Professional
:careers
Pipeline and tanks maintenance engineer-15-11-1984Head of Pipeline and Tanks maintenance dept -28-3-1992 Head of Mechanical Dept-6-3-1996 Assisting of Engineering Manager -29-8-2002 :Current position
Head of Mech Eng Dept + Assisting of Engineering Manage
construction of 50 km 10 inches pipeline in desert construction of pumping station with tow electrical pumps, 4800 cu m each for loading of crude oil to oil tankers
construction of complete intermediate pumping station with 3 parallel 1400cu m each &2 vertical submergible pump &3 x 15000cu m storage
tanks and all service pumps & facilities
inline inspection of 24 inches dia pipeline with 116 km length by using geometric & old fashion( low resolution) MFL intelligent pigs in1984
inline inspection of 24 inches dia pipeline with 100 km length by using geometric & UT intelligent pigs in 1997
inline inspection of 24 inches dia pipeline by using geometric &MFL high resolution pigs in 1998 & 2006
inline inspection of 7 sub see loading lines by using UT modern
technology in 2004
dislodging 10 tanks& 5 ground pits by using heat treatment & chemical methods
repairing of corroded parts of main pipelines at 240 locations by using fiberglass layers with epoxy resins in 2001,2005&2011
raising four existing main line above tow new bridges ,which
constructed on tow rivers by using stopple operation method
supervising of welding execution and inspection of all welds in
pipeline and tanks construction acc to American Standards
hydrostatic testing of pipeline &tanks projects -
construction of new pipeline ,10 inches dia&50 km length, in desert modification of existing berth by installation of new
displacement pipeline to be suitable to import& export gas oil& fuel oil
modification of existing gas turbine to be working by using diesel oil or gas (dowel system)if some accident occurred in gas pipeline
and estimate the coast of each option of pipeline corridor routes, dia,
grades & pumping stations ,generated power to chose economic option
for negotiation between ministry& investors
Hydraulic calculation to transport 1.5 Mbbl/d from Iraqi border to Mediterranean sea and identify the corridor of pipeline, dia, grades,
pumping station locations, pumps nos, generated powers
( Zanobia project )
Hydraulic calculation to import, export/ 9/ of oil products from / to refinery on supposed jetty on Mediterranean sea
:Books
Cross countries pipeline ,the problem of maintenance and
repair