01
A V A N C E
MES 01
N
Dias
MES 02
30
60
OBRAS PROVISIONALES
27.00
3,129.00
OBRAS PRELIMINARES
12.00
2,589.03
MOVIMIENTO DE TIERRAS
###
24.00
19,249.69
9,523.42
17.00
13,606.12
77,060.74
46,226.60
42.00
154,112.64
ALBAILERIA
1,438.10
21.00
7,190.53
10,516.70
24.00
17,527.54
PISOS Y PAVIMENTOS
21,576.72
17.00
30,823.78
1,091.31
09
ZOCALOS Y CONTRAZOCALOS
15.00
10
18.00
2,546.54
3,637.85
797.05
3,188.21
3,985.26
88.40
11
S/.
1,294.51
9,247.06
08
TOTAL
S/.
287,367.39
7,010.84
07
SUB TOTAL
100.00
5,752.43
06
90
914.50
30,825.30
05
61
GENERAL
4,082.70
04
Mes 03
31
5,775.00
03
V A L O R I Z A D O
1,294.52
02
O B R A
2,114.50
01
D E
ACTIVIDAD
ITEM
D E
CERRAJERIA
353.61
10.00
442.01
5,155.30
12
PINTURA
15.00
5,155.30
4,376.01
13
VIDRIOS Y CRISTALES
15.00
4,376.01
635.87
14
6.00
635.87
2598.00
15
INSTALACIONES SANITARIAS
1732.02
16.00
4,330.02
4309.14
16
INSTALACIONES ELECTRICAS
18.00
14,823.02
362.98
17
10513.88
362.98
1027.76
1.00
LIMPIEZA DE OBRA
1,753.72
19.00 %
9,713.42
29,175.23
23,901.13
287,367.39
28,736.74
14,368.37
330,472.50
62,789.78
S/.
60,836.67
182,729.06
149,696.55
393,262.28
S/.
60,836.67
243,565.73
393,262.28
(%)
15.47
46.46
38.07
(%)
15.47
61.93
100.00
10.00 %
5.00 %
SUB TOTAL
I.G.V.
44,455.00
133,525.07
109,387.32
4,445.50
13,352.51
10,938.73
2,222.75
6,676.25
5,469.37
51,123.25
153,553.83
125,795.42
Son : TRESCIENTOS NOVENTA Y TRES MIL DOSCIENTOS SESENTA Y DOS CON 28/100 NUEVOS SOLES