COMPLETE 30/10/2010 UNIT-4

7ME03
MULTIPLE CHOICE QUESTION(unit-4 & unit-5)
1- GERT is a :a)technique which deals with the probability.
b)computerized PERT
c)technique which has become obsolute now
d)dual
Ans-a
2- In case the value of variance is more than:a)uncertainty is more.

b)certainly is more

c)probability is more

d)simplex

Ans-a
3-While PERT is:a) Event.
c)Time

b)Float
d) Activity

Ans-a
4.CPM net work:a)activity.
c)time

b)event
d)float

Ans-a
5- A dummy activity:a)linear programming
c)simplex method

b)waiting line model


d)none of these

Ans-d
6-Which of the following is resource:a)event

b)time

c)event

d)none of these

Ans-d
7. Slack is:a)least available time.

b)same as delay

c)tolerance in terms of time

d)earliest expected

Ans-a
8.Which of the following methods are used for system analysis:a)Assignment model

b)Row minimum method

c)Column method

d)None of these

Ans-d
9- ABC analysis is used in:a) Inventory control.
c)PERT

b)CPM
d)Assignment

Ans-a
10- PERT and CPM are:a)Aida to the decision making.

b)Models

c)Quantative technique

d)Control

Ans-a
11-In pertetual control, the material is checked as it reaches-

Ans-b

a)max value

b)min value.

c)zero value

d)none of above

12-A milestone charta) max value

b)min value

c)zero value

d)none of above

Ans-d
13- The first method invented for planning projectsa)nodel chart method

b)line method

c)bar chart method.

d)none of above

Ans-c
14-The performance of specific task in CPMa)Event

b)Time

c)Activity.

d)None of above

Ans-c
15-The critical activity shows that:a)Activity

b) No float

c)Zero float.

d)None of above

Ans-c
16- Critical path on the correct statement says that;a)Min slack.

b)Max slack

c)Zero slack

d)All of above

Ans-a
17-Slack of various events on the critical path means that:a)Zero

b)Remain constant.

c)Max

d)Min

Ans-b
18-Negative float can occur:-

a)in case of super critical activity only.


b)in case of normal activity
c)max

d)min

Ans-a
19-As the value of variance increasea)uncertainty

b)uncertainty remain unaffected

c)max

d)none of above

Ans-d
20-Shewart control charts are useda)quality control.

b)work control

c)randomness

d)motion study

Ans-a
21.The probability distribution of activity times in PERT followsa).Normal
b) Binomal
c)Beta.
d) Exponential
Ans- c
22.The probability distribution of project completion in PERT follows
a) Normal
b) Binomial
c)Beta

d) Gaussian.

Ans- d
23. Critical activities are those for whicha)Float=0.
b) Float=+1
c)Float<1

d) Float>1

Ans- a
24.In linear programming shadow prices area)Cost of brought out items
b)Max cost per item
c)Value assigned per unit.
d) Lowest sale prices
Ans- c

25 The value of base variable in the assignment model isa)2 or 4


b) 1or 0
c)1 or 2.
d) 0 or 4
Ans- c
26 The artificial variable are made to leave the base and never to enter in the further
iteration by the applicationa)Big M method
b) Two phase method
a) Simplex method
d) Both a and b.
Ans- d
27 In the simplex method the variable which have not been assigned the value zero,
during an iteration, are calleda)Basic variable.
b) Artificial variable
c)Actual variable
d) None of the above
Ans- a
28 Limitation of linear programming model are based on criterian ofa)Proportionality
b) Additivity
c)Divisibility
d) All of above.
Ans- d
29 Simulation is basically a technique which is useda)Optimisation
b) Testing alternatives.
c)Cost minimization
d) Computerisation
Ans- b
30 Simulation is useda)To analyse and evaluate a system performance
b)To accommodate a great degree of complexity
c)To determine the system outcome
d)All of above
Ans- d
31 Critical activity hasa)Max float
c)Zero float

b) min float
d) None of above

Ans-d
32 Critical path moves along the activities having total float of-

a)Positive value
c)Zero value.

b) negative value
d) Same value

Ans- c
33 In the graphical method of linear programming problem every corner of the feasible polygon
indicates
(a) a basic feasible solution
(c) a & b

(b) optimum solution


(d) none of above

Ans: (d)
34.In an linear programming model there are four discision variable and three constraints.
During an iteration by simplex method the cofficien of base variable would form
(a) an identity metrix.
(c)basic solution

(b) slack variable


(D) none

Ans: a
35.A linear programming problem is called so,because in that problem
(a)all the functions expressing constraints are linear
(b)the objective function also linear
(c)both a& b
(d)none of the above
Ans-d
36.The value of base variable in the assignement variable is
(A)2 or 4
(b)1 or 0
(C)1 or 2.
(d)0 or 4
Ans-c
37.Limitation of linear programming models are based on criteria of

(A)proportionality
(b)additive
(c)divisibility
(D)all of above
Ans-d
38.PERT is
(a)activity oriented
(b)event oriented
(C)cost oriented.
(d)none of above
Ans-c
39-While PERT is:a) Event.
c)time

b)float
d) activity

Ans-a
40.CPM net work:a)activity.
c)time
Ans-a

b)event
d)float