Está en la página 1de 5

METRADO DE EXPLANACIONES (PLATAFORMA)

PROYECTO

HUANCAVELICA

TRAMO

SANTA ROZA

DEPARTAMENTO

:HUANCAVELICA

PROVINCIA
DISTRITO

HUANCAVELICA
HUANCAVELICA

LUGAR

SANTA ROZA

FECHA

Dec-15

AREA(M2)

PROGRESIVA

CORTE

RELLENO

0+000.00

0.00

452.30

0+010.00

29.32

72.52

0+020.00
0+030.00
0+040.00
0+060.00
0+070.00

56.88
101.31
187.05
383.96
39.11
TOTAL

CLASIFICACION CORTE (M3)

VOLUMEN(M3)

44.02
28.43
28.62
0.00
80.83

MATERIAL SUELTO

ROCA SUELTA

ROCA FIJA

CORTE

RELLENO

VOLUMEN

VOLUMEN

VOLUMEN

293.18

5248.21

80.00

234.54

20.00

58.64

0.00

0.00

0.00

0.00

861.97

1165.36

0.00

0.00

1581.91

724.46

0.00

0.00

2883.57

570.53

0.00

0.00

5710.03

286.23

0.00

0.00

4230.68

808.26

0.00

0.00

782.20

1616.52

16,343.54

10,419.57

0.00
90.00

775.77

0.00
10.00

0.00
96.00

1518.63
2566.38

4.00

5139.03

11.00

3596.08

10.00

625.76
14,456.19

571.00

15.00

634.60
156.44
1,887.35

0.00
0.00

0.00

0.00
0.00

0.00

0.00
20.00

0.00
0.00

0.00

0.00

0.00
80.00

317.19

0.00
0.00

0.00

0.00

0.00
85.00

63.28
0.00

0.00
90.00

0.00
0.00

0.00

0.00
89.00

86.20

0.00
0.00

0.00

0.00
0.00

RESUMEN DE METRADO DE EXPLANACIONES


PROYECTO

SANTA ROZA

TRAMO

:HUANCAVELICA

DEPARTAMENTO
PROVINCIA
DISTRITO

:HUANCAVELICA
:HUANCAVELICA
:HUANCAVELICA

LUGAR

SANTA ROZA

FECHA

Dec-15

0+000 - 0+160 (PLATAFORMA + CUNETA)

VOLUMEN (M3)
CORTE
RELLENO
16,343.54
10,419.57

TOTAL PLATAFORMA

16,343.54

PROGRESIVA

10,419.57

CLASIFICACION CORTE (M3)


MATERIAL SUELTO
14,456.19

ROCA SUELTA
1,887.35

ROCA FIJA
0.00

MATERIAL EXCEDENTE
(M3)
496.97

14,456.19

1,887.35

0.00

496.97

METRADO GENERAL
PROYECTO

SANTA ROZA

TRAMO

:HUANCAVELICA

DEPARTAMENTO

:HUANCAVELICA

PROVINCIA

:HUANCAVELICA

DISTRITO

:HUANCAVELICA

LUGAR

SANTA ROZA

FECHA

Dec-15

PARTIDA

DESCRIPCIN

01.00.00

OBRAS PRELIMINARES

01.01.00
01.02.00
02.00.00

TRAZO Y REPLANTEO
MOVILIZACIN DE MAQUINARIAS Y EQUIPOS
EXPLANACIONES

02.01.00
02.01.01
02.01.02

CORTE EN MATERIAL SUELTO


CORTE EN MATERIAL SUELTO CON MAQUINARIA ( INC. PEINADO TALUD )
RELLENO COMPACTADO Y NIVELADO CON MATERIAL SELECCIONADO CON MAQUINARIA

02.02.00
02.02.01
02.02.02
02.03.00
02.03.01

CORTE EN ROCA SUELTA


EXCAVACIN, DESQUINCHE Y PEINADO DE TALUD EN ROCA SUELTA
ELIMINACIN DE MATERIAL EXCEDENTE (CARGUIO)
PERFILADO Y COMPACTACIN
PERFILADO Y COMPACTACION DE LA SUB-RASANTE EN ZONAS DE CORTE

UND. N VEC.

KM
GLB

M3
M4

1
1

M3
M3

1
1

M2

LARGO

18,399.470

18,399.47

ANCHO

ALTO

SUB TOTAL

18,399.47
1.00

14,456.19
10,419.57
1,887.35
496.97
18,399.47

Barra
Nm

Dimetro

Peso
Kg/m

Pulg
Cms
3
3/8
0.95
0.559
4
1/2
1.27
0.993
5
5/8
1.59
1.552
6
3/4
1.91
2.235
7
7/8
2.22
3.042
8
1
2.54
3.973
9
1 1/8
2.86
5.028
10
1 1/4
3.18
6.207
11
1 3/8
3.49
7.511
12
1 1/2
3.81
8.938
ICG, Instituto de la Construccin y Gerencia

Area
cm2
0.71
1.27
1.98
2.85
3.88
5.07
6.41
7.92
9.58
11.4

Perimetro
cms
2.99
3.99
4.99
5.98
6.98
7.98
8.98
9.97
10.97
11.97

Diseo en Concreto Armado

50.5314

33.408

60.577
2

28.715
94.801
18.824
19.749
35.842
66.074
23.42
20.351
60.577
368.353

acero
7850 kg/m3
1/4
0.496

3.1416