‘TOPICS: 1) Work Procedure (concrete coating) 10:01508.0009
2)Surace Preparation and Appleatin of Coating
23yTools and Equipment "9600053895,
‘\Demencraton
) cama aL-mousHEGAH ARABIA LTD.
ATTENDEES |
NE ‘DESIGNATION | SIGNATURE. NL ADDRESS
[wie er oR fy ciral
Page 1Si a
ae I gSol!
aainens IKNURAIS™ABUIIFAN "Saudi tam
PRosECT TITLE
KKURAIS AREA FACILITIES EXPANSION AND
‘SATELLITE GAS O1L SEPARATION PROJECT
(GOsP)
‘ewe TOOLBOX MEET
| WORK PROCEDURE (Conereto Coating)
Surface Preparation and Apolicaticn of Paint
Surface preparation methods) shal be based upon the conditions ofthe substrate, service environment
and the requirements ofthe water curing tobe continuous until the compressive strength has to reached
70% but not less than 7 days ater slacement, the feld moisture test shall proceed for surface preparation
prior to coating aplication as per Aramco Standard,
‘Scour the surface to remove any protrusions sharp edges by using an abrasive brick Carborundum, power
{rinding, oF power brushing. Check the overall surface soundness by scratching with the screwdriver or pocket
keife across the surface f the metal ride over the surface without loosening any particles and leaves only a
shiny marks per Aramco Standard
Surface contaminants such as latance and form olls must be removed, Form alls or grease ete. shal be
removed by steam cleaning with a water emulsifying detergent added as per Aramco standard
‘The quite smooth concrete surface such as formed “surfaces, use dry and light sweep blasting to roughen
the surface. The surace of the new concrete shall be roughened tothe texture of medium git sandpaper.
‘After cleaning is completed ensure that surfaces are free of voids which may be exposed or enlarged during
blasting process. Repair the voids necessary.
fall outside the recommended limits from the coating manufacturer's datasheet.
Coating shall not be applied when the substrate temperature Is less than 10°C; or less than 3°C above dew
point
Surface temperature, humidity, anc dew point readings shall be recorded. Coating shall not be applied ithey
Page 5— a all
=
=a senna ox
Recerca Saudi rome
Romer Tin
KURAIS AREA FACILITIES EXPANSION AND
SATELLITE GAS OLL SEPARATION PROJECT
Gost)
QUE TOOLHOX MEETING
{Only Saudi Aramco Approved Procucts shall be allowed for used
‘The coating contractor's personnel shall be qualified in accordance to the standard procedure SAEP-316
‘The coating shal be visually inspected for defects and shall meet the requirements ofthe coating,
manufacturer's datasheets
‘Applicaton procedure shall conform to the recommendation ofthe protective coating manufacturer,
Including materiat handling, mixing environmental controls during application and safety requirement.
‘The equipment shall specifically design to accurately ratio and apply the specified protective coating
‘materials and shall be regularly maintzined and in proper working order.
Ceating shall be applied by brush or roller on dry surface as per Manufactures data sheet,
‘All concrete surfaces in divect contact with earth shall be coated with two coats of coal tar or bitumen
coating that conforms to APCS-3 0° APCS-10. The coating shall be compatible withthe curing compounds.
Damp/moist concrete surface shallbe brought toa surface dry condition by mopping with a dry cloth,
Clean all the tools immediately with a solvent after use, hardened material shall be removed mechanically
The applicator shall repair all coating defects in accordance with the repair procedure approved by Sau
Aramco.
‘TOOLS and EQUIPMENTS,
* Protective clothing, gloves, facemask, overall, and gogales P-P.E})
steel brush
*Paint brush or roller
*Solvents and Paint (with MSDS and SAFETY Clearances)
Page 30S= avanco
——
aaeeeea PLanrLocarion ppgoull Sob!
9 AKHORAIS™ ABU SPAN ‘Saudi Aramco
(i | \ PASO SEPARATION POICT
eugc TooLHOX MEETING
| FPower brush and Pencil Grinder
“Extension cord
Pressure water gun and equipment (necessary)
Blasting Equiment i nocessay)
Poor otGpgouutl gSolyt Ps
‘Saudi Aramco