Está en la página 1de 5

CT Connection / 2008-07-01 /SJ

ABB Switzerland Ltd. - 1

 Technology and
Protection and Substation Automation
Solutions

Primary
Current
Plausibility
REB500

ABB

Primary Current Plausibility (PCP) Release Criteria


This feature was introduced in version 7.32.02.
The primary current plausibility release criteria is based on the principle
that at least 2 Feeders must have a change in current flow for a real
primary fault condition.
(The current change |di/dt| must be above 0.075*actual current/100ms.)
BBP-Trip is released, for the following conditions are applied to the criteria:
1.
2.

ABB Switzerland Ltd. - 2


CT Connection / 2008-07-01 /SJ

3.

In case no feeder current exceeds 0.075*IN (per protection zone).


For approx. 400ms if the isolator/breaker image has changed.
This enables busbar faults to be detected that occur the instant a bay is
connected even if the phase of the current changes in only one bay unit.
When the PCP parameter release delay, if configured, experied.

ABB

ABB Switzerland Ltd. - 3


CT Connection / 2008-07-01 /SJ

Primary Current Plausibility (PCP) Release Criteria

ABB

Primary Current Plausibility (PCP) Setting


Applies for Firmware 7.32.02 7.33.05.

ABB Switzerland Ltd. - 4


CT Connection / 2008-07-01 /SJ

The PCP release is disabled as default.


As intermediate solution an already existing parameter BBP Trip Delay is used for
configuration of the PCP. The former function BBP Trip Delay is not longer
available.

BBP Trip Delay = 0


PCP is disabled
BBP Trip Delay = 1-254
PCP is enabled,
PCP will be released after 1-254*
bus cycles in any case.
BBP Trip Delay = 255
PCP is enabled, no delayed release
functionality.

ABB

Primary Current Plausibility (PCP) Setting


Applies for Firmware 7.40.0 and higher.

ABB Switzerland Ltd. - 5


CT Connection / 2008-07-01 /SJ

The PCP release is disabled as default.


A new Paramert PCP release delay is introduced. The former function BBP Trip
Delay is not longer available.

PCP Release Delay = 0


PCP is disabled
PCP Release Delay = 1-254
PCP is enabled,
PCP will be released after 1-254*
bus cycles in any case.
PCP Release Delay = 255
PCP is enabled, no delayed release
functionality.

ABB

También podría gustarte