NO.
KOMPONEN
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
B BAHAN
1 Usuk : 5/7
2 Paku Kayu Segala Ukuran
3 Papan (2x20) cm
HARGA
SATUAN
(Rp.)
: 1 m' Pengukuran dan pemasangan bouwplank
SATUAN
PERKIRAAN
KUANTITAS
JUMLAH
HARGA
(Rp.)
L17
Org/hr
L08
Org/hr
L03
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
0.1000
0.0900
0.0090
0.0020
50,000.00
60,000.00
70,000.00
75,000.00
5,000.00
5,400.00
630.00
150.00
11,180.00
M061
m3
M140
kg
M063
m3
JUMLAH HARGA BAHAN
0.0100
0.0200
0.0070
1,018,828.00
18,000.00
1,018,828.00
10,188.28
360.00
7,131.80
17,680.08
C PERALATAN
JUMLAH HARGA PERALATAN
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.0400
28,860.08
50,000.00
60,000.00
70,000.00
75,000.00
20,000.00
3,000.00
23,000.00
B BAHAN
C PERALATAN
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
Org/hr
L08
Org/hr
L03
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
23,000.00
0.1920
0.0190
50,000.00
60,000.00
70,000.00
75,000.00
9,600.00
1,425.00
11,025.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
11,025.00
50,000.00
60,000.00
70,000.00
75,000.00
15,000.00
750.00
15,750.00
54,984.00
54,984.00
54,984.00
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
70,734.00
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
: 1 m3 Urugan sirtu
L17
L08
L03
L01
Org/hr###
Org/hr###
Org/hr###
Org/hr###
0.3000
0.0100
50,000.00
60,000.00
70,000.00
75,000.00
M007
m3
15,000.00
750.00
15,750.00
1.0000
98,000.00
98,000.00
98,000.00
C PERALATAN
JUMLAH HARGA PERALATAN
113,750.00
50,000.00
60,000.00
70,000.00
75,000.00
M001
m3
15,000.00
750.00
15,750.00
1.0000
54,984.00
54,984.00
54,984.00
C PERALATAN
JUMLAH HARGA PERALATAN
70,734.00
50,000.00
Org/hr###
6.6670
-
Org/hr###
0.0330
75,000.00
Pekerja Biasa
L17
Org/hr###
Tukang Kayu
L08
Org/hr###
L03
Mandor
L01
60,000.00
70,000.00
333,350.00
2,475.00
335,825.00
B BAHAN
C PERALATAN
Pekerja Biasa
L17
Org/hr###
Tukang Kayu
L08
Org/hr###
L03
Org/hr###
Mandor
L01
Org/hr###
335,825.00
1.1000
0.0500
50,000.00
60,000.00
70,000.00
75,000.00
55,000.00
3,750.00
58,750.00
B BAHAN
C PERALATAN
58,750.00
JENIS PEKERJAAN
A. TENAGA
: 1 m2 bongkar lantai
Pekerja Biasa
L17
Org/hr###
0.2000
50,000.00
Tukang Kayu
L08
Org/hr###
L03
Org/hr###
60,000.00
3
4
Mandor
L01
Org/hr###
0.0100
75,000.00
70,000.00
10,000.00
750.00
10,750.00
B BAHAN
C PERALATAN
10,750.00
Pekerja Biasa
L17
Org/hr###
0.2000
50,000.00
10,000.00
Tukang Kayu
L08
Org/hr###
60,000.00
3,600.00
L03
Org/hr###
0.0600
0.0060
70,000.00
420.00
Mandor
L01
Org/hr###
0.0100
75,000.00
750.00
14,770.00
B BAHAN
C PERALATAN
Pekerja Biasa
L17
Org/hr###
Tukang Kayu
L08
Org/hr###
L03
Org/hr###
Mandor
L01
Org/hr###
0.3300
0.0100
14,770.00
50,000.00
60,000.00
70,000.00
75,000.00
16,500.00
750.00
17,250.00
B BAHAN
C PERALATAN
E38
hari
0.0095
1,928,776.60
18,369.30
Pekerja Biasa
L17
Org/hr###
Tukang Kayu
L08
Org/hr###
L03
Org/hr###
Mandor
L01
Org/hr###
18,369.30
0.1000
0.0500
35,619.30
50,000.00
60,000.00
70,000.00
75,000.00
5,000.00
3,750.00
8,750.00
B BAHAN
C PERALATAN
8,750.00
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
B BAHAN
1 Batu Belah Kali
2 Pasir Urug
: 1 m3 Anstamping
L17
Org/hr
L07
Org/hr
L02
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
0.7800
0.3900
0.0390
0.0390
50,000.00
60,000.00
70,000.00
75,000.00
39,000.00
23,400.00
2,730.00
2,925.00
68,055.00
M011
m3
M001
m3
JUMLAH HARGA BAHAN
1.2000
0.3000
128,800.00
54,984.00
154,560.00
16,495.20
171,055.20
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 m3 Pasang pondasi batu kali, 1 Pc : 6 Ps
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
1.5000
50,000.00
2 Tukang Batu
L07
Org/hr
0.6000
60,000.00
3 Kepala Tukang Batu
L02
Org/hr
0.0600
70,000.00
4 Mandor
L01
Org/hr
0.0750
75,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Batu Belah Kali
M011
m3
1.1000
128,800.00
2 Portland Cement (PC)
M037
kg
117.0000
1,451.00
3 Pasir Pasang
M002
m3
0.5610
84,094.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 m3 Lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
1.6500
50,000.00
2 Tukang Batu
L07
Org/hr
0.0250
60,000.00
3 Kepala Tukang Batu
L02
Org/hr
0.2500
70,000.00
4 Mandor
L01
Org/hr
0.0800
75,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Portland Cement (PC)
M037
kg
218.0000
1,451.00
2 Pasir Cor
M004
m3
0.5200
84,094.00
3 Stenslah/batu pecah tangan 2/3
M014
m3
0.8700
184,825.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
239,110.20
75,000.00
36,000.00
4,200.00
5,625.00
120,825.00
141,680.00
169,767.00
47,176.73
358,623.73
479,448.73
82,500.00
1,500.00
17,500.00
6,000.00
107,500.00
316,318.00
43,728.88
160,797.75
520,844.63
628,344.63
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Tukang Kayu
4 Tukang Besi/Baja
5 Kepala Tukang Batu
6 Mandor
B BAHAN
a Beton
1 Portland Cement (PC)
2 Pasir Cor
3 Besi Polos 10
4 Besi polos 8
5 Batu pecah mesin 2/3
M037
M004
M546
M554
M019
kg
m3
kg
kg
m3
b
1
2
3
M063
M140
M135
m3
kg
kg
Bekisting
Papan (2x20) cm
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
265,000.00
16,500.00
78,000.00
63,000.00
18,550.00
19,875.00
460,925.00
247.0000
0.5200
115.7333
61.1333
0.7800
1,451.00
84,094.00
10,350.00
10,350.00
197,800.00
358,397.00
43,728.88
1,197,840.00
632,730.00
154,284.00
2,386,979.88
0.0040
1,018,828.00
0.0400
18,000.00
0.4500
17,250.00
Bekisting 2 kali pakai
4,075.31
720.00
7,762.50
6,278.91
2,393,258.79
Bekisting
Usuk : 5/7
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
Balok
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M061
M140
M135
M062
M217
M089
m3
kg
kg
m3
lbr
btg
0.0320
1,018,828.00
0.3200
18,000.00
0.2250
17,250.00
0.1200
0.2800
165,000.00
16.0000
Bekisting 2 kali pakai
2,854,183.79
317,500.00
16,500.00
99,000.00
84,000.00
23,310.00
23,850.00
564,160.00
468,673.00
43,728.88
1,286,712.00
569,457.00
154,284.00
2,522,854.88
32,602.50
5,760.00
3,881.25
46,200.00
49,042.50
2,571,897.38
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) LANTAI 1
3,136,057.38
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Tukang Kayu
4 Tukang Besi/Baja
5 Kepala Tukang Batu
6 Mandor
B BAHAN
a Beton
1 Portland Cement (PC)
2 Pasir Cor
3 Besi Ulir 19
4 Besi Polos 10
5 Batu pecah mesin 2/3
M037
M004
M544
M546
M019
kg
m3
kg
kg
m3
b
1
2
3
4
5
6
M061
M140
M135
M062
M217
M089
m3
kg
kg
m3
lbr
btg
Bekisting
Usuk : 5/7
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
Balok
Multiplek 9 mm
Dolken Kayu Dia 8 cm
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
317,500.00
16,500.00
99,000.00
84,000.00
23,310.00
23,850.00
564,160.00
384.0000
0.5400
245.0000
116.3815
0.8100
1,451.00
84,094.00
11,000.00
10,350.00
197,800.00
557,184.00
45,410.76
2,695,000.00
1,204,548.33
160,218.00
4,662,361.09
0.3200
1,018,828.00
3.2000
18,000.00
2.2500
17,250.00
0.1200
1,018,828.00
2.8000
165,000.00
16.0000
20,000.00
Bekisting 2 kali pakai
326,024.96
57,600.00
38,812.50
122,259.36
462,000.00
320,000.00
663,348.41
5,325,709.50
Bekisting
Usuk : 5/7
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
Balok
Multiplek 9 mm
Dolken Kayu Dia 8 cm
M061
M140
M135
M062
M217
M089
m3
kg
kg
m3
lbr
btg
5,889,869.50
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
280,000.00
16,500.00
93,600.00
84,000.00
22,610.00
21,225.00
517,935.00
1,451.00
84,094.00
10,350.00
197,800.00
487,536.00
45,410.76
1,976,396.47
160,218.00
2,669,561.23
0.3200
1,018,828.00
3.2000
18,000.00
2.2500
17,250.00
0.1400
1,018,828.00
2.8000
165,000.00
6.0000
20,000.00
Bekisting 2 kali pakai
326,024.96
57,600.00
38,812.50
142,635.92
462,000.00
120,000.00
573,536.69
3,243,097.92
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) LANTAI 1
3,761,032.92
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Tukang Kayu
4 Tukang Besi/Baja
5 Kepala Tukang Batu
6 Mandor
B BAHAN
a Beton
1 Portland Cement (PC)
2 Pasir Cor
4 Besi Polos 12
5 Batu pecah mesin 2/3
M037
M004
M541
M019
kg
m3
kg
m3
b
1
2
3
4
5
6
M061
M140
M135
M062
M217
M089
m3
kg
kg
m3
lbr
btg
Bekisting
Usuk : 5/7
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
Balok
Multiplek 9 mm
Dolken Kayu Dia 8 cm
5.6000
0.2750
1.5600
1.4000
0.3230
0.2830
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
280,000.00
16,500.00
93,600.00
84,000.00
22,610.00
21,225.00
517,935.00
336.0000
0.5400
183.7814
0.8100
1,451.00
84,094.00
10,350.00
197,800.00
487,536.00
45,410.76
1,902,137.83
160,218.00
2,595,302.59
0.3200
1,018,828.00
3.2000
18,000.00
2.2500
17,250.00
0.1400
1,018,828.00
2.8000
165,000.00
6.0000
20,000.00
Bekisting 2 kali pakai
326,024.96
57,600.00
38,812.50
142,635.92
462,000.00
120,000.00
573,536.69
3,168,839.28
Bekisting
Usuk : 5/7
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
Balok
Multiplek 9 mm
M061
M140
M135
M062
M217
m3
kg
kg
m3
lbr
0.1500
1.5000
1.5000
3,686,774.28
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
280,000.00
16,500.00
93,600.00
84,000.00
22,610.00
21,225.00
517,935.00
1,451.00
84,094.00
10,350.00
197,800.00
468,673.00
43,728.88
1,788,066.00
154,284.00
2,454,751.88
1,018,828.00
18,000.00
17,250.00
152,824.20
27,000.00
25,875.00
412,500.00
309,099.60
2,763,851.48
2.5000
165,000.00
Bekisting 2 kali pakai
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) LANTAI 1
3,281,786.48
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Tukang Kayu
4 Tukang Besi/Baja
5 Kepala Tukang Batu
6 Mandor
5.6000
0.2750
1.5600
1.4000
0.3230
0.2830
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
280,000.00
16,500.00
93,600.00
84,000.00
22,610.00
21,225.00
517,935.00
B BAHAN
a Beton
1 Portland Cement (PC)
2 Pasir Cor
4 Besi Polos 12
5 Batu pecah mesin 2/3
M037
M004
M541
M019
kg
m3
kg
m3
323.0000
0.5200
195.3600
0.7800
1,451.00
84,094.00
10,350.00
197,800.00
468,673.00
43,728.88
2,021,976.00
154,284.00
2,688,661.88
b
1
2
3
4
5
6
M061
M140
M135
M062
M217
M089
m3
kg
kg
m3
lbr
btg
0.1500
1.5000
1.5000
1,018,828.00
18,000.00
17,250.00
152,824.20
27,000.00
25,875.00
412,500.00
280,000.00
449,099.60
3,137,761.48
Bekisting
Usuk : 5/7
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
Balok
Multiplek 9 mm
Dolken Kayu Dia 8 cm
2.5000
165,000.00
14.0000
20,000.00
Bekisting 2 kali pakai
3,655,696.48
16,000.00
6,000.00
700.00
1,125.00
23,825.00
34,230.00
14,045.68
3,784.23
52,059.91
75,884.91
30,000.00
12,000.00
1,400.00
2,250.00
45,650.00
68,460.00
32,212.20
8,577.59
109,249.79
154,899.79
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
B BAHAN
1 Kalsiboard 9mm
M214
lbr
2 Gypsum Board t = 9 mm sekualitas Jayaboard
M213
lbr
3 Sekrup Segala Ukuran
M145
KG
4 Metalstud 34/75/5
M829
ljr
JUMLAH HARGA BAHAN
C PERALATAN
0.6500
0.6500
0.0650
0.0320
50,000.00
60,000.00
70,000.00
75,000.00
32,500.00
39,000.00
4,550.00
2,400.00
78,450.00
0.6000
0.6000
0.6000
2.6667
90,000.00
85,000.00
19,500.00
40,000.00
54,000.00
51,000.00
11,700.00
106,666.67
223,366.67
B BAHAN
1 HPL ex. Grasmerino
2 Lem Kayu
3 Multiplek 6 mm
10,000.00
18,000.00
2,100.00
750.00
30,850.00
60,000.00
4,087.50
64,087.50
301,816.67
94,937.50
0.2000
0.3000
0.0300
0.0100
50,000.00
60,000.00
70,000.00
75,000.00
10,000.00
18,000.00
2,100.00
750.00
30,850.00
M830
m2
M422
Ltr
M216
lbr
JUMLAH HARGA BAHAN
1.0000
0.1000
1.1520
60,000.00
20,437.50
95.00
60,000.00
2,043.75
109.44
62,153.19
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 m2 Pasang dinding batu andhesit
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
0.6200
2 Tukang Batu
L07
Org/hr
0.3500
3 Kepala Tukang Batu
L02
Org/hr
0.0350
4 Mandor
L01
Org/hr
0.0300
JUMLAH HARGA TENAGA
B BAHAN
1 Batu andesit hitam susun sirih kasar 20 x 40 cm
M566
m2
1.0500
2 Portland Cement (PC)
M037
kg
11.7500
3 Pasir Pasang
M002
m3
0.0350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
93,003.19
50,000.00
60,000.00
70,000.00
75,000.00
31,000.00
21,000.00
2,450.00
2,250.00
56,700.00
120,000.00
1,451.00
84,094.00
126,000.00
17,049.25
2,943.29
145,992.54
202,692.54
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1500
0.0150
0.0100
50,000.00
60,000.00
70,000.00
75,000.00
M037
kg
M002
m3
JUMLAH HARGA BAHAN
10,000.00
9,000.00
1,050.00
750.00
20,800.00
4.3200
0.0220
1,451.00
84,094.00
6,268.32
1,850.07
8,118.39
C PERALATAN
JUMLAH HARGA PERALATAN
10,258.57
1,765.97
12,024.54
39,399.54
0.1500
0.1000
0.0100
0.0080
50,000.00
60,000.00
70,000.00
75,000.00
7,500.00
6,000.00
700.00
600.00
14,800.00
3.2500
1,451.00
4,715.75
4,715.75
13,000.00
12,000.00
1,400.00
975.00
27,375.00
28,918.39
19,515.75
50,000.00
60,000.00
70,000.00
75,000.00
7,200.00
600.00
7,800.00
1,451.00
84,094.00
4,207.90
1,765.97
5,973.87
13,773.87
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
B BAHAN
1 Metal furing channel RG3, C Channel RG1,Channel M517
m2
2 Sekrup Segala Ukuran
M145
KG
JUMLAH HARGA BAHAN
C PERALATAN
Alat bantu
Ls
0.2000
0.3000
0.0300
0.0100
50,000.00
60,000.00
70,000.00
75,000.00
10,000.00
18,000.00
2,100.00
750.00
30,850.00
1.1000
0.3000
45,000.00
19,500.00
49,500.00
5,850.000
55,350.00
1.0000
5,000.00
5,000.00
5,000.00
30,940.000
5,850.000
36,790.00
45,515.00
0.0500
0.0500
0.0050
0.0030
50,000.00
60,000.00
70,000.00
75,000.00
2,500.00
3,000.00
350.00
225.00
6,075.00
1.1000
0.0500
15,000.00
20,437.50
16,500.00
1,021.88
17,521.88
5,000.00
3,000.00
350.00
375.00
8,725.00
91,200.00
23,596.88
15,500.00
10,500.00
2,450.00
2,250.00
30,700.00
230,000.00
16,512.38
3,531.95
3,796.88
253,841.20
284,541.20
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
B BAHAN
1 Keramik 40 x 40 sekualitas Roman
2 Portland Cement (PC)
3 Pasir Pasang
4 Portland Cement (PC) Warna
0.3100
0.1750
0.0350
0.0300
50,000.00
60,000.00
70,000.00
75,000.00
15,500.00
10,500.00
2,450.00
2,250.00
30,700.00
M553
m2
M037
kg
M002
m3
M039
kg
JUMLAH HARGA BAHAN
1.0000
11.3800
0.0420
1.5000
135,000.00
1,451.00
84,094.00
2,531.25
135,000.00
16,512.38
3,531.95
3,796.88
158,841.20
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 m2 Pasang keramik ukuran 40 x 40 cm sekualitas Roman
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
0.3100
50,000.00
2 Tukang Batu
L07
Org/hr
0.1750
60,000.00
3 Kepala Tukang Batu
L02
Org/hr
0.0350
70,000.00
4 Mandor
L01
Org/hr
0.0300
75,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Keramik 40 x 40 sekualitas Roman
M553
m2
1.0000
135,000.00
2 Portland Cement (PC)
M037
kg
11.3800
1,451.00
3 Pasir Pasang
M002
m3
0.0420
84,094.00
4 Portland Cement (PC) Warna
M039
kg
1.5000
2,531.25
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 m2 Pasang dinding keramik ukuran 25 x 50 cm
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
0.3000
50,000.00
2 Tukang Batu
L07
Org/hr
0.2250
60,000.00
3 Kepala Tukang Batu
L02
Org/hr
0.0450
70,000.00
4 Mandor
L01
Org/hr
0.0300
75,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Keramik 20x40
M561
m2
1.2000
105,000.00
2 Portland Cement (PC)
M037
kg
9.3000
1,451.00
3 Pasir Pasang
M002
m3
0.0180
84,094.00
4 Portland Cement (PC) Warna
M039
kg
1.5000
2,531.25
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 m2 Pasang lantai keramik KM ukuran 25 x 25 cm
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
0.3100
50,000.00
2 Tukang Batu
L07
Org/hr
0.1750
60,000.00
3 Kepala Tukang Batu
L02
Org/hr
0.0350
70,000.00
4 Mandor
L01
Org/hr
0.0300
75,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Keramik 25 x 25
M562
m2
1.0000
95,000.00
2 Portland Cement (PC)
M037
kg
11.3800
1,451.00
3 Pasir Pasang
M002
m3
0.0420
84,094.00
4 Portland Cement (PC) Warna
M039
kg
1.5000
2,531.25
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
189,541.20
15,500.00
10,500.00
2,450.00
2,250.00
30,700.00
135,000.00
16,512.38
3,531.95
3,796.88
158,841.20
189,541.20
15,000.00
13,500.00
3,150.00
2,250.00
33,900.00
126,000.00
13,494.30
1,513.69
3,796.88
144,804.87
178,704.87
15,500.00
10,500.00
2,450.00
2,250.00
30,700.00
95,000.00
16,512.38
3,531.95
3,796.88
118,841.20
149,541.20
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
B BAHAN
1 Stepnosing sekualitas roman 10 x 33
2 Portland Cement (PC)
bh
kg
0.0130
50,000.00
60,000.00
70,000.00
75,000.00
7,500.00
975.00
8,475.00
5.0000
10.0000
6,500.00
1,451.00
32,500.00
14,510.00
0.1250
47,010.00
C PERALATAN
JUMLAH HARGA PERALATAN
696.88
1,912.50
8,450.00
11,059.38
18,637.88
0.0600
0.0160
0.0025
50,000.00
60,000.00
70,000.00
75,000.00
3,600.00
1,120.00
187.50
4,907.50
0.5500
2.0000
85,000.00
3,000.00
46,750.00
6,000.00
52,750.00
500.00
6,450.00
441.00
187.50
7,578.50
55,485.00
57,657.50
500.00
6,450.00
441.00
187.50
7,578.50
696.88
1,912.50
19,500.00
22,109.38
29,687.88
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Cat
3 Kepala Tukang Cat
4 Mandor
B BAHAN
1 Waterproofing
: 1 m2 Pekerjaan waterproofing
L17
Org/hr
L10
Org/hr
L05
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
M418
kg
0.0200
0.0630
0.0063
0.0025
50,000.00
60,000.00
70,000.00
75,000.00
1,000.00
3,780.00
441.00
187.50
5,408.50
0.3600
143,925.00
51,813.00
51,813.00
C PERALATAN
JUMLAH HARGA PERALATAN
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
Org/hr
L07
Org/hr
L02
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
B BAHAN
1 Kloset duduk/monoblock sekualitas TOTO Type Avant M520
unit
2 Stop Kran sekualitas TOTO
M583
bh
3 Perlengkapan
JUMLAH HARGA BAHAN
C PERALATAN
3.3000
1.1000
0.0010
0.1600
50,000.00
60,000.00
70,000.00
75,000.00
165,000.00
66,000.00
70.00
12,000.00
243,070.00
1.0000
1.0000
0.1000
1,600,000.00
150,000.00
160,000.00
1,600,000.00
150,000.00
16,000.00
1,766,000.00
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
B BAHAN
1 Urinoir sekualitas TOTO
2 Stop Kran sekualitas TOTO
3 Perlengkapan
L17
Org/hr
L07
Org/hr
L02
Org/hr
L01
Org/hr
JUMLAH HARGA TENAGA
M245
M583
bh
bh
57,221.50
2,009,070.00
3.3000
1.1000
0.0010
0.1600
50,000.00
60,000.00
70,000.00
75,000.00
165,000.00
66,000.00
70.00
12,000.00
243,070.00
1.0000
1.0000
0.0600
1,800,000.00
150,000.00
108,000.00
1,800,000.00
150,000.00
6,480.00
1,956,480.00
2,199,550.00
500.00
6,000.00
700.00
375.00
7,575.00
145,000.00
334.94
145,334.94
152,909.94
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
B BAHAN
1 Afor Stainless
bh
0.0100
0.1000
0.0100
0.0050
50,000.00
60,000.00
70,000.00
75,000.00
500.00
6,000.00
700.00
375.00
7,575.00
1.0000
50,558.75
50,558.75
50,558.75
C PERALATAN
58,133.75
Unit
M583
bh
M037
kg
M002
m3
JUMLAH HARGA BAHAN
1.2000
1.4500
0.1500
0.1000
50,000.00
60,000.00
70,000.00
75,000.00
60,000.00
87,000.00
10,500.00
7,500.00
165,000.00
1.0000
0.0600
1.0000
6.0000
0.0100
747,500.00
44,850.00
150,000.00
1,451.00
84,094.00
747,500.00
2,691.00
150,000.00
8,706.00
840.94
909,737.94
C PERALATAN
JUMLAH HARGA PERALATAN
1,074,737.94
500.00
6,000.00
700.00
375.00
7,575.00
1.0000
75,000.00
75,000.00
75,000.00
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 bh Pasang kran TOTO diameter 1/2"
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
0.0100
50,000.00
2 Tukang Batu
L07
Org/hr
0.1000
60,000.00
3 Kepala Tukang Batu
L02
Org/hr
0.0100
70,000.00
4 Mandor
L01
Org/hr
0.0050
75,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Kran Air sekualitas TOTO
M521
bh
1.0000
150,000.00
2 Seal Tape / TBA
M481
bh
0.0250
13,397.50
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
82,575.00
500.00
6,000.00
700.00
375.00
7,575.00
150,000.00
334.94
150,334.94
157,909.94
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
B BAHAN
1 Kaca Cermin tebal 5 mm
0.0150
0.1500
0.0150
0.0008
50,000.00
60,000.00
70,000.00
75,000.00
750.00
9,000.00
1,050.00
56.25
10,856.25
M278
m2
JUMLAH HARGA BAHAN
1.1000
142,168.75
156,385.63
156,385.63
C PERALATAN
JUMLAH HARGA PERALATAN
167,241.88
17,500.00
21,000.00
3,675.00
195.00
42,370.00
1.1000
0.1500
95,000.00
104,500.00
104,500.00
15,675.00
120,175.00
C PERALATAN
1.1000
0.2500
32,500.00
39,000.00
4,550.00
2,400.00
78,450.00
95,000.00
104,500.00
162,545.00
104,500.00
26,125.00
130,625.00
209,075.00
50,000.00
60,000.00
70,000.00
75,000.00
750.00
9,000.00
1,050.00
56.25
10,856.25
98,000.00
107,800.00
107,800.00
118,656.25
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
B BAHAN
1 Engsel Pintu sekualitas SOLID ( 1 psng 2 bh )
M257
psng
JUMLAH HARGA BAHAN
C PERALATAN
0.0150
0.1500
0.0150
0.0008
50,000.00
60,000.00
70,000.00
75,000.00
750.00
9,000.00
1,050.00
56.25
10,856.25
1.0000
75,000.00
75,000.00
75,000.00
85,856.25
50,000.00
60,000.00
70,000.00
75,000.00
750.00
9,000.00
1,050.00
56.25
10,856.25
42,000.00
42,000.00
42,000.00
52,856.25
50,000.00
60,000.00
70,000.00
75,000.00
M265
bh
1,000.00
12,000.00
1,400.00
75.00
14,475.00
1.0000
25,000.00
25,000.00
25,000.00
C PERALATAN
39,475.00
50,000.00
60,000.00
70,000.00
75,000.00
500.00
6,000.00
700.00
37.50
7,237.50
21,500.00
21,500.00
21,500.00
28,737.50
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0005
50,000.00
60,000.00
70,000.00
75,000.00
M259
psng
500.00
6,000.00
700.00
37.50
7,237.50
1.0000
25,000.00
25,000.00
25,000.00
C PERALATAN
JUMLAH HARGA PERALATAN
32,237.50
50,000.00
60,000.00
70,000.00
75,000.00
500.00
6,000.00
700.00
37.50
7,237.50
50,000.00
50,000.00
50,000.00
M037
kg
M002
m3
M680
m2
JUMLAH HARGA BAHAN
50,000.00
150,000.00
17,500.00
3,750.00
221,250.00
682,000.00
5,400.00
682,000.00
903,250.00
0.3250
0.1333
0.0150
0.0200
50,000.00
60,000.00
70,000.00
75,000.00
57,237.50
16,250.00
7,998.00
1,050.00
1,500.00
26,798.00
25.6050
0.1500
1.0500
1,451.00
84,094.00
50,600.00
37,152.86
12,614.10
53,130.00
102,896.96
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
129,694.96
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
Org/hr
Org/hr
Org/hr
Org/hr
6.6670
0.3330
50,000.00
60,000.00
70,000.00
75,000.00
333,350.00
24,975.00
358,325.00
B BAHAN
1
2
3
JUMLAH HARGA BAHAN
C PERALATAN
358,325.00
50,000.00
60,000.00
70,000.00
75,000.00
333,350.00
2,475.00
335,825.00
B BAHAN
1
2
3
JUMLAH HARGA BAHAN
C PERALATAN
335,825.00
0.2000
0.0100
50,000.00
60,000.00
70,000.00
75,000.00
10,000.00
750.00
10,750.00
B BAHAN
1
2
3
JUMLAH HARGA BAHAN
C PERALATAN
10,750.00
1.1000
0.0500
50,000.00
60,000.00
70,000.00
75,000.00
55,000.00
3,750.00
58,750.00
B BAHAN
1
2
3
JUMLAH HARGA BAHAN
C PERALATAN
58,750.00
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
: 1 m2 Bongkaran Plafon
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.0600
0.0060
0.0100
50,000.00
60,000.00
70,000.00
75,000.00
10,000.00
3,600.00
420.00
750.00
14,770.00
B BAHAN
1
2
3
JUMLAH HARGA BAHAN
C PERALATAN
M825
M473
kg
M490
hr
JUMLAH HARGA BAHAN
14,770.00
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
11,400.00
20,125.00
50,812.00
12,540.00
442.75
1,117.86
14,100.61
C PERALATAN
JUMLAH HARGA PERALATAN
M826
M473
kg
M490
hr
JUMLAH HARGA BAHAN
16,900.61
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
11,400.00
20,125.00
50,812.00
12,540.00
442.75
1,117.86
14,100.61
C PERALATAN
JUMLAH HARGA PERALATAN
M824
M473
kg
M490
hr
JUMLAH HARGA BAHAN
16,900.61
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
11,400.00
20,125.00
50,812.00
12,540.00
442.75
1,117.86
14,100.61
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
16,900.61
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Besi/Baja
3 Kepala Tukang Besi
4 Mandor
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0300
50,000.00
60,000.00
70,000.00
75,000.00
M827
M473
kg
M490
hr
JUMLAH HARGA BAHAN
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
11,400.00
20,125.00
50,812.00
12,540.00
442.75
1,117.86
14,100.61
C PERALATAN
JUMLAH HARGA PERALATAN
16,900.61
50,000.00
60,000.00
70,000.00
75,000.00
M831
M473
kg
M490
hr
JUMLAH HARGA BAHAN
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
9,775.00
20,125.00
50,812.00
10,752.50
442.75
1,117.86
12,313.11
C PERALATAN
JUMLAH HARGA PERALATAN
15,113.11
50,000.00
60,000.00
70,000.00
75,000.00
M832
M473
kg
M490
hr
JUMLAH HARGA BAHAN
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
11,000.00
20,125.00
50,812.00
12,100.00
442.75
1,117.86
13,660.61
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
1 kg Plendes t = 20 mm
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
2 Tukang Besi/Baja
L09
Org/hr
3 Kepala Tukang Besi
L04
Org/hr
4 Mandor
L01
Org/hr
16,460.61
0.0200
0.0300
50,000.00
60,000.00
70,000.00
75,000.00
M833
M473
kg
M490
hr
JUMLAH HARGA BAHAN
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
11,000.00
20,125.00
50,812.00
12,100.00
442.75
1,117.86
13,660.61
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
16,460.61
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Besi/Baja
3 Kepala Tukang Besi
4 Mandor
1 kg Ikatan Angin
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0300
50,000.00
60,000.00
70,000.00
75,000.00
M548
kg
M473
kg
M490
hr
JUMLAH HARGA BAHAN
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
10,350.00
20,125.00
50,812.00
11,385.00
442.75
1,117.86
12,945.61
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
1 kg Trekstang
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
2 Tukang Besi/Baja
L09
Org/hr
3 Kepala Tukang Besi
L04
Org/hr
4 Mandor
L01
Org/hr
15,745.61
0.0200
0.0300
50,000.00
60,000.00
70,000.00
75,000.00
M541
kg
M473
kg
M490
hr
JUMLAH HARGA BAHAN
1,000.00
1,800.00
2,800.00
1.1000
0.0220
0.0220
10,350.00
20,125.00
50,812.00
11,385.00
442.75
1,117.86
12,945.61
C PERALATAN
JUMLAH HARGA PERALATAN
15,745.61
50,000.00
60,000.00
70,000.00
75,000.00
M117
M473
M490
kg
kg
hr
ls
1,000.00
1,800.00
2,800.00
1.0000
0.0220
0.0220
0.5000
12,937.50
20,125.00
50,812.00
14,498.11
12,937.50
442.75
1,117.86
7,249.06
21,747.17
C PERALATAN
JUMLAH HARGA PERALATAN
24,547.17
50,000.00
60,000.00
70,000.00
75,000.00
M834
M835
M145
bh
ls
2,000.00
12,000.00
1,400.00
300.00
15,700.00
0.5000
0.7500
6.0000
0.5000
71,700.00
57,240.00
19,500.00
195,780.00
35,850.00
42,930.00
117,000.00
97,890.00
293,670.00
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
309,370.00
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1000
0.0100
0.0100
50,000.00
60,000.00
70,000.00
75,000.00
M154
bh
M146
kg
JUMLAH HARGA BAHAN
10,000.00
6,000.00
700.00
750.00
17,450.00
14.0000
0.0300
2,185.00
20,500.00
30,590.00
615.00
31,205.00
C PERALATAN
JUMLAH HARGA PERALATAN
M161
M140
kg
M037
kg
M002
ls
M039
ls
JUMLAH HARGA BAHAN
48,655.00
20,000.00
12,000.00
1,400.00
150.00
33,550.00
3.5000
0.0500
14.3700
0.0400
1.0000
8,625.00
18,000.00
1,451.00
31,087.50
51,938.37
30,187.50
900.00
20,850.87
1,243.50
51,938.37
105,120.24
C PERALATAN
JUMLAH HARGA PERALATAN
Bekisting
Papan (2x20) cm
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
M063
M140
M135
m3
kg
kg
138,670.24
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
265,000.00
16,500.00
78,000.00
63,000.00
18,550.00
19,875.00
460,925.00
1,451.00
84,094.00
11,000.00
10,350.00
197,800.00
557,184.00
41,542.44
1,949,062.50
404,271.00
152,226.88
3,104,286.82
0.0040
1,018,828.00
0.0400
18,000.00
0.4500
17,250.00
Bekisting 2 kali pakai
4,075.31
720.00
7,762.50
6,278.91
3,110,565.72
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) LANTAI 1
3,571,490.72
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Tukang Besi/Baja
4 Kepala Tukang Batu
5 Mandor
B BAHAN
1 Besi Ulir 19
2 Kawat Beton/Bendrat RRT
3 Portland Cement (PC)
4 Pasir Cor
5 Batu pecah mesin 2/3
3.9000
0.3500
1.0500
0.2450
0.1650
50,000.00
60,000.00
60,000.00
70,000.00
75,000.00
195,000.00
21,000.00
63,000.00
17,150.00
12,375.00
308,525.00
145.0658
2.2500
384.0000
0.5400
0.8100
11,000.00
17,250.00
1,451.00
84,094.00
197,800.00
1,595,723.68
38,812.50
557,184.00
45,410.76
160,218.00
2,397,348.94
C PERALATAN
JUMLAH HARGA PERALATAN
2,705,873.94
7,500.00
187.50
7,687.50
1,250.00
1,250.00
C PERALATAN
JUMLAH HARGA PERALATAN
Bekisting
Papan (2x20) cm
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
M063
M140
M135
m3
kg
kg
0.1080
1,018,828.00
2.0000
18,000.00
3.0000
17,250.00
Bekisting
8,937.50
242,500.00
21,000.00
93,600.00
84,000.00
23,170.00
12,750.00
477,020.00
468,673.00
43,728.88
1,298,800.80
658,617.70
154,284.00
2,624,104.38
110,033.42
36,000.00
51,750.00
197,783.42
2,821,887.80
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
3,298,907.80
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Tukang Kayu
4 Tukang Besi/Baja
5 Kepala Tukang Batu
6 Mandor
B BAHAN
a Beton
1 Portland Cement (PC)
2 Pasir Cor
3 Besi Polos 10
4 Besi polos 8
5 Batu pecah mesin 2/3
M037
M004
M546
M554
M019
kg
m3
kg
kg
m3
b
1
2
3
M063
M140
M135
m3
kg
kg
Bekisting
Papan (2x20) cm
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
4.8500
0.3500
1.5600
1.4000
0.3310
0.1700
50,000.00
60,000.00
60,000.00
60,000.00
70,000.00
75,000.00
242,500.00
21,000.00
93,600.00
84,000.00
23,170.00
12,750.00
477,020.00
323.0000
0.5200
139.0350
29.8287
0.7800
1,451.00
84,094.00
10,350.00
10,350.00
197,800.00
468,673.00
43,728.88
1,439,012.25
308,727.05
154,284.00
2,414,425.18
0.1080
1,018,828.00
2.0000
18,000.00
3.0000
17,250.00
Bekisting
110,033.42
36,000.00
51,750.00
197,783.42
2,612,208.60
Bekisting
Papan (2x20) cm
Paku Kayu Segala Ukuran
Kawat Beton/Bendrat RRT
M063
M140
M135
m3
kg
kg
0.1080
1,018,828.00
2.0000
18,000.00
3.0000
17,250.00
Bekisting
3,089,228.60
242,500.00
21,000.00
93,600.00
84,000.00
23,170.00
12,750.00
477,020.00
468,673.00
43,728.88
1,683,082.50
462,344.85
154,284.00
2,812,113.23
110,033.42
36,000.00
51,750.00
197,783.42
3,009,896.65
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 m2 Pasang Kawat kassa nyamuk
A. TENAGA
1 Pekerja Biasa
L17
Org/hr
0.1000
50,000.00
2 Tukang Kayu
L08
Org/hr
0.1000
60,000.00
3 Kepala Tukang Kayu
L03
Org/hr
0.0100
70,000.00
4 Mandor
L01
Org/hr
0.0005
75,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Kawat loket
M149
m2
1.1000
60,000.00
2 Paku Kayu Segala Ukuran
M140
kg
0.0200
18,000.00
3 Papan (2x20) cm
M081
m3
0.0018
8,525,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
3,486,916.65
5,000.00
6,000.00
700.00
37.50
11,737.50
66,000.00
360.00
15,345.00
66,000.00
77,737.50
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
Org/hr
Org/hr
Org/hr
Org/hr
1.4200
0.4730
0.0470
0.0710
50,000.00
60,000.00
70,000.00
75,000.00
M022
M037
M002
M014
M554
M004
bh
kg
m3
m3
kg
m3
71,000.00
28,380.00
3,290.00
5,325.00
107,995.00
112.5000
77.0000
0.1300
0.0200
2.6000
0.0900
489.00
1,451.00
84,094.00
184,825.00
10,350.00
84,094.00
55,012.50
111,727.00
10,932.22
3,696.50
26,910.00
7,568.46
215,846.68
C PERALATAN
JUMLAH HARGA PERALATAN
323,841.68
Org/hr
Org/hr
Org/hr
Org/hr
0.3800
0.1900
0.0190
0.0190
50,000.00
60,000.00
70,000.00
75,000.00
M053
M022
M037
M002
M001
bh
bh
kg
m3
m3
19,000.00
11,400.00
1,330.00
1,425.00
33,155.00
1.1000
123.7500
5.1500
0.0305
0.0345
74,750.00
489.00
1,451.00
84,094.00
54,984.00
82,225.00
60,513.75
7,472.65
2,564.87
1,896.95
154,673.22
C PERALATAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.2500
0.0250
0.0250
187,828.22
50,000.00
60,000.00
70,000.00
75,000.00
M030
M002
bh
m3
25,000.00
15,000.00
1,750.00
1,875.00
43,625.00
45.0000
0.0350
1,777.78
84,094.00
80,000.00
2,943.29
82,943.29
C PERALATAN
126,568.29
JENIS PEKERJAAN
: 1 m1 Pasang kanstin
A. TENAGA
1 Pekerja Biasa
2 Tukang Batu
3 Kepala Tukang Batu
4 Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1667
0.0833
0.0083
0.0083
50,000.00
60,000.00
70,000.00
75,000.00
M033
M002
bh
m3
8,333.33
5,000.00
583.33
625.00
14,541.67
2.5000
0.0350
4,500.00
84,094.00
11,250.00
2,943.29
14,193.29
C PERALATAN
28,734.96
B BAHAN
1 List papan 9 mm
2 Lem Kayu
JUMLAH HARGA BAHAN
C PERALATAN
M836
M422
m'
Ltr
0.0500
0.0500
0.0050
0.0030
50,000.00
60,000.00
70,000.00
75,000.00
2,500.00
3,000.00
350.00
225.00
6,075.00
1.1000
0.0500
25,000.00
20,437.50
27,500.00
1,021.88
28,521.88
JENIS PEKERJAAN
A. TENAGA
1 Pekerja Biasa
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
34,596.88
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
2.0000
1.0000
0.3000
50,000.00
60,000.00
70,000.00
75,000.00
M080
M140
M422
m3
kg
Ltr
200,000.00
120,000.00
70,000.00
22,500.00
412,500.00
1.2000
1.2500
1.0000
10,000,000.00
18,000.00
20,437.50
12,000,000.00
22,500.00
20,437.50
12,042,937.50
C PERALATAN
12,455,437.50
Pasir Urug
Pasir Pasang
Pasir Cor
Sirtu
M011
M014
M019
M022
M030
M033
IV.
1
2
3
M037
M039
M051
M052
M053
M061
M062
M063
4
4
5
M080
M081
M083
M089
VI
BUIS BETON
Buis Beton U Dia 0.20 m
Buis Beton U Dia 0.30 m
Buis Beton U Dia 0.40 m
Kayu BEKISTING
Usuk : 5/7
Balok
Papan (2x20) cm
Kayu Kamper
Balok
Papan (2x20) cm
Papan (3x30) cm
Kayu Lain-lain
Dolken Kayu Dia 8 cm
Angker Bar 22 mm
Kusen Alumunium Coklat sekualitas INDAL 4"
Kawat Beton/Bendrat RRT
Paku Kayu Segala Ukuran
Sekrup Segala Ukuran
Baut Segala Ukuran
Kawat loket
Besi polos 16
Besi polos 12
Besi polos 10
Besi polos 8
1
2
3
M154
M155
M161
VIII
1
M176
ATAP SENG/ASBES
seng gelombang BJLS 30 80X300
1
2
3
M211
M213
M214
List Gypsum
Gypsum Board t = 9 mm sekualitas Jayaboard
Kalsiboard 9mm
M216
M217
M219
Multiplek 6 mm
Multiplek 9 mm
Multiplek 12 mm
M235
M245
M247
M249
M250
M257
M258
M259
M262
M263
M265
VII
54,984.00
84,094.00
84,094.00
98,000.00
1
1
1
1
1
1
m3
m3
m3
bh
bh
bh
128,800.00
184,825.00
197,800.00
489.00
1,777.78
4,500.00
1 kg
1 kg
1,451.00
2,531.25
1 bh
1 bh
1 bh
15,700.00
54,756.00
74,750.00
1 m3
1 m3
1 m3
1,018,828.00
1,018,828.00
1,018,828.00
1 m3
1 m3
1 m3
10,000,000.00
8,525,000.00
8,525,000.00
1 btg
20,000.00
1
1
1
1
1
1
1
1
1
1
1
12,937.50
95,000.00
17,250.00
18,000.00
19,500.00
20,500.00
60,000.00
10,350.00
10,350.00
10,350.00
10,350.00
kg
m1
kg
kg
KG
kg
m2
kg
kg
kg
kg
ATAP GENTENG
IX.
1 bh
1 bh
1 bh
2,185.00
15,525.00
8,625.00
1 lbr
1 m'
1 lbr
1 lbr
78,200.00
15,000.00
85,000.00
90,000.00
KAYU OLAHAN
X.
1 lbr
1 lbr
1 lbr
95.00 90000/lbr
165,000.00 105000/lbr
195,000.00 165000/lbr
XI
1
2
3
4
5
6
m3
m3
m3
m3
1
2
3
4
5
1
1
1
1
KAYU
1
2
3
1
2
3
KET.
SEMEN
1
2
3
4
5
6
7
8
9
10
11
HARGA
III.
1
2
SATUAN
II.
1
2
3
4
5
6
BAHAN BANGUNAN
KODE
1
1
1
1
1
bh
bh
Unit
bh
bh
1
1
1
1
1
1
psng
psng
psng
bh
bh
bh
145,000.00
1,800,000.00
747,500.00
75,000.00
50,558.75
ALAT-ALAT PENGGANTUNG
75,000.00
50,000.00
25,000.00
42,000.00
21,500.00
25,000.00
NO.
VII
1
2
BAHAN BANGUNAN
KODE
SATUAN
HARGA
KET.
KACA
M271
M278
M401
M403
M412
M415
M418
M420
M422
M429
Kertas Gosok
Plamir Tembok
Cat Dasar Tembok
Cat Tembok watersheild
Waterproofing
Politur Jadi
Lem Kayu
Soda Api
LAIN - LAIN
Elektroda
Seal Tape / TBA
Sewa Mesin las
Metal furing channel RG3, C Channel RG1,Channel Clamp K26,U clamp K4-TB.C
Keramik 60 x 60 polish
Keramik 60 x 60 anpilish
Kloset duduk/monoblock sekualitas TOTO Type Avante CW 823 J
Kran Air sekualitas TOTO
Besi Polos 12
Besi Ulir 19
Besi Polos 10
Besi Polos 19
Cat Tembok Catilax
Keramik 40 x 40 sekualitas Roman
Besi polos 8
Keramik 20x40
Keramik 25 x 25
Batu andesit hitam susun sirih kasar 20 x 40 cm
Stepnosing sekualitas roman 10 x 33
Stop Kran sekualitas TOTO
Kawat Ayam
Besi siku 80.80.8
Besi siku 70.70.7
Besi siku 60.60.6
Baja canal C 200.75.20.3,2
Metalstud 34/75/5
XIII
1 m2
1 m2
98,000.00
142,168.75
1
1
1
1
1
1
1
1
Lbr
kg
kg
kg
kg
ltr
Ltr
kg
3,000.00
6,968.80
19,125.00
75,000.00
143,925.00
85,000.00
20,437.50
25,000.00
kg
bh
hr
m2
m2
m2
unit
bh
kg
kg
kg
kg
kg
m2
kg
m2
m2
m2
bh
bh
m2
kg
kg
kg
kg
ljr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
3
4
5
6
7
8
XVI
1
2
3
4
5
6
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
M473
M481
M490
M517
M518.a
M518.b
M520
M521
M541
M544
M546
M548
M550
M553
M554
M561
M562
M566
M574
M583
M680
M824
M825
M826
M827
M829
M830
M831
28
29
30
M832
M833
M834
1
1
1
btg
60,000.00
9,775.00
11,000.00
11,000.00
71,700.00
31
M835
btg
57,240.00
32
M836
List papan 9 mm
m'
25,000.00
m2
kg
kg
kg
20,125.00
13,397.50
50,812.00
45,000.00
230,000.00
235,000.00
1,600,000.00
150,000.00
10,350.00
11,000.00
10,350.00
10,350.00
32,500.00
135,000.00
10,350.00
105,000.00
95,000.00
120,000.00 harga TK. Aneka Batu Hia
6,500.00
150,000.00
50,600.00
11,400.00
11,400.00
11,400.00
11,400.00
40,000.00
DAFTAR UPAH
TAHUN ANGGARAN 2015
KODE
URAIAN
SATUAN
UPAH (Rp.)
L01
Mandor
Org/hr
75,000.00
L02
Org/hr
70,000.00
L03
Org/hr
70,000.00
L04
Org/hr
70,000.00
L05
Org/hr
70,000.00
L06
Org/hr
70,000.00
L07
Tukang Batu
Org/hr
60,000.00
L08
Tukang Kayu
Org/hr
60,000.00
L09
Tukang Besi/Baja
Org/hr
60,000.00
L10
Tukang Cat
Org/hr
60,000.00
L11
Tukang Listrik
Org/hr
60,000.00
L12
Tukang Pipa
Org/hr
60,000.00
L13
Tukang Plitur
Org/hr
60,000.00
L14
Tukang Taman
Org/hr
60,000.00
L15
Tukang Aspal
Org/hr
60,000.00
L16
Pembantu Tukang
Org/hr
50,000.00
L17
Pekerja Biasa
Org/hr
50,000.00
L18
Penjaga Malam
Org/hr
25,000.00
L19
Sopir
Org/hr
55,000.00
L20
Operator
Org/hr
55,000.00
L21
Mekanik
Org/hr
55,000.00
L22
Pembantu Sopir
Org/hr
50,000.00
L23
Pembantu Operator
Org/hr
50,000.00
L24
Pembantu Mekanik
Org/hr
50,000.00
L25
Juru Ukur
Org/hr
70,000.00
L26
Ls
400,000.00
KETERANGAN