Conceptos

Reservas
Ley de Cobre
Factor de correccion Hosking
T=
T=
Mineral
Toneladas por ao
Toneladas por mes
Toneladas por da
Lastre
Ratio
Toneladas por ao
Movimiento Total
Parametros para Evaluacin Economica
Precio Cobre
Recuperacin metalurgica
costo mina mineral
costo mina lastre
administracin
Comercializacin
Planta
Analisis Economico
ingresos
Gastos Mina
Gastos Planta
Gastos en Comercializacin
Gastos G&A
Utulidad (1) directa
INVERSION
Toneladas de cobre fino ao
Costo por inverin
Gasto en Inversin

ANALISIS FINANCIERO CASO A


Aos
Inversin
Flujos C1
Flujo anual actualizado
Tasa de descuento
TIR
VPN
Flujo anual actualizado acum.
Periodo de pago
ANALISIS FINANCIERO CASO B
Aos

(ton)
(%)

(aos)
(aos)

(ton)
(ton)
(ton)

(ton)
(ton)

(US$/lb)
Lixiviacin
(US$/ton)
(US$/ton)
(US$/lb)
(US$/lb)
(US$/ton min)

(US$)
(US$)
(US$)
(US$)
(US$)
(US$)

(TMF)
(US$/TMF)
(US$)

0
-4,312,035,000
-4,312,035,000
6.0
8.9%
2,199,522,951

CASO A
630,000,000
0.78
0.5
15.6561566851
16
39,375,000
3,281,250
109,375.0
1.6
63,000,000.0
102,375,000.0
2.71
78.00
1.4
1.23
0.10
0.05
6.20
1,431,241,123
132,615,000
250,031,250
26,406,663
52,813,326
1,048,594,873
239,558
18,000.00
4,312,035,000

1
1,048,594,873
989,240,446

dolares
-3,322,794,554

4,5 aos

Inversin
Flujos C1
Flujo anual actualizado
Tasa de descuento
TIR
VPN
Flujo anual actualizado acum.
Periodo de pago
ANALISIS FINANCIERO CASO C
Aos
Inversin
Flujos C1
Flujo anual actualizado
Tasa de descuento
TIR
VPN
Flujo anual actualizado acum.
Periodo de pago

-2,653,560,000
-2,653,560,000
6
0
1,353,552,585

645,289,152
608,763,351

dolares
-2,044,796,649

4,5

0
-2,156,017,500
-2,156,017,500
6
0
1,099,761,476
4,5

1
524,297,436
494,620,223

dolares
-1,661,397,277

CASO B
630,000,000
0.78
0.8
25.0498506962
26

CASO C
630,000,000
0.78
1.0
31.3123133702
32

24,230,769
2,019,231
67,307.7

19,687,500
1,640,625
54,687.5

1.6
38,769,230.8
63,000,000.0

1.6
31,500,000.0
51,187,500.0

2.71
78.00
1.4
1.23
0.10
0.05
6.20

2.71
78.00
1.4
1.23
0.10
0.05
6.20

880,763,768
81,609,231
153,865,385
16,250,254
32,500,508
645,289,152

715,620,561
66,307,500
125,015,625
13,203,331
26,406,663
524,297,436

147,420
18,000.00
2,653,560,000

119,779
18,000.00
2,156,017,500

1,048,594,873
933,245,704

1,048,594,873
880,420,475

1,048,594,873
830,585,354

1,048,594,873
783,571,089

-2,389,548,850

-1,509,128,375

-678,543,021

105,028,068

645,289,152
574,305,049

645,289,152
541,797,216

645,289,152
511,129,449

645,289,152
482,197,593

-1,470,491,600

-928,694,385

-417,564,936

64,632,657

524,297,436
466,622,852

524,297,436
440,210,238

524,297,436
415,292,677

524,297,436
391,785,544

-1,194,774,425

-754,564,187

-339,271,510

52,514,034

1,048,594,873
739,218,008

1,048,594,873
697,375,479

1,048,594,873
657,901,396

1,048,594,873
620,661,694

844,246,076

1,541,621,556

2,199,522,951

2,820,184,645

645,289,152
454,903,390

645,289,152
429,154,141

645,289,152
404,862,397

645,289,152
381,945,658

519,536,047

948,690,188

1,353,552,585

1,735,498,243

524,297,436
369,609,004

524,297,436
348,687,740

524,297,436
328,950,698

524,297,436
310,330,847

422,123,038

770,810,778

1,099,761,476

1,410,092,323

10
1,048,594,873
585,529,900

3,405,714,546

10

645,289,152
360,326,092

2,095,824,336

10
524,297,436
292,764,950

1,702,857,273

Movimiento de Materiales en Operaciones Mina Caso A


Mineral
Lastre
Toneladas por ao
Toneladas por mes
Toneladas por da

(ton)
(ton)
(ton)

39,375,000
3,281,250
107,877

Movimiento Total (TPD)


Movimiento Total (TPH)

Ratio
Toneladas por ao
Toneladas por mes
Toneladas por da
280,479
16,427

Tiempo de Operacin
Chancado
Tiempo Nominal
Disponibilidad Fsica
Uso del Tiempo
Factor de Eficiencia
Tiempo de Operacin
TPH Chancado

(horas/da)
(%)
(%)
(%)
(horas/da)
(ton)

24
94
100
95
21.4
5,033

Dimensiones Equipos Mina


Equipos de Carguio
Pala Electrica
Pala Hidraulica
Cargador Frontal
Mov. Total

Equipos de Carguio
Pala Electrica
Pala Hidraulica
Cargador Frontal
Mov. Total

Equipos de Carguio
Pala Electrica
Pala Hidraulica
Cargador Frontal
Mov. Total

Opcin 1
TPH requerida N Equipos
5,000
3
1,700
16,700

1
4

Opcin 2
N Equipos
5,000
2
3,500
1
1,700
2
16,900
5

TPH requerida

Opcin 2
TPH requerida N Equipos
5,000
2
3,500
1,700
4
16,800
6

Mina - Carguio
Tiempo Nominal
Disponibilidad Fsica
Uso del Tiempo
Factor de Eficiencia
Tiempo de Operacin
TPH cargadas mineral
TPH cargadas lastre

(ton)
(ton)
(ton)

(horas/da)
(%)
(%)
(%)
(horas/da)
(ton)
(ton)

1.6
63,000,000
5,250,000
172,603

24
90
85
93
17.1
6,318
10,109