Está en la página 1de 1

O N LY

.com.au

www.

BASELINE
T

10

25

20

15

30

35

45

40

50

60

55

65

70

75

80

85

90

PROFILE

2150

TIER 3

TIER 2
AIR
DRYER

4737

AIR RECEIVER

AIR COMPRESSOR
AIR
MANIFOLD

TIER 1
VOID 7

VOID 8

ENGINE ROOM

SHAFT ALLEY

VOID 6

VOID 3

VOID 4

VOID 5

ENGINE ROOM

VOID 2
VOID 1

LNG TANK
P&S (50 cu. m)

VOID 9
JET ROOM

FOREPEAK
HALF HEIGHT FUEL

HALF HEIGHT FUEL

TANK (P&S)

TANK (P&S)

BASELINE
T

10

25

20

15

30

35

45

40

50

60

55

65

70

75

80

85

90

MIDSHIP SECTION

INBOARD PROFILE

DOWN

C
L VESSEL
10

20

15

25

35

30

45

40

50

55

60

65

70

75

80

85

90

PR E LIM IN A R Y

DOWN

VIEW FROM ASTERN


UPPER DECK AND WHEELHOUSE
T

10

25

20

15

30

35

45

40

50

60

55

70

75

80

85

90

65

70

75

80

85

90

80

85

90

DN

DN

DOWN

65

FEMALE
CHILDRENS
PLAY ROOM

FEMALE

PANTRY

MALE
DISABILITY
TOILET

DB1N

CAFE/BAR

CLARK

C
L VESSEL
T

10

25

20

15

35 30

45

40

50
CLARK

fire
door

PANTRY

KIOSK

60

55

ELECTRONICS

UP

crew lounge

BAR

CLARK

DB3

MEDICAL

FEMALE

DOWN

DN

DN

TIER 3
T

10

25

20

15

MES

30

35

45

40

MES

S.T.D

50

60

55

65

75

MES

HOLDING

DN

70

CELLS
FIRE
UP

UP

UP

S.T.D

DN

DOOR

FIRE
DOOR

.com.au

www.
OPTIONAL TIER 2
LOADING RAMP

114

C
L VESSEL
T

10

25

20

15

30

35

45

40

50

60

55

65

70

75

80

85

90

PRINCIPAL PARTICULARS

RAMP
FIRE
DOWN

DOOR
UP

FIRE

UP

DOOR
DN

S.T.D
S.T.D

MES

10

MES

20

15

25

30

MES

35

45

40

50

60

55

65

70

75

80

85

LOA

114.2M

LWL

106.8M

90

BEAM (MOULDED) 30.5M

TIER 2

LANE METRES

UP

SHAFT ALLEY

E.R.

E.R.

ACCESS

ESCAPE

ESCAPE

+ 222 car spaces (4.5m x 2.3)


at 2.15m clear height
or
404 car spaces (4.5m x 2.3m)

UP

DN

UP

JET ROOM

550 TLM @ 4.6m clear height

RAMP

17

18

UP

19

20

COMPLEMENT

21
ENGINE COOLANT TK.

1200 PERSONS

(BELOW DECK)

RAMP
UP

C
L VESSEL
T

10

25

20

15

30

35

45

40

50

11

13

16

10

12

14

15

60

55

65

70

75

80

85

90

85

90

22
UP

26

25

24

RAMP
UP
RAMP

JET ROOM

23

UP

DN

UP

UP
SHAFT ALLEY

E.R.

E.R.

ACCESS

ESCAPE

ESCAPE

VOID 5
VOID 6
MANHOLE (P&S)

E.R. ACCESS (P&S)


E.R. ESCAPE (P&S)

MANHOLE (P&S)

VOID 3

VOID 2

VOID 1

MANHOLE (P&S)

MANHOLE (P&S)

MANHOLE (P&S)

VOID 4
MANHOLE (P&S)

E.R. ESCAPE (P&S)

TIER 1

SHAFT ALLEY
ACCESS (P&S)

C
L VESSEL
T

10

15

20

25

30

35

40

45

50

60

55

65

70

75

80

PROPRIETARY INFORMATION
ENGINE ROOM

JET ROOM

SHAFT ALLEY

VOID 3

LNG TANK
P&S (50 cu. m)

VOID 6

VOID 2

FOREPEAK

PLAN BELOW DECKS

ISSUED BY:

ISSUE DATE:

DRAWN BY:

APPROVED BY:

16 BENDER DRIVE MOONAH TASMANIA 7009 AUSTRALIA

BILGE WATER

PHONE/FAX +61 3 6274 1845

EMAIL revolutiondesign@revolutiondesign.com.au
INTERNET www.revolutiondesign.com.au

G. STEWART
DATE:

114 M WAVE PIERCING CATAMARAN


CONCEPTUAL
GENERAL ARRANGEMENT

11 AUG '14
DWG. No:

CPV-114-32-923

SCALE:

1:300 (A1)
REV.

REV. DATE:

OR REPRODUCED I
N W HOLE OR I
N PART,W I
THOUT

LUBE OIL TANK

PERMI
SSI
ON I
N W RI
TI
NG.

HOLDING TANK

THAT I
TI
S THE EXCLUSI
VE PROPERTY OF REVOLUTI
ON

(PORT SIDE ONLY)

HEREON,I
S SUPPLI
ED ON THE UNDERSTANDI
NG

ISSUED TO:

UP

DESI
GN PTY.LTD.AND MUST NOT BE USED

DOWN

HALF HEIGHT
FUEL TANK
P&S

THI
S DRAW I
NG AND THE I
NFORMATI
ON CONTAI
NED

VOID 1
ENGINE ROOM

HALF HEIGHT
FUEL TANK
P&S

También podría gustarte