
IVA 12%
SUPERVISION (2%)
FISCALIZACION (4%)
TOTAL

TIPO DE BIEN

ORIGEN DE LOS INSUMOS (USD Y


NACIONAL

IMPORTADO

TOTAL

EL LANCE
100%

3,902.54

3,902.54

3902.54

100%

2,912.43

2,912.43

2912.430

100%

263,913.03

263,913.03

263913.030

100%

2,592.00

2,592.00

2592

100%

89,411.44

89,411.44

89411.44

100%

62,184.49

62,184.49

62184.49

100%

3,391.88

3,391.88

3391.88

100%

3,379.62

3,379.62

3379.62

100%

32,469.56

32,469.56

32469.56

100%

20,187.84

20,187.84

20187.84

100%

58,121.38

0.00

58,121.38

100%

9,686.90

0.00

9,686.90

19,373.79

0.00

100%

87,182.07

19,373.79
87,182.07