RESUMEN DE METRADO
KM 01+361.45 - KM 01+495.00
RESUMEN DE METRADO
CDIGO
PARTIDA
UND
PROYECTO
ADICIONAL N01
REPLANTEO
DIFERENCIA
MURO RAMPA
601.C
m3
540.97
508.89
(32.08)
605.A
m3
433.64
309.40
(124.24)
(52.59)
610.D
m3
334.64
282.04
610.G
m3
35.40
23.59
(11.81)
612.A
Encofrado y Desencofrado
m2
1,224.72
1,084.74
(139.98)
615.A
Kg
22,693.00
15,284.34
(7,408.66)
624.B
ml
33.86
23.55
(10.31)
605.B
Material Filtrante
m3
66.92
62.42
(4.50)
655.B
m2
44.62
37.89
(6.73)
700.A
m3k
440.50
407.04
516.04
(331.50)
700.B
m3k
39,598.80
40,285.00
49,274.26
(30,609.54)
700.E
m3k
476.05
447.82
(28.23)
700.F
m3k
9,056.20
8,516.00
(540.20)
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
MOVIMIENTO DE TIERRA
KM 01+361.45 - KM 01+495.00
601.C Excavacin para estructuras en material comn
Progresiva
EJE "A"
1+361.46
1+368.78
1+376.20
1+383.70
1+391.20
1+398.70
1+398.70
1+406.20
1+413.70
1+421.20
1+428.70
1+428.70
1+436.20
1+443.70
1+451.20
1+460.00
EJE "B"
1+430.00
1+437.50
1+445.00
1+452.50
1+460.00
1+467.50
1+475.00
1+482.47
1+489.56
1+495.00
Distancia
Area
(m2)
Volumen
(m3)
7.50
7.50
7.50
8.80
2.63
2.69
2.99
2.79
2.16
1.54
3.24
2.72
2.26
1.86
1.95
2.45
2.55
2.50
2.33
1.95
19.48
21.07
21.68
18.56
13.88
22.35
18.68
15.45
14.29
18.75
18.94
18.11
18.84
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
3.64
4.33
4.33
3.72
3.08
3.32
4.67
5.79
4.20
4.01
29.89
32.48
30.19
25.50
24.00
29.96
39.05
35.44
22.32
7.32
7.42
7.50
7.50
7.50
7.50
7.50
7.50
7.50
Vol Total =
508.89 m3
Distancia
Area
(m2)
Volumen
(m3)
7.50
7.50
7.50
8.80
1.53
1.55
1.83
1.65
1.08
0.57
1.90
1.43
1.01
0.68
0.72
1.18
1.27
1.23
1.09
0.73
11.28
12.54
13.05
10.24
6.19
12.49
9.15
6.34
5.25
9.19
9.38
8.70
8.01
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
2.43
3.05
3.07
2.53
1.95
2.18
3.35
4.36
2.93
2.75
20.55
22.95
21.00
16.80
15.49
20.74
28.79
25.86
15.44
7.32
7.42
7.50
7.50
7.50
7.50
7.50
7.50
7.50
Vol Total =
309.40 m3
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
OBRAS DE DRENAJE
ALTURA
H PROMEDIO
LONGITUD
Total (m)
3.10
3.03
2.98
2.93
2.87
7.32
7.42
7.50
7.50
7.50
1.16
1.18
1.20
1.20
1.20
3.32
3.27
3.21
3.16
7.50
7.50
7.50
7.50
1.20
1.20
1.20
1.20
3.18
2.90
2.59
2.26
7.50
7.50
7.50
8.80
1.00
1.00
1.00
1.22
3.15
2.85
2.54
2.23
2.35
2.59
2.53
2.38
1.96
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
1.00
1.00
1.00
1.00
1.00
1.00
0.99
0.93
0.66
3.14
3.06
3.00
2.95
2.90
2.84
3.34
3.29
3.24
3.18
3.14
3.31
3.05
2.74
2.44
2.07
EJE "B"
01+430.00
01+437.50
01+445.00
01+452.50
01+460.00
01+467.50
01+475.00
01+482.47
01+489.56
01+495.00
3.30
3.00
2.69
2.38
2.08
2.62
2.56
2.49
2.27
1.64
Long Total =
23.55 m
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
DESCRIPCION
ALTURA
H PROMEDIO
ANCHO
LONGITUD
Total (m3)
EJE "A"
01+361.46
01+368.78
01+376.20
01+383.70
01+391.20
01+398.70
01+398.70
01+406.20
01+413.70
01+421.20
01+428.70
01+428.70
01+436.20
01+443.70
01+451.20
01+460.00
1.57
1.53
1.50
1.48
1.45
1.42
1.67
1.65
1.62
1.59
1.57
1.66
1.53
1.37
1.22
1.04
1.55
1.52
1.49
1.46
1.44
1.55
1.66
1.63
1.61
1.58
1.61
1.59
1.45
1.30
1.13
0.30
0.30
0.30
0.30
0.30
7.32
7.42
7.50
7.50
7.50
3.40
3.38
3.35
3.29
3.24
0.30
0.30
0.30
0.30
7.50
7.50
7.50
7.50
3.74
3.67
3.62
3.56
0.25
0.25
0.25
0.25
7.50
7.50
7.50
8.80
2.98
2.72
2.44
2.49
EJE "B"
01+430.00
01+437.50
01+445.00
01+452.50
01+460.00
01+467.50
01+475.00
01+482.47
01+489.56
01+495.00
1.65
1.50
1.35
1.19
1.04
1.31
1.28
1.25
1.14
0.82
1.58
1.42
1.27
1.12
1.18
1.30
1.26
1.19
0.98
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
2.96
2.66
2.38
2.10
2.21
2.44
2.35
2.11
1.33
62.42
Vol Total =
62.42 m3
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
Progresiva
EJE "A"
01+361.46
01+368.78
01+376.20
01+383.70
01+391.20
01+398.70
01+398.70
01+406.20
01+413.70
01+421.20
01+428.70
01+428.70
01+436.20
01+443.70
01+451.20
01+460.00
EJE "B"
01+430.00
01+437.50
01+445.00
01+452.50
01+460.00
01+467.50
01+475.00
01+482.47
01+489.56
01+495.00
AREA
ZAPATA
AREA
PANTALLA
Total (m2)
TIPO 03
TIPO 03
TIPO 03
TIPO 03
TIPO 03
1.05
1.05
1.05
1.05
1.05
0.93
0.91
0.89
0.88
0.86
1.98
1.96
1.94
1.93
1.91
TIPO 03
TIPO 03
TIPO 03
TIPO 03
1.05
1.05
1.05
1.05
1.00
0.98
0.96
0.95
2.05
2.03
2.01
2.00
TIPO 02
TIPO 02
TIPO 02
TIPO 02
0.90
0.90
0.90
0.90
0.80
0.73
0.65
0.57
1.70
1.63
1.55
1.47
TIPO 02
TIPO 02
TIPO 02
TIPO 02
TIPO 02
TIPO 02
TIPO 02
TIPO 02
TIPO 02
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.79
0.71
0.64
0.56
0.59
0.65
0.63
0.60
0.49
1.69
1.61
1.54
1.46
1.49
1.55
1.53
1.50
1.39
TIPO
Lon Total =
37.89 m2
ENTIDAD
OBRA
Hvar
Long
01+428.70
01+436.20
01+443.70
01+451.20
01+460.00
3.18
2.90
2.59
2.26
7.50
7.50
7.50
8.80
3.15
2.85
2.54
2.23
2.35
2.59
2.53
2.38
1.96
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
96.30
VAR
VAR
EJE "B"
01+430.00
01+437.50
01+445.00
01+452.50
01+460.00
01+467.50
01+475.00
01+482.47
01+489.56
01+495.00
SUB TOTAL
0.50
0.08
0.50
1.05
0.25
1.80
Descripcion
b
(m)
L
(m)
h
(m)
T. Parcial
Total
1.80
96.30
0.08
13.00
13.00 m3
13.00 m3
1.80
96.30
0.50
86.67
86.67 m3
PANTALLA
EJE A
EJE B
1
1
1
1
0.25
0.25
0.25
0.25
7.50
7.50
7.50
8.80
3.18
2.90
2.59
2.26
5.96
5.44
4.86
4.97
1
1
1
1
1
1
1
1
1
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
3.15
2.85
2.54
2.23
2.35
2.59
2.53
2.38
1.96
5.91
5.34
4.76
4.18
4.41
4.86
4.72
4.22
2.66
62.30 m3
148.97 m3
Und
ENTIDAD
OBRA
Hvar
Long
01+428.70
01+436.20
01+443.70
01+451.20
01+460.00
3.18
2.90
2.59
2.26
7.50
7.50
7.50
8.80
3.15
2.85
2.54
2.23
2.35
2.59
2.53
2.38
1.96
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
96.30
VAR
VAR
EJE "B"
01+430.00
01+437.50
01+445.00
01+452.50
01+460.00
01+467.50
01+475.00
01+482.47
01+489.56
01+495.00
SUB TOTAL
0.50
0.08
0.50
1.05
0.25
1.80
Descripcion
b
(m)
L
(m)
h
(m)
T. Parcial
Total
Und
612.A ENCOFRADO
ZAPATA
EJE AY B
2
96.30
0.50
96.30
96.30 m2
PANTALLA
EJE A
EJE B
1
1
1
1
0.25
0.25
0.25
0.25
3.18
2.90
2.59
2.26
0.80
0.73
0.65
0.57
-0.73
-0.65
1
1
1
1
1
1
1
1
1
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
3.15
2.85
2.54
2.23
2.35
2.59
2.53
2.38
1.96
0.79
0.71
0.64
0.56
0.59
0.65
0.63
0.60
0.49
-0.71
-0.64
-0.56
-0.59
-0.65
-0.63
-0.60
2
2
2
2
3.18
2.90
2.59
2.26
7.50
7.50
7.50
8.80
47.70
43.50
38.85
39.79
2
2
2
2
2
2
2
2
2
3.15
2.85
2.54
2.23
2.35
2.59
2.53
2.38
1.96
7.50
7.50
7.50
7.50
7.50
7.50
7.47
7.09
5.44
47.25
42.75
38.10
33.45
35.25
38.85
37.78
33.77
21.32
EJE A
EJE B
506.74 m2
597.30 m2
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
ZAPATA
#=
Long Tipica :
Long 01 :
Long 02 :
7.5
8.8
5.5
Long. Tol.
11
"
Long.
s (mm)
Gancho
Empalme
1/2
1/2
1/2
1/2
1.66
1.66
7.40
7.40
300
300
300
300
26
26
7
7
0.30
0.30
0.30
0.30
0.75
0.75
0.75
0.75
646.36
646.36
616.00
616.00
1/2
1/2
1/2
1/2
1.66
1.66
8.70
8.70
300
300
300
300
30
30
7
7
0.30
0.30
0.30
0.30
0.75
0.75
0.75
0.75
67.80
67.80
73.50
73.50
1/2
1/2
1/2
1/2
1.66
1.66
5.40
5.40
300
300
300
300
19
19
7
7
0.30
0.30
0.30
0.30
0.75
0.75
0.75
0.75
42.94
42.94
42.00
42.00
b. 9m
b. 12m
Acero
7.4
8.7
5.4
Total 3/8"
Total 1/2"
Total 5/8"
Total 3/4"
Total 1"
Peso Total (Kg)
0
2,977
0
0
0
Peso(Kg)
b. 9m
b. 12m
0
2,959
0
0
0
=
2,959
0
0
0
0
0
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
ZAPATA
Acero
#=
"
Long.
ELEVACION
Acero
7.5
8.8
5.5
11
s (mm)
#=
Long Tipica :
Long 01 :
Long 02 :
Gancho
Empalme
Long. Tol.
Long. Tol.
"
Long.
s (mm)
Gancho
Empalme
1/2
1/2
1/2
1/2
3.58
3.30
2.99
2.66
250
250
250
250
30
30
30
35
0.40
1.40
2.40
3.40
0.75
0.75
0.75
0.75
123.90
145.50
166.20
264.60
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
3.55
3.25
2.94
2.63
2.75
2.99
2.93
2.78
2.36
250
250
250
250
250
250
250
250
250
30
30
30
30
30
30
30
30
22
7.40
8.40
9.40
10.40
11.40
12.40
13.40
14.40
15.40
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
373.50
394.50
415.20
435.90
469.50
506.70
534.90
560.40
423.72
0.00
3/8
3/8
3/8
3/8
3.58
3.30
2.99
2.66
200
200
200
200
38
38
38
44
0.40
0.40
0.40
0.40
0.55
0.55
0.55
0.55
156.94
146.30
134.52
141.24
3/8
3/8
3/8
3/8
3/8
3.55
3.25
2.94
2.63
2.75
200
200
200
200
200
38
38
38
38
38
0.40
0.40
0.40
0.40
0.40
0.55
0.55
0.55
0.55
0.55
155.80
144.40
132.62
120.84
125.40
P1 Interno
P2 Externo
7.4
8.7
5.4
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
ZAPATA
Acero
P3 Long. Interno
#=
Long Tipica :
Long 01 :
Long 02 :
7.5
8.8
5.5
Long. Tol.
11
"
Long.
s (mm)
Gancho
Empalme
3/8
3/8
3/8
3/8
2.99
2.93
2.78
2.36
200
200
200
200
38
38
38
28
0.40
0.40
0.40
0.40
0.55
0.55
0.55
0.55
134.52
132.24
126.54
81.48
3/8
3/8
3/8
3/8
7.40
7.40
7.40
8.70
250
250
250
250
14
13
11
10
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
109.20
101.40
85.80
100.00
3/8
3/8
3/8
3/8
3/8
3/8
3/8
3/8
3/8
7.40
7.40
7.40
7.40
7.40
7.40
7.40
7.40
5.40
250
250
250
250
250
250
250
250
250
14
13
11
10
11
11
11
11
9
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
109.20
101.40
85.80
78.00
85.80
85.80
85.80
85.80
52.20
0.00
7.4
8.7
5.4
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
ZAPATA
Acero
P4 Long. Externo
#=
Long Tipica :
Long 01 :
Long 02 :
7.5
8.8
5.5
Long. Tol.
7.4
8.7
5.4
11
"
Long.
s (mm)
Gancho
Empalme
3/8
3/8
3/8
3/8
7.40
7.40
7.40
8.70
250
250
250
250
14
13
11
10
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
109.20
101.40
85.80
100.00
3/8
3/8
3/8
3/8
3/8
3/8
3/8
3/8
3/8
7.40
7.40
7.40
7.40
7.40
7.40
7.40
7.40
5.40
250
250
250
250
250
250
250
250
250
14
13
11
10
11
11
11
11
9
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
109.20
101.40
85.80
78.00
85.80
85.80
85.80
85.80
52.20
Total 3/8"
Total 1/2"
Total 5/8"
Total 3/4"
Total 1"
Peso Total (Kg)
b. 9m
4,065
4,815
0
0
0
Acero en Zapatas =
2,959.34 Kg
Acero en Elevacin =
7,062.17 Kg
b. 12m
Peso(Kg)
b. 9m
b. 12m
2,277
4,786
0
0
0
=
7,062
0
0
0
0
0
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
ZAPATA
Acero
#=
"
Long.
Long Tipica :
Long 01 :
Long 02 :
7.5
8.8
5.5
Empalme
Long. Tol.
11
s (mm)
TOTAL ACERO =
Gancho
10,021.50408 Kg
7.4
8.7
5.4
ENTIDAD
OBRA
VAR
VAR
Hvar
Long
3.10
3.03
2.98
2.93
2.87
7.32
7.42
7.50
7.50
7.50
3.32
3.27
3.21
3.16
7.50
7.50
7.50
7.50
0.50
0.08
0.60
1.20
0.30
2.10
SUB TOTAL
Descripcion
b
(m)
L
(m)
67.24
h
(m)
T. Parcial
Total
2.10
67.24
0.08
10.59
10.59 m3
10.59 m3
PANTALLA
EJE A
2.10
67.24
0.50
70.60
1
1
1
1
1
0.30
0.30
0.30
0.30
0.30
7.32
7.42
7.50
7.50
7.50
3.10
3.03
2.98
2.93
2.87
6.81
6.74
6.71
6.59
6.46
1
1
1
1
0.30
0.30
0.30
0.30
7.50
7.50
7.50
7.50
3.32
3.27
3.21
3.16
7.47
7.36
7.22
7.11
70.60 m3
62.47 m3
133.07 m3
Und
ENTIDAD
OBRA
VAR
VAR
Hvar
Long
3.10
3.03
2.98
2.93
2.87
7.32
7.42
7.50
7.50
7.50
3.32
3.27
3.21
3.16
7.50
7.50
7.50
7.50
0.50
0.08
0.60
1.20
0.30
2.10
SUB TOTAL
Descripcion
b
(m)
L
(m)
67.24
h
(m)
T. Parcial
Total
Und
612.A ENCOFRADO
ZAPATA
EJE AY B
2
PANTALLA
EJE A
EJE A
67.24
0.50
67.24
67.24 m2
1
1
1
1
1
0.30
0.30
0.30
0.30
0.30
3.10
3.03
2.98
2.93
2.87
0.93
0.91
0.89
0.88
0.86
-0.91
-0.89
-0.88
1
1
1
1
0.30
0.30
0.30
0.30
3.32
3.27
3.21
3.16
1.00
0.98
0.96
0.95
-0.98
-0.96
2
2
2
2
2
3.10
3.03
2.98
2.93
2.87
7.32
7.42
7.50
7.50
7.50
45.40
44.97
44.70
43.95
43.05
2
2
2
2
3.32
3.27
3.21
3.16
7.50
7.50
7.50
7.50
49.80
49.05
48.15
47.40
424.82 m2
487.44 m2
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
Long Tipica :
Long 01 :
Long 02 :
ZAPATA
Acero
SUPERIOR _L: 7.50
INFERIOR _L: 7.50
LONG. SUP _L: 7.50
LONG. INF _L: 7.50
#=
7.5
8.8
5.5
7.4
8.7
5.4
"
Long.
s (mm)
Gancho
Empalme
1/2
1/2
1/2
1/2
1.96
1.96
7.40
7.40
300
300
300
300
26
26
8
8
0.30
0.30
0.30
0.30
0.75
0.75
0.75
0.75
b. 9m
b. 12m
Total 3/8"
Total 1/2"
Total 5/8"
Total 3/4"
Total 1"
Peso Total (Kg)
0
2,350
0
0
0
Long. Tol.
599.04
599.04
576.00
576.00
Peso(Kg)
b. 9m
b. 12m
0
2,336
0
0
0
=
2,336
0
0
0
0
0
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
Long Tipica :
Long 01 :
Long 02 :
ZAPATA
Acero
#=
"
Long.
"
Long.
P1 Interno
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
9
n
Gancho
Empalme
Long. Tol.
s (mm)
Gancho
Empalme
Long. Tol.
3.50
3.43
3.38
3.33
3.27
250
250
250
250
250
30
30
30
30
30
0.40
0.40
0.40
0.40
0.40
0.75
0.75
0.75
0.75
0.75
121.50
119.40
117.90
116.40
114.60
3.72
3.67
3.61
3.56
250
250
250
250
30
30
30
30
0.40
0.40
0.40
0.40
0.75
0.75
0.75
0.75
128.10
126.60
124.80
123.30
ELEVACION
Acero
7.5
8.8
5.5
s (mm)
#=
0.00
7.4
8.7
5.4
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
Long Tipica :
Long 01 :
Long 02 :
ZAPATA
Acero
P2 Externo
P3 Long. Interno
P4 Long. Externo
#=
7.5
8.8
5.5
7.4
8.7
5.4
"
Long.
s (mm)
Gancho
Empalme
3/8
3/8
3/8
3/8
3/8
3.50
3.43
3.38
3.33
3.27
200
200
200
200
200
38
38
38
38
38
0.40
0.40
0.40
0.40
0.40
0.55
0.55
0.55
0.55
0.55
153.90
151.24
149.34
147.44
145.16
3/8
3/8
3/8
3/8
3.72
3.67
3.61
3.56
200
200
200
200
38
38
38
38
0.40
0.40
0.40
0.40
0.55
0.55
0.55
0.55
162.26
160.36
158.08
156.18
3/8
3/8
3/8
3/8
3/8
7.40
7.40
7.40
7.40
7.40
250
250
250
250
250
14
13
13
13
13
0.20
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
0.55
109.20
101.40
101.40
101.40
101.40
3/8
3/8
3/8
3/8
7.40
7.40
7.40
7.40
250
250
250
250
14
14
14
14
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
109.20
109.20
109.20
109.20
3/8
3/8
3/8
3/8
3/8
7.40
7.40
7.40
7.40
7.40
250
250
250
250
250
14
13
13
13
13
0.20
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
0.55
0.00
109.20
101.40
101.40
101.40
101.40
3/8
3/8
3/8
3/8
7.40
7.40
7.40
7.40
250
250
250
250
14
14
14
14
0.20
0.20
0.20
0.20
0.55
0.55
0.55
0.55
109.20
109.20
109.20
109.20
Total 3/8"
Total 1/2"
Total 5/8"
Total 3/4"
Total 1"
Peso Total (Kg)
Acero en Zapatas =
b. 9m
3,287
1,093
0
0
0
2,335.98 Kg
b. 12m
Long. Tol.
Peso(Kg)
b. 9m
b. 12m
1,841
1,086
0
0
0
=
2,927
0
0
0
0
0
ENTIDAD
OBRA
CONTRATISTA
SUPERVISOR
METRADO DE ACERO
KM 01+361.45 - KM 01+495.00
Long Tipica :
Long 01 :
Long 02 :
ZAPATA
Acero
#=
"
Long.
7.5
8.8
5.5
9
s (mm)
Acero en Elevacin =
TOTAL ACERO =
Gancho
Empalme
2,926.85 Kg
5,262.83 Kg
Long. Tol.
7.4
8.7
5.4
TRANSPORTES
ESTUDIO DEFINITIVO PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO
Inicio
(km)
Final
(km)
Material
Long.
(m)
C.G.
(km)
Material
Granular
(m3)
Material
Filtrante
(m3)
CANTERA VACA
Volumen
Total
(m3)
Ubicacin (km)
10.03
Acceso (km)
71.410
Distancia de
transporte
(km)
Material
(m3)
Momento de
transporte
(m3km)
Transporte de material
granular
(m3km)
D <= 1 km
D > 1 km
1+368.78
7.32
1.37
11.28
3.40
14.68
80.07
100%
14.68
1,175.49
12.92
1,160.80
1+368.78
1+376.20
7.42
1.37
12.54
3.38
15.92
80.06
100%
15.92
1,274.88
14.01
1,259.00
1+376.20
1+383.70
7.50
1.38
13.05
3.35
16.40
80.06
100%
16.40
1,313.12
14.43
1,296.70
1+383.70
1+391.20
7.50
1.39
10.24
3.29
13.52
80.05
100%
13.52
1,082.46
11.90
1,068.90
1+391.20
1+398.70
7.50
1.39
6.19
3.24
9.43
80.04
100%
9.43
754.59
8.30
745.20
1+398.70
1+406.20
7.50
1.40
12.49
3.74
16.22
80.03
100%
16.22
1,298.34
14.28
1,282.10
1+406.20
1+413.70
7.50
1.41
9.15
3.67
12.82
80.03
100%
12.82
1,025.73
11.28
1,012.90
1+413.70
1+421.20
7.50
1.42
6.34
3.62
9.96
80.02
100%
9.96
796.98
8.76
787.00
1+421.20
1+428.70
7.50
1.42
5.25
3.56
8.81
80.01
100%
8.81
704.50
7.75
695.70
1+428.70
1+436.20
7.50
1.43
9.19
2.98
12.17
80.00
100%
12.17
973.54
10.71
961.40
1+436.20
1+443.70
7.50
1.44
9.38
2.72
12.09
80.00
100%
12.09
967.45
10.64
955.40
1+443.70
1+451.20
7.50
1.45
8.70
2.44
11.14
79.99
100%
11.14
890.87
9.80
879.70
1+451.20
1+460.00
8.80
1.46
8.01
2.49
10.50
79.98
100%
10.50
839.60
9.24
829.10
1+430.00
1+437.50
7.50
1.43
2.96
2.96
5.93
80.00
100%
5.93
474.01
5.21
468.10
1+437.50
1+445.00
7.50
1.44
2.66
2.66
5.33
79.99
100%
5.33
425.97
4.69
420.60
1+445.00
1+452.50
7.50
1.45
2.38
2.38
4.76
79.99
100%
4.76
380.94
4.19
376.20
1+452.50
1+460.00
7.50
1.46
2.10
2.10
4.20
79.98
100%
4.20
335.91
3.70
331.70
1+460.00
1+467.50
7.50
1.46
2.21
2.21
4.43
79.97
100%
4.43
353.88
3.89
349.50
1+467.50
1+475.00
7.50
1.47
2.44
2.44
4.88
79.96
100%
4.88
389.83
4.29
385.00
1+475.00
1+482.47
7.47
1.48
2.35
2.35
4.70
79.96
100%
4.70
376.14
4.14
371.40
1+482.47
1+489.56
7.09
1.49
2.11
2.11
4.22
79.95
100%
4.22
337.51
3.71
333.30
1+489.56
1+495.00
5.44
1.49
1.33
1.33
2.66
79.94
200%
5.33
426.04
4.69
420.70
202.10
16,171.75
177.85
15,969.70
IZQUIERDO
142.34
202.10
Cantera
Material a
transportar
(m3)
Transporte de material
granular (m3km)
D <= 1 KM
D > 1 KM
CANTERA VACA
202.10
177.85
15,969.70
TOTAL
209.67
179.85
15,999.06
TRANSPORTES
ESTUDIO DEFINITIVO PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO
Inicio
(km)
Final
(km)
Long.
(m)
C.G.
(km)
Material a
eliminar
(m3)
Ubicacin Acceso
(km)
(km)
Distancia de
transporte
Material
%
Momento de
transporte
(m3km)
(m3)
(km)
Transporte de material
excedente a DME
(m3km)
D <= 1 km
D > 1 km
1+368.78
7.32
1.37
19.48
10.03
9.147
17.81
100%
19.48
344.48
17.14
327.30
1+368.78
1+376.20
7.42
1.37
21.07
10.03
9.147
17.80
100%
21.07
372.56
18.54
354.00
1+376.20
1+383.70
7.50
1.38
21.68
10.03
9.147
17.79
100%
21.68
383.05
19.07
364.00
1+383.70
1+391.20
7.50
1.39
18.56
10.03
9.147
17.78
100%
18.56
327.90
16.34
311.60
1+391.20
1+398.70
7.50
1.39
13.88
10.03
9.147
17.78
100%
13.88
245.00
12.21
232.80
1+398.70
1+406.20
7.50
1.40
22.35
10.03
9.147
17.77
100%
22.35
394.47
19.67
374.80
1+406.20
1+413.70
7.50
1.41
18.68
10.03
9.147
17.76
100%
18.68
329.47
16.43
313.00
1+413.70
1+421.20
7.50
1.42
15.45
10.03
9.147
17.75
100%
15.45
272.46
13.60
258.90
1+421.20
1+428.70
7.50
1.42
14.29
10.03
9.147
17.75
100%
14.29
251.85
12.57
239.30
1+428.70
1+436.20
7.50
1.43
18.75
10.03
9.147
17.74
100%
18.75
330.37
16.50
313.90
1+436.20
1+443.70
7.50
1.44
18.94
10.03
9.147
17.73
100%
18.94
333.53
16.67
316.90
1+443.70
1+451.20
7.50
1.45
18.11
10.03
9.147
17.72
100%
18.11
318.87
15.94
302.90
1+451.20
1+460.00
8.80
1.46
18.84
10.03
9.147
17.72
100%
18.84
331.49
16.58
314.90
IZQUIERDO
1+430.00
1+437.50
7.5
1.43
29.89
10.03
9.147
17.74
100%
29.89
526.57
26.30
500.30
1+437.50
1+445.00
7.5
1.44
32.48
10.03
9.147
17.73
100%
32.48
571.92
28.58
543.30
1+445.00
1+452.50
7.5
1.45
30.19
10.03
9.147
17.72
100%
30.19
531.41
26.57
504.80
1+452.50
1+460.00
7.5
1.46
25.50
10.03
9.147
17.72
100%
25.50
448.70
22.44
426.30
1+460.00
1+467.50
7.5
1.46
24.00
10.03
9.147
17.71
100%
24.00
422.12
21.12
401.00
1+467.50
1+475.00
7.5
1.47
29.96
10.03
9.147
17.70
100%
29.96
526.77
26.37
500.40
1+475.00
1+482.47
7.5
1.48
39.05
10.03
9.147
17.69
100%
39.05
686.29
34.37
651.90
1+482.47
1+489.56
7.1
1.49
35.44
10.03
9.147
17.69
100%
35.44
622.54
31.19
591.40
1+489.56
1+495.00
5.4
1.49
22.32
10.03
9.147
17.68
100%
22.32
391.99
19.64
372.30
508.89
8,963.83
447.82
8,516.00
508.89
OBRA
TRAMO
: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO
CONTRATISTA
: CONSORCIO PUCALLPA
SUPERVISOR
Ubicacin
Inicio
(km)
Final
(km)
Material
Long.
(m)
C.G.
(km)
Concreto
f'c=100
kg/cm2 (m3)
Concreto
Volumen Agreg
f'c=210
p/Concreto Total
kg/cm2
(m3)
(m3)
Ubicacin (km)
Acceso (km)
Distancia de
transporte
(km)
Transporte de material
granular
(m3km)
Momento de
transporte
(m3km)
D <= 1 km
D > 1 km
1+460.00
31.30
1.44
4.23
5.28
88.08
100%
5.28
465.28
4.65
460.00
1+430.00
1+495.00
65.00
1.46
8.78
10.97
88.06
100%
10.97
965.94
9.65
955.00
1+428.70
1+436.20
7.50
1.43
5.96
7.45
88.09
100%
7.45
656.57
6.56
649.10
1+436.20
1+443.70
7.50
1.44
5.44
6.80
88.09
100%
6.80
598.71
5.98
591.90
1+443.70
1+451.20
7.50
1.45
4.86
6.07
88.08
100%
6.07
534.66
5.34
528.60
1+451.20
1+460.00
8.80
1.46
4.97
6.22
88.07
100%
6.22
547.54
5.47
541.30
EJE A
PANTALLA
EJE B
PANTALLA
1+430.00
1+437.50
7.50
1.43
5.91
7.38
88.09
100%
7.38
650.37
6.50
643.00
1+437.50
1+445.00
7.50
1.44
5.34
6.68
88.08
100%
6.68
588.38
5.88
581.70
1+445.00
1+452.50
7.50
1.45
4.76
5.95
88.08
100%
5.95
524.33
5.24
518.40
1+452.50
1+460.00
7.50
1.46
4.18
5.23
88.07
100%
5.23
460.30
4.60
455.10
1+460.00
1+467.50
7.50
1.46
4.41
5.51
88.06
100%
5.51
485.03
4.85
479.50
1+467.50
1+475.00
7.50
1.47
4.86
6.07
88.05
100%
6.07
534.52
5.34
528.40
1+475.00
1+482.47
7.47
1.48
4.72
5.90
88.05
100%
5.90
519.79
5.20
513.90
1+482.47
1+489.56
7.09
1.49
4.22
5.28
88.04
100%
5.28
464.58
4.64
459.30
1+489.56
1+495.00
5.44
1.49
2.66
3.33
88.03
100%
3.33
293.22
2.93
289.90
1+428.70
1+460.00
31.30
1.44
28.17
35.22
88.08
100%
35.22
3,101.87
30.99
3,066.70
1+430.00
1+495.00
65.00
1.46
58.50
73.13
88.06
100%
73.13
6,439.63
64.35
6,366.50
13.24
88.13
100%
13.24
1,166.70
11.65
1,153.50
ZAPATA
TIPO III
1+428.70
67.242
1.40
1+361.46
1+368.78
7.322
1.37
6.81
8.51
88.16
100%
8.51
750.41
7.49
741.90
1+368.78
1+376.20
7.420
1.37
6.74
8.43
88.15
100%
8.43
743.22
7.42
734.80
1+376.20
1+383.70
7.500
1.38
6.71
8.38
88.15
100%
8.38
738.77
7.38
730.40
1+383.70
1+391.20
7.500
1.39
6.59
8.24
88.14
100%
8.24
726.32
7.25
718.10
1+391.20
1+398.70
7.500
1.39
6.46
8.07
88.13
100%
8.07
711.38
7.10
703.30
1+398.70
1+406.20
7.500
1.40
7.47
9.34
88.12
100%
9.34
822.85
8.22
813.50
1+406.20
1+413.70
7.500
1.41
7.36
9.20
88.12
100%
9.20
810.39
8.09
801.20
1+413.70
1+421.20
7.500
1.42
7.22
9.03
88.11
100%
9.03
795.45
7.94
786.40
1+421.20
1+428.70
7.500
1.42
7.11
8.89
88.10
100%
8.89
783.00
7.82
774.10
1+428.70
67.242
1.40
70.60
88.26
88.13
100%
88.26
7,777.99
77.66
7,689.70
282.04
382.04
382.04
33,657.20
336.20
33,275.20
1+361.46
10.59
EJE A
PANTALLA
ZAPATA
1+361.46
23.59
62.47
Cantera
CANTERA ISLA GUINEAL
TOTAL
Material a
transport
ar
(m3)
Transporte de material
granular (m3km)
D <= 1 KM
D > 1 KM
Distancia
media
KM
382.04
336.20
33,275.20
88.10
382.04
336.20
33,275.20
88.10