CRONOGRAMA

VALORIZADO

DE

AVANCE

DE

OBRA

OBRA

: RECONSTRUCCION Y MEJORAMIENTO DE PISTAS Y VEREDAS EN EL JR. JORGE CHAVEZ, P. J. BOLIVAR ALTO Y BAJO, PROVINCIA DEL SANTA - ANCASH

PROPIETARIO

: MUNICIPALIDAD PROVINCIAL DEL SANTA

ITEM

ACTIVIDAD

N
Dias

MES 01

MES 02

MES 03

MES 04

MES 05

MES 06

PAVIMENTACION Y SARDINELES

TOTAL
( S/. )

674,762.14

1.00

OBRAS PROVISIONALES

30

3,558.34

2.00

OBRAS PRELIMINARES

45

5,437.89

3.00

MOVIMIENTO DE TIERRAS

75

4.00

PAVIMENTACION

6.00

3,558.34

7,711.47

76,543.66

43,213.75

90

23,960.60

114,571.57

76,879.25

234,158.34

SARDINELES

90

5,790.72

25,916.78

28,588.72

2,842.08

63,138.30

6.00

SEALIZACION

30

10,103.11

10,103.11

8.00

VARIOS

15

1,506.30

13,979.57

13,149.37

310,572.50

OBRAS PRELIMINARES

60

22,935.72

2.00

MOVIMIENTO DE TIERRAS

90

20,403.62

3.00

VEREDAS

75

4.00

AREA VERDE

60

5.00

VARIOS

45

22,935.72

41,559.73

80,428.69

61,963.35

71,479.05

6,182.14

11,420.29

158,089.87

24,622.61

396.03

31,144.61

OBRAS PRELIMINARES

2.00

3.00

22,902.27
7

368.00

MOVIMIENTO DE TIERRAS

21

10,845.62

PAVIMENTO RIGIDO

21

307.74

COSTO DIRECTO TOTAL


GASTOS GENERALES

7.00 %

UTILIDADES

8.00 %

SUB TOTAL
I.G.V. (19.00%) Materiales y Equipos

36,438.93

31,144.61

PAVIMENTO RIGIDO

1.00

449,569.75

1,506.30

VEREDAS Y AREA VERDE

1.00

133,736.98

18.00 %

SUB TOTAL PRESUPUESTO

368.00

10,845.62

11,380.91

11,688.65

53,841.88

174,824.07

177,774.03

212,825.89

141,471.49

247,499.55

###

3,768.93

12,237.68

12,444.18

14,897.81

9,903.00

17,324.97

70,576.58
80,658.95
1,159,472.45
208,705.04
1,368,177.49

4,307.35

13,985.93

14,221.92

17,026.07

11,317.72

19,799.96

61,918.16

201,047.68

204,440.13

244,749.78

162,692.21

284,624.48

11,145.27

36,188.58

36,799.22

44,054.96

29,284.61

51,232.41

73,063.43

237,236.26

241,239.35

288,804.74

191,976.82

335,856.89
335,856.89

DESEMBOLSO PARCIAL PROGRAMADO

( S/. )

73,063.43

237,236.26

241,239.35

288,804.74

191,976.82

DESEMBOLSO ACUMULADO PROGRAMADO

( S/. )

73,063.43

310,299.69

551,539.04

840,343.78

###

###

AVANCE PARCIAL DE OBRA

(%)

5.34

17.34

17.63

21.11

14.03

24.55

AVANCE ACUMULADO DE OBRA

(%)

5.34

22.68

40.31

61.42

75.45

100.00