Sewerage Hydraulic Design Calculation

Job No.:

MAA/11.38

Member/Location :
Sheet No.:

Rev.:

00

Designed By:

AA

Checked By:

AZMZ

Date:

8/15/2011

Job Title:
ks =
MH
To
MH
(1)
MH No.
MH 1

No of
Units
(2a)

PE
per
unit
(2b)

PE

Flow Computation
Cumulative Average
PE
Flow

Peak
Flow
Factor
(5)

Peak
Flow
(6)
(l/s)

Cumulative Diameter
Peak
Flow
(7)
(8)
(m3/s)
(mm)

0.6

mm

Pipe Computation
Length
Gradient
Full
1:n
Pipe
n=
Velocity
(9)
(10)
(11)
(m)
(m/s)

Full
Pipe
Flow
(12)
(m3/s)

(14)
(m)

Fall

(2)
(PE)

(3)
(PE)

(4)
(l/s)

2000

2000

5.208

4.35

22.682

0.0227

225

43.00

100

1.307

0.052

0.430

2000

5.208

4.35

22.682

0.0227

225

25.00

100

1.307

0.052

0.250

2000

5.208

4.35

22.682

0.0227

225

55.00

100

1.307

0.052

0.550

2000

5.208

4.35

22.682

0.0227

225

55.00

100

1.307

0.052

0.550

2000

5.208

4.35

22.682

0.0227

225

41.50

100

1.307

0.052

0.415

2000

5.208

4.35

22.682

0.0227

225

41.50

100

1.307

0.052

0.415

2000

5.208

4.35

22.682

0.0227

225

41.00

100

1.307

0.052

0.410

2000

5.208

4.35

22.682

0.0227

225

72.00

50

1.854

0.074

1.440

2000

5.208

4.35

22.682

0.0227

225

47.00

200

0.921

0.037

0.235

3900

10.156

4.05

41.097

0.0411

225

58.00

100

1.307

0.052

0.580

3900

10.156

4.05

41.097

0.0411

225

58.00

50

1.854

0.074

1.160

MH 2
MH 3
MH 4
MH 5
MH 6
MH 7
MH 8
MH 9
MH 10
MH 11
STP

MH 12
1000

1000

2.604

4.70

12.240

0.0122

225

90.01

35

2.219

0.088

2.572

1000

2.604

4.70

12.240

0.0122

225

49.02

75

1.512

0.060

0.654

1000

2.604

4.70

12.240

0.0122

225

39.06

75

1.512

0.060

0.521

1000

2.604

4.70

12.240

0.0122

225

39.03

30

2.398

0.095

1.301

1900

4.948

4.38

21.670

0.0217

225

50.04

35

2.219

0.088

1.430

MH 13
MH 14
MH 15
MH 16
MH 11

MH 17
900

900

2.344

4.75

11.144

0.0111

225

35.01

200

0.921

0.037

0.175

900

2.344

4.75

11.144

0.0111

225

50.03

200

0.921

0.037

0.250

900

2.344

4.75

11.144

0.0111

225

88.00

200

0.921

0.037

0.440

MH 18
MH 19
MH 16

Manhole and Level Computation


Ground
Invert
Depth
Invert
Level
Level
of Pipe/ Level of
of MH
MH
pipe
(15)
(16)
(17)
(18)
(m)
(m)
(m)
165.00
163.80
1.20

Drops

165.09

163.37

1.72

165.49

163.12

2.37

164.10

162.57

1.53

167.14

162.02

5.12

164.00

161.61

2.40

163.83

161.19

2.64

161.66

160.46

1.20

160.78

0.32

160.00

158.80

1.20

159.02

0.22

159.80

158.57

1.24

158.93

157.73

1.20

157.99

0.25

158.00

156.57

1.43

166.86

164.86

2.00

163.34

162.14

1.20

162.29

0.15

162.53

161.33

1.20

161.49

0.16

162.03

160.81

1.22

160.46

159.15

1.31

158.93

157.73

1.20

161.22

160.02

1.20

161.23

159.84

1.39

160.96

159.59

1.37

160.46

159.15

1.31

Table 1
Sewerage Hydraulic Design
Calculation(IST)

Job No.:

MAA/11.38

Member/Location :
Sheet No.:

Rev.:

00

Designed By:

MHR

Checked By:

SAL

Date:

29/09/2014

Job Title:
n=
MH
To
MH
(1)
MH No.
ICBP4

No of
Units
(2a)

PE
per
unit
(2b)

PE

Flow Computation
Cumulative Average
PE
Flow

Peak
Flow
Factor
(5)

Peak
Flow
(6)
(l/s)

Cumulative Diameter
Peak
Flow
(7)
(8)
(m3/s)
(mm)

0.01
Pipe Computation
Length
Gradient
Full
1:n
Pipe
n=
Velocity
(9)
(10)
(11)
(m)
(m/s)

Full
Pipe
Flow
(12)
(m3/s)

Fall

(14)
(m)

(2)
(PE)

(3)
(PE)

(4)
(l/s)

11

11

0.029

7.72

0.221

0.0002

225

19

100

1.468

0.058

0.190

11

0.029

7.72

0.221

0.0002

225

12

150

1.199

0.048

0.080

11

0.029

7.72

0.221

0.0002

225

20

150

1.199

0.048

0.133

12

0.031

7.65

0.239

0.0002

225

150

1.199

0.048

0.013

ICPP1
IC 1
IC2
IST

Manhole and Level Computation


Ground
Invert
Depth
Invert
Level
Level
of Pipe/ Level of
of Pipe
MH
Drop MH
(15)
(16)
(17)
(18)
(m)
(m)
(m)
158
1.37
156.63
157.77

1.18

156.59

156.18

1.10

155.08

155.39

0.97

154.42

154.6

0.95

153.64

Remarks

MH
To
MH
(1)
MH No.
MH 1

Type of
Pipe

Pipe Computation
Diameter Length
Gradient
1:n
n=
(8)
(9)
(10)
(mm)
(m)

Fall

(14)
(m)

VCP

225

43.00

100

0.430

VCP

225

25.00

100

0.250

VCP

225

55.00

100

0.550

VCP

225

55.00

100

0.550

VCP

225

41.50

100

0.415

VCP

225

41.50

100

0.415

VCP

225

41.00

100

0.410

VCP

225

72.00

50

1.440

VCP

225

47.00

200

0.235

VCP

225

58.00

100

0.580

VCP

225

58.00

50

1.160

MH 2
MH 3
MH 4
MH 5
MH 6
MH 7
MH 8
MH 9
MH 10
MH 11
STP

MH 12
VCP

225

90.01

35

2.572

VCP

225

49.02

75

0.654

VCP

225

39.06

75

0.521

VCP

225

39.03

30

1.301

VCP

225

50.04

35

1.430

MH 13
MH 14
MH 15
MH 16
MH 11

MH 17
VCP

225

35.01

200

0.175

VCP

225

50.03

200

0.250

VCP

225

88.00

200

0.440

MH 18
MH 19
MH 16

Manhole and Level Computation


Ground
Invert
Depth
Invert
Level
Level
of Pipe/ Level of
of MH
MH
pipe
(15)
(16)
(17)
(18)
(m)
(m)
(m)
165.00
163.80
1.20

Drops

165.09

163.37

1.72

165.49

163.12

2.37

164.10

162.57

1.53

167.14

162.02

5.12

164.00

161.61

2.40

163.83

161.19

2.64

161.66

160.46

1.20

160.78

0.32

160.00

158.80

1.20

159.02

0.22

159.80

158.57

1.24

158.93

157.73

1.20

157.99

0.25

158.00

156.57

1.43

166.86

164.86

2.00

163.34

162.14

1.20

162.29

0.15

162.53

161.33

1.20

161.49

0.16

162.03

160.81

1.22

160.46

159.15

1.31

158.93

157.73

1.20

161.22

160.02

1.20

161.23

159.84

1.39

160.96

159.59

1.37

160.46

159.15

1.31