Calend Val de Obra
Calend Val de Obra
OBRA
ITEM
MES 01
MES 02
PARCIAL [S/.]
OBRAS PROVISIONALES
3,694.62
3,694.62
02
OBRAS PRELIMINARES
8,942.08
8,942.08
03
1,080.00
1,080.00
2,160.00
04
MOVIMIENTO DE TIERRAS
39,375.63
7,875.13
47,250.75
05
06
07
GRASS ARTIFICIAL
08
PISOS Y PAVIMENTOS
09
CARPINTERIA METALICA
10
PINTURA
11
SISTEMA DE DRENAJE
6,094.58
12
FLETE TERRESTE
3,000.00
13
VARIOS
7,234.41
7,234.41
493.80
493.80
76,236.00
76,236.00
6,310.85
6,310.85
2,824.60
2,824.60
130.65
130.65
6,094.58
3,000.00
6,000.00
2,112.00
2,112.00
75,732.17
7,401.90
6,058.57
89,192.64
16,054.68
93,752.18
9,163.14
7,500.17
110,415.49
19,874.79
169,484.34
16,565.04
13,558.75
199,608.13
35,929.46
105,247.32
130,290.28
235,537.59
% AVANCE MENSUAL
44.68%
55.32%
44.68%
100.00%
COSTO DIRECTO
##### GASTOS GENERALES ( 9.77% )
##### UTILIDAD (8.0%)
SUB TOTAL
I. G. V. 18%
% AVANCE ACUMULADO