CRONOGRAMA DE EJECUCION VALORIZADO

PROYECT"CONSTRUCCIN DE LA TROCHA CARROZABLE CHACUA-CHARAC, DISTRITO DE SAN RAFAEL PROVINCIA DE AMBO - HUANUCO"
TRAMO

: CHACUA-CHARAC

UBICACI: HUANUCO - AMBO - SAN RAFAEL


Item
01

Descripcin

01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 4.80 m

01.02

CAMPAMENTO Y ALMACEN PROVISIONAL

02

Parcial (S/.)

Mes 1

Mes 2

Mes 3

OBRAS PROVISIONALES
S/. 804.15

S/. 804.15

S/. 6,221.16

S/. 6,221.16

TRABAJOS PRELIMINARES

02.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

S/. 2,841.16

S/. 2,841.16

02.02

TRANSPORTE DE MATERIALES

S/. 3,403.52

S/. 3,403.52

02.03

LIMPIEZA Y DESFORESTACION R= 1.0 Ha/da

S/. 9,376.48

S/. 9,376.48

02.04

TRAZO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCION DE LA OBRA

S/. 5,175.02

S/. 1,725.01

S/. 1,725.01

S/. 1,725.01

S/. 132,285.08

S/. 44,095.03

S/. 44,095.03

S/. 44,095.03

03

MOVIMIENTO DE TIERRAS

03.01

CORTE DE MATERIAL SUELTO R=460 m3/da

03.02

CONFORMACION DE TERRAPLENES R= 790 m3/da (TP)

S/. 72,844.94

03.03

ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO

S/. 32,828.90

04
04.01
04.01.01

S/. 72,844.94
S/. 32,828.90

OBRAS DE ARTE Y DRENAJE


ALCANTARILLAS
ALCANTARILLAS DE TMC 24" (13 UND)

04.01.01.01

LIMPIEZA DE TERRENO MANUAL

S/. 208.73

S/. 208.73

04.01.01.02

TRAZO Y REPLANTEO EN ALCANTARILLAS

S/. 298.02

S/. 298.02

04.01.01.03

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

S/. 3,724.27

S/. 3,724.27

04.01.01.04

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

S/. 1,729.54

S/. 1,729.54

04.01.01.05

CONCRETO F'C=175 KG/CM2 + 30% P.G. CIMENTACION ALCANTARILLAS (TP)

S/. 3,157.70

S/. 3,157.70

04.01.01.06

CONCRETO F'C=175 KG/CM2 EN ALCANTARILLAS CABEZALES Y ALETAS (TP)

S/. 17,283.90

S/. 17,283.90

04.01.01.07

CONCRETO F'C=140 KG/CM2 + 70% PG EMBOQUILLADO DE PIEDRA -ENTRADA

S/. 3,595.10

S/. 3,595.10

04.01.01.08

ENCOFRADO Y DESENCOFRADO NORMAL DE ESTRUCTURAS

S/. 7,505.84

S/. 7,505.84

S/. 17,968.60

S/. 17,968.60

S/. 23,655.10

S/. 23,655.10

04.01.01.09
04.02
04.02.01
05

ALCANTARILLA TMC 0=24" C=14 R=12 m/da


CUNETAS
CONFORMACION DE CUNETAS EN TERRENO NATURAL (SIERRA)
PLAN DE MANEJO AMBIENTAL
COSTO DIRECTO

S/. 0.00
S/. 18,523.11
S/. 363,430.32

S/. 6,174.37
S/. 74,640.87

S/. 6,174.37
S/. 203,966.14

S/. 6,174.37
S/. 84,823.30

CRONOGRAMA DE EJECUCION VALORIZADO


PROYECT"CONSTRUCCIN DE LA TROCHA CARROZABLE CHACUA-CHARAC, DISTRITO DE SAN RAFAEL PROVINCIA DE AMBO - HUANUCO"
TRAMO

: CHACUA-CHARAC

UBICACI: HUANUCO - AMBO - SAN RAFAEL


Item

Descripcin

13% GASTOS GENERALES 12.84 %


UTILIDAD (10%)
PRESUPUESTO TOTAL
AVANCE MENSUAL (%)
AVANCE ACUMULADO (%)

Parcial (S/.)
S/. 46,664.45
S/. 36,343.03
S/. 446,437.80

Mes 1

Mes 2

Mes 3

S/. 9,583.89
S/. 7,464.09
S/. 91,688.85

S/. 26,189.25
S/. 20,396.61
S/. 250,552.01

S/. 10,891.31
S/. 8,482.33
S/. 104,196.94

20.54%
20.54%

56.12%
76.66%

23.34%
100.00%