Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Number of Buses:
Number of Branches:
Number of Machines:
Swing
V-Control
Load
Total
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
Synchronous
Generator
Power
Grid
Synchronous
Motor
Induction
Machines
Lumped
Load
Total
System Frequency:
60 Hz
Unit System:
English
Project Filename:
CortoCircuito
Output Filename:
C:\ETAP 600\CortoCircuito\Corto3fases.SA1
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Adjustments
Apply
Tolerance
Individual
Adjustments
/Global
Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
No
No
Cable Length:
No
Apply
Temperature Correction
Percent
Individual
Adjustments
/Global
Yes
Individual
Cable Resistance:
Yes
Individual
Degree C
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Bus
ID
Type
Initial Voltage
Nom. kV
Base kV
Sub-sys
%Mag.
Ang.
Bus1
SWNG
34.500
34.500
100.00
0.00
Bus2
Gen.
13.800
13.800
100.00
0.00
Bus3
Load
13.800
13.800
100.00
0.00
Bus4
Load
4.160
4.160
100.00
0.00
Bus5
Load
0.480
0.480
100.00
0.00
T2~
Load
34.500
34.500
100.00
0.00
6 Buses Total
All voltages reported by ETAP are in % of bus Nominal kV.
Base kV values of buses are calculated and used internally by ETAP.
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
Transformer
ID
Rating
MVA
Prim. kV
Sec. kV
Z Variation
%Z
X/R
% Tap Setting
+ 5%
- 5%
% Tol.
Prim.
Sec.
Adjusted
%Z
Phase Shift
Type
Angle
T1
10.000
34.500
13.800
2.00
15.50
2.0000
0.0
T3
1.500
4.160
0.480
5.75
7.10
5.7500
0.0
Rating
Winding
kV
Impedance
%Z
Z Variation
Phase Shift
X/R
MVAb
% Tol.
+ 5%
- 5%
Primary:
15.000
34.500
Zps =
10.00
15.50
15.000
Secondary:
10.000
13.800
Zpt =
10.00
10.00
15.000
0.0
5.000
4.160
Zst =
10.00
7.50
15.000
0.0
Tertiary:
MVA
Tap
Type
Angle
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
Branch Connections
CKT/Branch
ID
Connected Bus ID
Type
From Bus
T1
2W XFMR
Bus1
Bus3
1.29
19.96
20.00
T3
2W XFMR
Bus4
Bus5
53.48
379.58
383.33
T2
3W Xfmr
Bus1
T2~
1.06
33.39
33.41
3W Xfmr
Bus2
T2~
3.23
33.14
33.29
3W Xfmr
Bus4
T2~
5.58
32.94
33.41
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
Power Grid
Connected Bus
ID
ID
U1
Bus1
% Impedance
100 MVA Base
Rating
MVASC
kV
1500.000
X/R
34.500
15.50
0.42922
6.65284
Connected Bus
Type
Turbo
ID
Bus2
Rating
MVA
8.824
X/R Ratio
kV
RPM
X"/R
X'/R
13.800
1800
48.00
48.00
Xd"
R
0.250
Adj.
12.00
Tol.
0.0
Xd'
23.00
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
Type
Connected Bus
Qty
ID
Rating
kVA
X/R Ratio
kV
RPM
X"/R
X'/R
Xd"
R
Adj.
Tol.
Xd'
Syn2
Motor
Bus2
1075.9
13.200
1800
26.23
26.23
0.587
15.38
0.0
23.08
Syn1
Motor
Bus3
2981.8
13.200
1800
34.00
34.00
0.452
15.38
0.0
23.08
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
SHORT-CIRCUIT REPORT
Bus3
= 14.490
=
=
Contribution
From Bus
ID
1/2 Cycle
To Bus
ID
%V
From Bus
kA
Real
kA
Imaginary
1.5 to 4 Cycle
Imag.
/Real
kA Symm.
Magnitude
%V
From Bus
kA
Real
kA
Imaginary
Imag.
/Real
kA Symm.
Magnitude
Bus3
Total
0.00
1.093
-17.510
16.0
17.544
0.00
1.084
-17.197
15.9
17.231
Bus1
Bus3
79.42
1.066
-16.580
15.6
16.614
79.41
1.066
-16.577
15.6
16.611
Syn1
Bus3
109.77
0.027
-0.930
34.0
0.930
109.77
0.018
-0.620
34.0
0.620
# T2~
Bus1
83.92
0.009
-0.225
26.4
0.225
83.82
0.008
-0.221
26.8
0.221
U1
Bus1
105.00
0.418
-6.407
15.3
6.420
105.00
0.418
-6.410
15.3
6.424
# Bus2
T2~
88.40
0.009
-0.225
26.4
0.225
88.21
0.008
-0.221
26.8
0.221
# Bus4
T2~
83.92
0.000
0.000
999.9
0.000
83.82
0.000
0.000
999.9
0.000
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
Bus4
= 4.368
=
=
Contribution
From Bus
ID
1/2 Cycle
To Bus
ID
%V
From Bus
kA
Real
kA
Imaginary
1.5 to 4 Cycle
Imag.
/Real
kA Symm.
Magnitude
%V
From Bus
kA
Real
kA
Imaginary
Imag.
/Real
kA Symm.
Magnitude
Bus4
Total
0.00
2.324
-22.257
9.6
22.378
0.00
2.312
-22.197
9.6
22.317
Bus5
Bus4
0.00
0.000
0.000
999.9
0.000
0.00
0.000
0.000
999.9
0.000
# T2~
Bus4
53.88
2.324
-22.257
9.6
22.378
53.73
2.312
-22.197
9.6
22.317
# Bus1
T2~
96.56
0.223
-2.138
9.6
2.149
96.50
0.223
-2.142
9.6
2.154
# Bus2
T2~
64.78
0.058
-0.546
9.5
0.549
64.39
0.056
-0.534
9.6
0.537
Bus3
Bus1
96.90
0.002
-0.029
14.1
0.029
96.74
0.001
-0.019
14.3
0.020
U1
Bus1
105.00
0.221
-2.109
9.6
2.120
105.00
0.222
-2.123
9.6
2.134
Gen1
Bus2
105.00
0.129
-1.237
9.6
1.244
105.00
0.129
-1.249
9.7
1.256
Syn2
Bus2
109.77
0.016
-0.128
8.2
0.129
109.77
0.010
-0.086
8.3
0.087
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
10
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
Bus
ID
Bus3
Bus4
Method:
Device
kV
Momentary Duty
ID
Type
Symm.
kA rms
X/R
Ratio
M.F.
Asymm.
kA rms
Device Capability
Asymm.
kA Crest
Symm.
kA rms
Asymm.
kA rms
Asymm.
kA Crest
13.800
Bus3
Bus
17.544
16.6
1.539
27.002
45.336
13.800
CB7
3 cy Sym CB
17.544
16.6
1.539
27.002
45.336
32.000 #
54.000 #
13.800
CB3
3 cy Sym CB
17.544
16.6
1.539
27.002
45.336
32.000 #
54.000 #
4.160
Bus4
Bus
22.378
9.6
1.428
31.950
54.451
4.160
CB5
3 cy Sym CB
22.378
9.6
1.428
31.950
54.451
32.000
54.000 *
4.160
CB12
3 cy Sym CB
22.378
9.6
1.428
31.950
54.451
32.000
54.000 *
4.160
CB10
3 cy Sym CB
22.378
9.6
1.428
31.950
54.451
32.000
54.000 *
4.160
CB16
3 cy Sym CB
22.378
9.6
1.428
31.950
54.451
32.000
54.000 *
ETAP
Project:
6.0.0
Location:
Contract:
Engineer:
Filename:
Study Case: SC
CortoCircuito
Page:
11
Date:
09-21-2016
SN:
12345678
Revision:
Base
Config.:
Normal
Bus
ID
Device
kV
ID
Interrupting Duty
Type
CPT
(Cy)
Symm.
kA rms
X/R
Ratio
M.F.
Device Capability
Adj. Sym.
kA rms
kV
Test
PF
Rated
Int.
Adjusted
Int.
Bus3
13.800 CB7
3 cy Sym CB
2.0
17.231
16.3
1.000
17.231
121.000
20.000
20.000
CB3
3 cy Sym CB
2.0
17.231
16.3
1.000
17.231
121.000
20.000
20.000
Bus4
4.160 CB5
3 cy Sym CB
2.0
22.317
9.6
1.000
22.317
121.000
20.000
20.000 *
CB12
3 cy Sym CB
2.0
22.317
9.6
1.000
22.317
121.000
20.000
20.000 *
CB10
3 cy Sym CB
2.0
22.317
9.6
1.000
22.317
121.000
20.000
20.000 *
CB16
3 cy Sym CB
2.0
22.317
9.6
1.000
22.317
121.000
20.000
20.000 *
Method: