Está en la página 1de 8

OBRA

PROPIETARIO
UBICACIN
FECHA

: VIVIENDA UNIFAMILIAR
: Sr. MILDER CHAVEZ MONTENEGRO Y Sra
: A.H LA PAZ MZ D Lote. 6 VENTANILLA CALLAO
: Mayo 2015

PART.

ELEMENTO
DESCRIPCION

N
2.30
2.3.2

OBRAS DE CONCRETO ARMADO

Zapatas
Z-1

Z-2

LONGITUD TOTAL x

PESO ( Kg / Ml )
TOTAL ( Kgs )

FORMATO DE METRADO DE CONCRETO ARMADO

CONCRETO
CANT.

ENCOFRADO
TOTAL

METRADO

METRADO
A

( M3 )

A( H )

13

1.20

1.20

1.20

22.46

4.80

1.20

2.35

1.20

1.20

6.77

7.10

1.20

1"

N 16

TOTAL

1/4"

3/8"

1/2"

229.20

5/8"

29.23

3/4"

183.60

0.25

0.56

0.994

227.82

1.552

2.235

3.973

0.016

2.94

HOJA N
PLANO N
HECHO POR
REVISADO POR

NCOFRADO

: 5 DE:
:
Nestor Daniel Flores Sajami
: ING. Msc.VISAZA

FIERRO
TOTAL

( M2 )

( PULG.)

74.88

1/2"
1/2"
N 16

CANT.

LONGITUD TOTAL ( ML )
LONG.

1/4"

3/8"

6.00
6.00
36.00

1.05
1.05
0.30

81.90
81.90
SUBTOTAL:

17.04

1/2"
1/2"
N 16

12.00
6.00
72.00

2.20
1.05
0.30

TOTAL

163.80
52.80
12.60

SUBTOTAL:

91.92

1/2"

C/

TOTAL:

65.40
229.20

230.76

ONGITUD TOTAL ( ML )
5/8"

( ML )
3/4"

1"

N
16

140.40
140.40

43.20
43.20
183.60

También podría gustarte