IVPM-MOYOBAMBA
Presupuesto
Presupu 0601009
esto
Cliente
Lugar
MEJORAMIENTO DEL CAMINO VECINAL LA LIBERTAD DE HUASCAYACU - COMUNIDAD NATIVA SAN RAFAEL, DISTRITO DE
MOYOBAMBA, PROVINCIA DE MOYOBAMBA - SAN MARTIN
Costo al
Item
Descripcin
01
TRABAJOS PRELIMINARES
Und.
Metrado
02/07/2015
Precio S/.
Parcial S/.
226,341.35
01.01
glb
1.00
01.02
TOPOGRAFIA Y GEOREFERENCIACION
km
5.75
1,014.18
5,831.54
01.03
glb
1.00
34,982.56
34,982.56
01.04
CAMPAMENTO
glb
1.00
158,970.84
158,970.84
ACCESOS PROVISIONALES
km
0.91
9,161.87
01.05
02
18,219.06
MOVIMIENTO DE TIERRAS
18,219.06
8,337.30
1,428,933.06
02.01
ha
3.24
2,292.87
7,428.90
02.02
m3
19,571.09
3.89
76,131.54
02.03
m3
8,638.79
6.03
52,091.90
02.04
m2
27,814.54
1.18
32,821.16
02.05
m3
40,143.35
15.58
625,433.39
02.06
m3
8,638.79
11.55
99,778.02
02.07
m2
40,068.30
11.57
463,590.23
02.08
m3
33,961.10
2.11
03
03.01
04
04.01
04.01.01
AFIRMADOS
AFIRMADO GRANULAR CON ESTABILIZADORES DE SUELOS
m3
7,002.46
23.62
DRENAJE
165,398.11
1,115,189.53
ALCANTARILLAS
750,091.03
MOVIMIENTO DE TIERRAS
181,907.84
04.01.01.01
m3
04.01.01.02
04.01.01.03
04.01.01.04
04.01.02
71,657.92
165,398.11
443.30
28.30
12,545.39
m3
828.95
4.31
3,572.77
m2
1,620.32
4.21
6,821.55
m3
3,924.17
40.51
158,968.13
268,217.61
04.01.02.01
m3
96.07
36.44
3,500.79
04.01.02.02
ml
180.95
561.93
101,681.23
04.01.02.03
ml
86.98
813.22
70,733.88
04.01.02.04
ml
79.48
1,161.32
04.01.03
92,301.71
126,073.07
04.01.03.01
kg
11,922.80
5.83
69,509.92
04.01.03.02
m3
5.53
290.84
1,608.35
04.01.03.03
m3
80.99
449.80
36,429.30
04.01.03.04
ENCOFRADO Y DESENCOFRADO
m2
451.46
40.67
18,360.88
04.01.03.05
m2
293.97
0.56
164.62
04.01.04
CABEZALES DE ALCANTARILLAS
121,098.28
04.01.04.01
kg
4,100.28
5.83
23,904.63
04.01.04.02
m3
16.21
290.84
4,714.52
04.01.04.03
m3
127.54
404.80
51,628.19
04.01.04.04
m2
809.74
49.98
40,470.81
m2
678.80
0.56
04.01.04.05
04.01.05
04.01.05.01
m2
04.01.05.02
04.01.05.03
04.02
380.13
52,794.23
695.67
68.53
47,674.27
m2
78.37
32.96
2,583.08
ml
402.68
6.30
2,536.88
365,098.50
04.02.01
04.02.01.01
04.02.01.02
04.02.02
MOVIMIENTO DE TIERRAS
41,472.56
m3
816.06
4.31
m2
9,015.52
4.21
3,517.22
37,955.34
323,625.94
04.02.02.01
m3
816.06
36.44
29,737.23
04.02.02.02
m3
648.96
404.80
262,699.01
04.02.02.03
ENCOFRADO Y DESENCOFRADO
m2
301.14
40.67
12,247.36
ml
3,006.72
6.30
04.02.02.04
05
05.01
18,942.34
1,051,558.88
10,106.26
05.01.01
m2
827.94
2.31
1,912.54
05.01.02
m2
827.94
8.52
7,054.05
m3
189.00
6.03
05.01.03
05.02
SUB ESTRUCTURA
1,139.67
729,706.09
05.02.01
m3
1,172.15
3.01
3,528.17
05.02.02
m3
05.02.03
m3
1,460.80
9.58
13,994.46
170.51
25.83
4,404.27
05.02.04
05.02.05
m3
1,281.94
40.51
51,931.39
m2
426.19
53.98
05.02.06
23,005.74
MAMPOSTERIA
m3
116.15
384.95
44,711.94
05.02.07
kg
15,254.08
5.83
88,931.29
05.02.08
m3
329.81
403.27
133,002.48
05.02.09
m2
184.78
35.80
6,615.12
05.02.10
kg
19,970.41
5.83
116,427.49
05.02.11
m3
455.86
422.97
192,815.10
05.02.12
m2
1,170.57
41.95
49,105.41
05.02.13
m2
1,813.58
0.68
05.03
SUPERESTRUCTURA
1,233.23
201,530.05
05.03.01
kg
13,695.37
5.83
79,844.01
05.03.02
m3
90.52
513.55
46,486.55
05.03.03
m2
416.11
109.75
45,668.07
05.03.04
FALSO PUENTE
m2
210.00
138.87
29,162.70
05.03.05
m2
658.43
0.56
05.04
LOSA DE APROXIMACION
368.72
17,230.36
05.04.01
kg
1,599.78
5.83
9,326.72
05.04.02
m3
17.35
403.27
6,996.73
05.04.03
m2
24.00
35.80
859.20
05.04.04
m2
85.20
0.56
05.05
VARIOS
47.71
92,986.12
05.05.01
ACABADO EN VEREDAS
m2
60.15
32.00
1,924.80
05.05.02
ml
112.00
259.11
29,020.32
05.05.03
ml
112.00
20.74
2,322.88
05.05.04
m2
550.28
7.02
3,862.97
05.05.05
m3
158.89
43.76
6,953.03
05.05.06
und
168.00
25.30
4,250.40
05.05.07
und
11.00
45.56
501.16
05.05.08
und
18.00
41.06
739.08
05.05.09
und
18.00
102.89
1,852.02
05.05.10
und
36.00
23.06
830.16
05.05.11
ml
7.20
1,375.85
9,906.12
ml
37.20
828.58
05.05.12
06
06.01
OBRAS COMPLEMENTARIAS
30,823.18
145,855.39
GAVIONES
126,992.41
06.01.01
m3
451.27
4.31
1,944.97
06.01.02
m2
641.25
4.21
2,699.66
06.01.03
und
57.00
941.99
53,693.43
06.01.04
und
38.00
1,421.41
54,013.58
06.01.05
und
19.00
613.67
11,659.73
m2
424.65
7.02
06.01.06
06.02
2,981.04
18,862.98
06.02.01
km
5.75
2,862.00
16,456.50
06.02.02
und
2.00
949.42
1,898.84
06.02.03
und
4.00
126.91
507.64
m3k
59,847.46
7.09
881,421.25
424,318.49
07
07.01
TRANSPORTE
TRANSPORTE DE MATERIALES GRANULARES ENTRE 120 m Y 1000 m
07.02
m3k
305,271.70
0.85
259,480.95
07.03
m3k
23,176.43
7.51
174,054.99
07.04
m3k
22,660.40
1.04
23,566.82
08
106,330.81
08.01
SEALES PREVENTIVAS
und
44.00
396.20
17,432.80
08.02
SEALES REGLAMENTARIAS
und
7.00
501.88
3,513.16
08.03
SEALES INFORMATIVAS
und
9.00
949.42
8,544.78
08.04
POSTES DE KILOMETRAJE
und
6.00
197.67
1,186.02
08.05
GUARDAVIAS METALICAS
ml
422.00
155.71
65,709.62
08.06
und
211.00
47.13
09
09.01
09.01.01
09.01.01.01
09.01.02
31,268.81
9,944.43
67,480.38
18,000.00
mes
5.00
3,600.00
18,000.00
4,114.81
09.01.02.01
und
4.00
899.83
3,599.32
09.01.02.02
glb
1.00
354.45
354.45
und
3.00
53.68
09.01.02.03
09.01.03
09.01.03.01
09.01.03.02
09.01.04
09.01.04.01
09.01.04.02
09.01.05
09.01.05.01
09.01.05.02
09.02
09.02.01
09.02.02
09.03
09.03.01
09.03.02
09.04
glb
1.00
942.08
942.08
SEALES AMBIENTALES
und
4.00
1,255.42
5,021.68
SEALIZACION PREVENTIVA
und
5.00
53.68
glb
1.00
742.08
1,210.48
268.40
742.08
1,979.76
glb
1.00
942.08
942.08
ha
0.17
6,104.00
1,037.68
pto
3.00
250.00
750.00
pto
3.00
2,500.00
7,500.00
SEALIZACION PREVENTIVA
und
5.00
53.68
glb
1.00
153.22
8,250.00
PLAN DE CONTINGENCIAS
421.62
268.40
153.22
8,628.00
09.04.01
glb
1.00
8,359.60
09.04.02
und
5.00
53.68
09.05
161.04
5,963.76
8,359.60
268.40
18,911.95
09.05.01
SELLADO DE LETRINAS
und
4.00
168.51
674.04
09.05.02
ha
2.23
6,104.00
13,611.92
09.05.03
ha
2.05
2,066.44
4,236.20
09.05.04
ha
0.17
2,292.87
389.79
COSTO DIRECTO
GASTOS GENERALES (17.5223421316918% CD)
UTILIDAD (5.0% CD)
SUB TOTAL
5,188,508.76
909,148.26
259,425.44
6,357,082.46
1,144,274.84
7,501,357.30
353,223.77
7,854,581.07