Documentos de Académico
Documentos de Profesional
Documentos de Cultura
DATOS
FSD
FSV
ANGULO FRIC. INTERNO
COEF. EMP. ACTIVO
COEF. EMP. PASIVO
COEF. FRICCION DESL.
PESO ESPECIF. RELLENO
PESO ESPECIF. CONC
SOBRECARGA
ALTURA EQUIV. S/C
ALTURA PANTALLA
CAPACID. PORTANTE
ALTURA EMP. PASIVO
1.5
2
35
0.271
3.690
0.55
1.8
s
2.4
0.5
0.278
7.95
1.2
t
1.2
CONCRETO
ACERO
210
4200
grados
1/3
1/3H
H--2/3
2/3H
H
ton/m3
ton/m3
ton/m2
m.
m.
kg/cm2
m.
20
20cm.
cm.min.
min.
H
H
kg/cm2
kg/cm2
HH/1/144 aa HH/1/122
DATOS
0.40H
0.40H--0.7H
0.7H
PREDIMENSIONAMIENTO
H
B
hz
B1
2H/5 a 2H/3
H/14 a H/12
B/4 a B/3
8.7
m
3.48
0.621
1.425
a
a
a
5.8
0.725
1.900
tp1
>= 20 cm
20
30
40
H/3 a 2H/3
2.900
5.8
0.2
7.95
Concreto Avanzado
tp1 diseo
tp2 diseo
2.3
1.2
0.75
0.2
5.7
PASO 03
VERIFICACION DE ESTABILIDAD
FUERZAS RESISTENTES
DESCRIPCION PESO (Ton) BRAZO (m)
P1 (zapata)
10.44
2.90
P2 (pantalla)
3.82
2.40
P3 (pantalla)
2.30
P4 (relleno Tal
47.22
4.15
P5 (relleno Pie)
1.86
1.15
Ps/c
1.65
4.15
TOTAL
64.99
Mto. (Tn.m)
30.28
9.16
195.98
2.14
6.85
244.40
Ps/c
P2
P
5 P3
P
1
FUERZAS ACTUANTES
DESCRIPCION FUERZA (Ton) BRAZO (m)
Ha (empuje acti
18.46
2.90
Hp (empuje pasi
-4.78
0.40
E s/c (empuje s/
1.18
4.35
TOTAL
14.86
FSD=
FSV=
2.41
4.31
PASO 04
Xo=
e=
B/6=
B/6>e
>
>
Mto. (Tn.m)
53.53
-1.91
5.13
56.75
CORRECTO
CORRECTO
1.5
2
q1=
q2=
m.
m.
m.
RESULTANTE DENTRO DEL TERCIO CENTRAL
1.14 kg/cm2
1.106 kg/cm2
q1<Gt
q2<Gt
P
4
BIEN
BIEN
q1
L=
Concreto Avanzado
3.50
20.00
15.22
100.00
94.50
2,100.00
9.00
0.90
Asmin= 0.0020*b*d
Asmin=
cm.
cm. (recubrimento 4 cm. y acero 5/8")
cm.
kg/cm2
kg/cm2
M(+)=WL^2/16
3.04 cm2/m.
As+ (cm2)
M+ (ton-m)
1.60
1.22
2.57
1.97
4.01
3.07
4.24
6.82
10.64
M () 0.0 3 K a H P L
M (-) =
M(+)=M(-)/4
As - (cm2)
As+ (cm2)
3.24
0.81
11.20
3.60
ton-m
ton-m
cm2 Usar:
cm2 Usar:
altura corte=
3/8" cada
3/8" cada
6
20
1.80 ton/m
17.68 ton/m
46.76 ton-m
66.70 cm. (recubrimento 7.5 cm. y 1/2 acero 5/8")
100 cm.
210.00 kg/cm2
4,200.00 kg/cm2
W=
0.058
As=
Asmin= 0.0018*b*d
Asmin=
19.20 cm2/m.
cm.
12.01 cm2/m Usar: 5/8" cada
Concreto Avanzado
10
11.23 ton/m
11.06 ton/m
5.55 ton/m (extremo)
7.92 ton/m (extremo)
6.07 ton-m
8.09 ton-m
-41.58 ton-m
66.70 cm.
100 cm.
210.00 kg/cm2
4,200.00 kg/cm2
12.01 cm2
W+=
A+s=
W-=
A-s=
0.007
2.42 cm2 Usar:
0.010
3.23 cm2 Usar:
3.30
11.23
cm.
5/8" cada
17
5/8" cada
17
cm.
REFUERZO TRANSVERSAL
Armadura de montaje (3/8" o 1/2")
S 36 45 cm.
3/8" cada
Asmontaje USAR :
34 cm.
M K a
As
3
HP
H2
K a Ho P
6
2
Hp
Mu
tP
fy ( d ) cos
2
H(m)
3.00
5.00
7.95
Mu (ton-m)
14.38
59.87
225.63
d (cm)
Asmin(cm2)
As (cm2)
136.23
4.63
4.63
219.05
7.45
7.83
338.00
11.49
19.13
Vu (ton)
3.00
5.00
7.95
Mu (ton-m)
13.17
14.38
33.91
59.87
81.94
225.63
d (cm)
Vu1 (ton)
136.23
8.79
219.05
22.56
338.00
54.22
-10.59
-7.11
11.87
E1 (ton/m)
Es/c (ton/m)
Tu (ton)
Concreto Avanzado
As (cm2)
1.46
2.44
3.88
0.14
0.14
0.14
7.98
12.76
19.81
2.11
3.37
5.24
7.92 ton/m
27.73 ton
7.34 cm2 Usar
3/8" cada
Concreto Avanzado
64
1/3
1/3 H
H-- 2/3
2/3H
H
20
20cm.
cm.min.
min.
HH/1/144 aa HH/1/122
H
H
0.40H
0.40H--0.7H
0.7H
B diseo
hz diseo
B1 diseo
B2 diseo
tp1 diseo
tp2 diseo
L diseo
5.7
0.75
2.3
3.5
0.2
0.2
3
m
m
m
m
m
m
m
0.5 ton/m
8.7
Concreto Avanzado
3.2
q2
yamachiro
Concreto Avanzado
M(-)=WL^2/12
3/8"
0.71
3/8"
M - (ton-m) As - (cm2) 1
17
10
7
1.63
2.63
4.10
5.65
9.10
14.18
13
8
5
1.2 m.
Concreto Avanzado
B
11.06 Ton/m
S/C
Ka Ho Hp
1
Ka Hp 2
2
Concreto Avanzado
Concreto Avanzado