Está en la página 1de 1

marterial requirement for ash unit 1

AREA
Bed material bunker
BED ASH HOPPER

MATERIAL DESCRIPTION
solienoid valve
solenoid valve
vent fan and vent filter connection spool not available

ECO & APH

ESP
BAISH
FAISH
BAH TO BAISH DRC LINE
BAISH TO SILO
BAISH TO SILO
SILO
SILO
FA Line
FA Line
FA Line
FA Line
FA Line
BAH
BAH
BAISH
BAH
BAH
FAISH & ECO &APH
AHS

Orifice Plate (for Fludizing & Air conveying line)


Orifice Plate (for Air conveying line)
Orifice Plate (for Fludizing & Air conveying line)
125/150 NB expander
150/175 NB DRC Enlarger
175/200 NB DRC Enlarger
UNION FOR AERIATION PANEL
200 NB DRC PIPE CONNECTING FLANGE AND 200 NB
MS PIPE FLANGE
200 NB Sleeve Coupling
150 NB Sleeve Coupling
125 NB Sleeve Coupling
100 NB Sleeve Coupling
80 NB Sleeve Coupling
125NB * 45 degree DRC Y letaral
150NB * 45 degree DRC Y letaral
150 NB Alloy CI Equal Tee
125 -100 NB Alloy Unequal Tee
125 NB DRC 45 Degree Bend
80 NB 90 DEG BEND
Lubrication

También podría gustarte