7ME03
MULTIPLE CHOICE QUESTION(unit-4 & unit-5)
1- GERT is a :a)technique which deals with the probability.
b)computerized PERT
c)technique which has become obsolute now
d)dual
Ans-a
2- In case the value of variance is more than:a)uncertainty is more.
b)certainly is more
c)probability is more
d)simplex
Ans-a
3-While PERT is:a) Event.
c)Time
b)Float
d) Activity
Ans-a
4.CPM net work:a)activity.
c)time
b)event
d)float
Ans-a
5- A dummy activity:a)linear programming
c)simplex method
Ans-d
6-Which of the following is resource:a)event
b)time
c)event
d)none of these
Ans-d
7. Slack is:a)least available time.
b)same as delay
d)earliest expected
Ans-a
8.Which of the following methods are used for system analysis:a)Assignment model
c)Column method
d)None of these
Ans-d
9- ABC analysis is used in:a) Inventory control.
c)PERT
b)CPM
d)Assignment
Ans-a
10- PERT and CPM are:a)Aida to the decision making.
b)Models
c)Quantative technique
d)Control
Ans-a
11-In pertetual control, the material is checked as it reaches-
Ans-b
a)max value
b)min value.
c)zero value
d)none of above
b)min value
c)zero value
d)none of above
Ans-d
13- The first method invented for planning projectsa)nodel chart method
b)line method
d)none of above
Ans-c
14-The performance of specific task in CPMa)Event
b)Time
c)Activity.
d)None of above
Ans-c
15-The critical activity shows that:a)Activity
b) No float
c)Zero float.
d)None of above
Ans-c
16- Critical path on the correct statement says that;a)Min slack.
b)Max slack
c)Zero slack
d)All of above
Ans-a
17-Slack of various events on the critical path means that:a)Zero
b)Remain constant.
c)Max
d)Min
Ans-b
18-Negative float can occur:-
d)min
Ans-a
19-As the value of variance increasea)uncertainty
c)max
d)none of above
Ans-d
20-Shewart control charts are useda)quality control.
b)work control
c)randomness
d)motion study
Ans-a
21.The probability distribution of activity times in PERT followsa).Normal
b) Binomal
c)Beta.
d) Exponential
Ans- c
22.The probability distribution of project completion in PERT follows
a) Normal
b) Binomial
c)Beta
d) Gaussian.
Ans- d
23. Critical activities are those for whicha)Float=0.
b) Float=+1
c)Float<1
d) Float>1
Ans- a
24.In linear programming shadow prices area)Cost of brought out items
b)Max cost per item
c)Value assigned per unit.
d) Lowest sale prices
Ans- c
b) min float
d) None of above
Ans-d
32 Critical path moves along the activities having total float of-
a)Positive value
c)Zero value.
b) negative value
d) Same value
Ans- c
33 In the graphical method of linear programming problem every corner of the feasible polygon
indicates
(a) a basic feasible solution
(c) a & b
Ans: (d)
34.In an linear programming model there are four discision variable and three constraints.
During an iteration by simplex method the cofficien of base variable would form
(a) an identity metrix.
(c)basic solution
Ans: a
35.A linear programming problem is called so,because in that problem
(a)all the functions expressing constraints are linear
(b)the objective function also linear
(c)both a& b
(d)none of the above
Ans-d
36.The value of base variable in the assignement variable is
(A)2 or 4
(b)1 or 0
(C)1 or 2.
(d)0 or 4
Ans-c
37.Limitation of linear programming models are based on criteria of
(A)proportionality
(b)additive
(c)divisibility
(D)all of above
Ans-d
38.PERT is
(a)activity oriented
(b)event oriented
(C)cost oriented.
(d)none of above
Ans-c
39-While PERT is:a) Event.
c)time
b)float
d) activity
Ans-a
40.CPM net work:a)activity.
c)time
Ans-a
b)event
d)float