The company COINCOVAL-BECSA, is a company founded in 2007 by:


COINCOVAL, S.A.

BECSA, S.A.

The main object of this society its for the general construction of all types
of civil engineering and residential building.
Our company philosophy is the give the customer a wide range of solutions, so
he choose that best suits your idea, so we have commercial alliances with various companies throughout the world, and thus be able to respond effectively and
quickly to the different needs of our customers in each area.

PRESENTATION

Introduction. History
COINCOVAL-BECSA is the result of the application of a consolidation strategy of several departments, having different activities, united for a common aim: the construction,
with the objective to give to the client the maximum satisfaction in all aspects: studies,
planning, price, quality, service, delays, etc. Its existence over time followed the following
chronology:
- Department Plumbing & Drainage Installation was deployed in 2000 as a department
specializing in hydraulics and plumbing in the construction field, both as a civil building.

- Department Electrical & Air Conditioning was deployed in 2002, specializes in electrical installations, air conditioning and home automation in new housing, industries, hotels, etc., in 2004, she has definitely broadened its scope by diversifying into two distinct areas, the electrification and automation on one side, and air conditioning/cooling
and maintenance of the other reviewers.
Department Building Engineering was deployed in 2003 as a construction department
specializing in large projects and work, both residential as non-residential, characterized by their magnitude and complexity.
-

- Department Metal Work & Glazing was deployed in 2000, dedicated to all types of
facades, structures, curtain walls, metal coatings, glass and special facades.
The importance given by COINCOVAL-BECSA to Human Capital is very huge. We
have a large team of people with high decision-making capacity, technical knowledge
and experience.
Design of the strategic plan
The design of the strategic plan COINCOVAL-BECSA consists of following steps:

The concept of organization


The nature of its activities.
The reason of its existence.
The group she serves.
Its principles and core values.

Areas of Business, Projects

Engineering
A great technical multidisciplinary team favors that all the studies and budgets that we
make are perfectly adjusted to the needs of the client. We have a policy of continuous of
our technicians in the latest novelties in the fields of engineering and architecture. The
influence of the Group in all the fields related to the construction facilitates the interaction
of the different techniques and methodologies applicable to the construction, which turns
the technical team of COINCOVAL-BECSA into Leader and Technological Associate in
the works contracted with our clients.

Construction
The trading area of construction and real estate development is represented by COINCOVAL-BECSA, which integrally realizes all services related to the construction. It was
created as an answer to the market need of an integral service, with high professional capacity, and a strict control of quality, prices and delays. It was the result of the consolidation of the efforts of its founders and collaborators and their large experience in the construction sector.
COINCOVAL-BECSA is a company, which however has a solid experience, then a
great part of its professionals have more than 20 years of occupational activity. This allows us to be agile and flexible, but at the same time to be solid and rigorous as the more
veteran companies. However, as our critical mass is smaller, we need less response time

to answer the requests of our clients.

Industrial
The trading area of industrial automation studies designs and installs industrial automation systems, which control the heating, air conditioned, alarm, light, blinds, awnings, etc.,
with the most recent technology. All these installations are able to control absolutely all
the systems by cellular phone, if needed, and with a program that allows the most efficient energy utilization, and consequently important energy savings and an improvement
of environmental protection.
The industrial automation system described below is designed for the control of building, either of offices and hotels or private houses. It integrates the lighting, air conditioning, engines of blinds and curtains, presence and access controls, monitoring and control
from a central control point, etc. All these functions are perfectly coordinated and managed in order to obtain the best rates of comfort, energy saving and safety in the building
or house.

Areas of Business, Installations

Air Conditionning. Maintenance and service


The trading area of air conditioning was created with a clear technological and ecological ideology, realising an integral management and control of the installations and services in the aim of controlling and giving comfort and welfare. We opt for the achievement
of the proposed objectives with an unavoidable premise, the environmental protection,
and so our air conditioning systems are based on new technologies and ecological gases.
The products we install are manufactured by the most important manufacturers in the
world, the controls and automatisms are of latest generation, and allow an important reduction of the air conditioning costs.
COINCOVAL-BECSA in the field of Maintenance and Management Services has a
primary objective: to achieve the minimum cost and maximum safety possible for staff,
the minimum environmental disturbance, the proper use and operation of equipment and
facilities for clients who have placed their trust.

Electrical installations
The trading area of electrical installations is composed of several areas, which can
make all types of works, as follows:

Electricity
Public lighting.
Connections of low and medium voltage.
Bypasses in low and medium voltage.
Electric transformers.
Switchboards.
Industrial buildings.
Domestic electrification.
Protection against lighting strokes.
Water treatment plants.
Desalination plants.
Control and automatisms.
Purifying plants.
Traffic tunnels.
Water pumping.
Water management.

Areas of Business, Installations

Hydraulic installations. Wastewater treatment and sanitation


The trading area of hydraulic installation is dedicated to the realization of hydraulic
and fire-fighting installations, either in civil works or building. One of our specializations in
civil works is the setting up of all kind of polyethylene pipes. We are certified by the Department of Industry, and are in compliance with all the requirements of the certification
for this type of installations.
Is divided into two large areas:

Civil works
Hydraulic installations of general potable water network.
Water pumping.
Impulses.
Purifying plants.
Juntions.
Changes in networks.
Valves.
Industrial parks.
Distribution to communities.
Irrigation unions.

Buildings
Plumbing and drainage installations.
Fire-fighting installations.
Real estate developments.
Repairs.

In this department, the main activity is focused in the construction, operation,


maintenance and plant maintenance treatment of wastewater and sanitation.
We have developed new areas of work:
Engineering, implementation of hydraulic works and outfalls.
Operation of ater supply stations and water treatment.
Waste management and recovery of bio solids in agriculture.
Studies and Research, Development and Innovation (R+D+I), in collaboration
institutions.
Installation work of simultaneous of electricity and thermal use of biogas.

10

11

Human Resources. Quality and Environment

There are three basic lines of action, on which policy is, based COINCOVAL- BECSA
RRHH:

Prevention of Occupational Risks.


Incorporation of new staff.
Training, adaptation and development.

The consolidation of these three areas has led to the creation of a large multidisciplinary team with wide measure of discretion, expertise and experience, able to provide the
best customer service, and to generate and manage numerous business areas effectively and thoroughly.
Of the three basic axes emerge the following pillars of our corporate culture:

Recruitment, retention and motivation of talented people.


Suport and enhance the transfer of training and learning.
The implementation of teamwork and quality control as tolos to promote excellence in a job well done.
Enhance the personal qualitites of our employees regarding skills, assertiveness, empathy and proactivity.
The development of the rejection of the routine, exercise discipline in
the execution of the work and safety control and exercise leadership
and to protect and respect the group.

COINCOVAL-BECSA, promotes the generation of opportunities for employees, along


that detect and enhance personal skills of the same, with the ultimate aim of retaining the
best professionals.
One of the objectives of the Mission, its employees and business partners of the
same, is to obtain high levels of occupational health and safety and strict adherence to
the LPRL (Spanish Law of Prevention and Safety at work).
Our prevention policy is thus based on the following principles:
Integration Principle of preventive action in all positions.
Compliance with laws and regulations in force concerning the Prevention of
Occupational Risks.
Training of all employees in prevention, developing their human and professional potential.
Periodic compliance reviews of occupational healt.
Study and analysis of the risks of each job and its prevention.
A detailed study of risks in each of our works, by the appropriate Plan of
Work Safety.

12

As a result, they leave nothing to chance, we get involved to be more effective, we learn
and we formed, thereby achieving more aware and more competent in the prevention of
occupational hazards. A deep involvement with business partners, promotes an extreme
coordination with them in the field of prevention of occupational hazards.
The consequence of this is to achieve a strong, trained and sensitized on prevention
team work.
For this reason, COINCOVAL-BECSA, based his performance as a strategic plan, one
of whose pillars is the Social Responsibility to be a fundamental aspect underpinning this
pillar of respect for the environment. Therefore, inculcate values and behaviors that respect the environment, teaching and showing good environmental practices in each and
every one of those members of the Group in the activities of the different areas of the
business. To implement these principles, management is proposed as MISSION:

Take the necessary steps to prevent pollution and, when this is not possible,
to minimize emissions.

Systematically reduce waste by recycling wherever possible, and make efficient use of natural resources, raw materials and energy.

Take all necessary measures to ensure compliance with all environmental


regulations applicable to our activities at State level and Local Autonomy
and any requirement that the group subscribes in the future.

To establish procedures for periodic review of compliance with environmental policy and the implementation of corrective measures before any breaches detected.

Define and regularly review environmental objectives and targets established in compliance with this environmental policy, in the process of continuous improvement of our performance with respect to the environment.

Disseminate environmental policy among employees, suppliers, subcontractors and other stakeholders.

13

Projects

HOTEL ATRIUM BEACH Villajoyosa (Alicante)


DESCRIPTION:
Project symbolic of the first order because it is the largest hotel in Europe at the forefront of beach, with 1470 rooms, and unique thanks to its fun zones as the walk of stars,
restaurants, shops, themed areas , area lakes, lazy river, swimming pool with waves, etc.
Built on a plot of 28,000 m2 with 10,000 m2 of slab foundation, 2 basements (on the second at 9 m below sea level), a ground floor and 19 floors for a total of 120,000 m 2 construction. Management and Construction of all work. Execution of all masonry (900 of
1470 rooms have been made) and we are awaiting the resumption of work to finish this
contract once again obtained the permit modification by the owner. Work done in record
time, excavation and foundations in 3 months (in solving problems pumping nearly
3,000,000 litters / day), the structure was completed in 10 months, we worked 24 hours a
day permanently until early last summer.

BUILDING ATRIUM PLAZA Benidorm (Alicante)


DESCRIPTION:
Project 80 apartments, ground floor commercial and two basements, the second at 12
m. under the sidewalk, made with screen walls and lattice structure with forged and
shaped fan. Total of 8 floors with a total of 15,000 m 2 of construction. Engineering Management and Construction of the full work. Running the entire site in "turnkey". The work
was done on time.

BUILDING MESANA Altea (Alicante)


DESCRIPTION:
Draft of 63 apartments, front line beach. Total of 8 floors with a total of 15,000 m 2 of
construction.
Rebuilding and strengthening the original structure. Execution of all masonry work, installation and finishing. The site was done on schedule and is currently completing.

14

15

Projects

PARQUER WARNER San Martn de la Vega (Madrid)


DESCRIPTION:
Draft comprehensive reform paths inside the park, including areas with new gardens
and new access to attractions. Construction Events Centre and the new attraction
Scooby Doo. Technical Management and Construction of all work. Execution of all work.
The work was done in record time, by performing any internal reform in 2 months and the
construction of the Events Centre with all facilities (kitchen, air conditioning, fire protection, plumbing and electricity) and the attraction Scooby Doo in 3 months.

SPA BLANCAFORT La Garriga (Barcelona)


DESCRIPTION:
Draft comprehensive reform of the resort centre, including with new electrical, plumbing and air conditioning.
Technical Management and Construction of all work. Execution of all facilities as a
"turnkey".
The work was done by providing the technical means (foreman and manager) to coordinate industrial and business plumbing, electricity and air conditioning.

CONECTION FUENTE LIVIANA Huerta del Marquesado (Cuenca)


DESCRIPTION:
Pipe two new sources to the bottling plant Fuente Liviana
Technical Management and Construction of all work.
Execution of all work.
The work connected issuer made on schedule, facilities were given to the owner

16

17

Other Projects

In these projects our technicians have participated in several fields, either directing the
project or working on it.

Viaducts of the Madrid


Valencia road

18

Viaducts of the Madrid


Valencia road

19

Other Projects

Viaducts of the Madrid


Valencia road

20

Valencia
Alicante road

Tunnels of the Madrid


Valencia road

21

22

Introduction. History

The Engineering Department was founded in 2003 and is currently the head of
the COINCOVAL-BECSA construction. In his long business career, the group
has performed a multitude of infrastructure in ports, airports, hospitals, roads,
waterworks and many other areas that prove their creditworthiness and experience in the construction sector.
At present, we are oriented towards total customer satisfaction, both public
and private, and commitment to represent the pillars of society that is based on
daily work in our company.
We have developed I+D+I to be at the forefront of technical developments in
the sector without forgetting to minimize the environmental impact that our business generates. Finally, there is always a strong commitment to local employment at any spot where we are developing our business.

Areas of business
The Engineering Department has extensive experience in the field of Public
Works, with large built infrastructure such as airports, hospitals, universities,
ports, roads, car parks and sewage, among others.
With regard to private work, the Engineering Department is specialized in the
development of housing and residential construction, commercial and leisure
centers, hotels, industrial buildings and large private estates.

23

Projects: Public Work. Buildings

gora, City of the Arts and the Sciences (Valencia)


Budget: 41.991.417 - UTE Becsa, Rover Alcisa y CyEs.
Termination: Year 2010
Description: The Agora is a plant covered surface 4.800m 2 elliptical, being used in its
construction more than 7.000 tons of structural steel. The fixed cover reaches a maximum height of 70m and 85m above ground level with open umbrellas. The structure is
formed by pointed metal frames of different sizes; they create a domed interior of variable
height. At the top of the deck have two mobile structures lamas. The project has been
drafted by D. Santiago Calatrava and his team.

Party Palace (Castelln)


Budget: 17.652.520
Termination: Year 2011
Description: The Palau de la Festa is located on a plot of approximately 15.000m 2, of
which the oval-shaped building occupies 2.800 m2 and four plants in a total built area of
5.800 m2.
The structure is forged nerve reticular interval between 12 and 80 cm. The roofs of the
hall and the stage are of sheet metal on metal trusses, the rest of shells are inverted not
passable. The facade is ventilated with colourful ceramic pieces, and the main facade
built with ceramic blades that make the role of the curtain wall hood

New Hospital La Fe (Valencia)


Budget: 216.263.000 - UTE Becsa, Dragados, ACS y Edificaciones Ferrando.
Termination: Year 2011
Description: In the main building there are three common plants: the basement, the
ground floor and the first floor, where are most central services. On these plants are
raised six towers, four of them for hospitalization and two for External Consultation. This
horizontal design will allow physicians and patients to share and manage resources better. The four towers of hospitalization have all the single rooms and some 180 offices.
While the two towers have 195 rooms, External Consultation and 116 local special examinations.

24

25

Projects: Public Work. Buildings

Regional hospital de La Plana (Castelln)


Budget: 21.614.800 - UTE Becsa, Dragados, y Torrescmara.
Termination: 2003
Description: Complete construction of a building of 24.000 m 2, with capacity for 180
beds, urbanization and construction of the exterior surface parking

Auditorium, University Jaume I (Castelln)


Budget: 19.300.000
Termination: 2009
Description: The structure consists of concrete walls 50 cm thick with 10 cm insulation in
the center. Due to the considerable height of the building, its performance has been used
type climbing formwork. The room is completed with the installation of 658 seats and a
stage which consists of three levels of galleries, comb and contrapeine. The ventilated
faade is Lammax type of Saloni, both of the stage and the room using 3x1 m parts in
black. Deputy Auditorium was built module toilets with combined curtain wall facade of
glass and white compact material

Building Espaitec, University Jaume I (Castelln)


Budget: 12.206.171
Termination: 2009
Description: 1.937 m2 building comprising basement aimed to facilities, ground and first
floor, which houses offices and workshops. Made of solid concrete walls and floor tile
views and hollow core slabs. In the building there are two types of cover, an inverted end
in gravel and the other with photovoltaic glass. The facades are solid concrete walls with
expanded polystyrene in the center which makes the function of isolation. Movinord prefabricated partition type interior, floor tiles and aluminum frames.

26

27

Projects: Public Work. Urbanization

Link Enrique Gimeno av. with Round South (Castelln)


Budget: 4.266.170
Termination: 2009
Description: Implementation of Link Av. Enrique Gimeno with Ronda Sur, preserving the
current route and executing a roundabout with an inner radius and outer 54m of 69.1 m,
and three lanes of 4.20 m at the level of Avenue which runs perpendicular to the slope
and round. The work is complemented by two bridges structure, consisting of a board of
31 and 26.8 m respectively and a single span of 25m both. For the construction of these
bridges has been used a total of 48 isostatic precast beams of 0.90 m deep 4.2 m apart
and connected by a slab of compression of 0.25 m.

Line 2 of the streetcar, section 0 (Alicante)


Budget: 9.204.067 - UTE Becsa, Tecsa y CHM
Termination: 2011
Description: The works provide for the construction of the section 0 of the tram line 2 of
Alicante, from its junction with line 1 (PK 0 +000) to the square of the source Pl Boulevard. Construction of a double track tramway platform, with two-way path almost parallel
in plan and elevation, except the first few meters of the system linking with Line 1. Despite being a stretch of not too long, the work includes the construction of various structures along its route: Salto del Carnero viaduct, underpass, and manifold mating Bon
Hivern.

Urbanitation Benicalap Sur (Valencia)


Budget: 6.011.671
Termination: 2004
Description: The lands are located north of the city of Valencia, next to Benicalap neighborhood, between two historic axes are the way of Moncada and Burjassot. The surface
of the development is close to a preferential use 200.000m 2 residential flats. The distribution of surfaces is as follows: Plots for residential use: 55.342m 2; plots of commercial use:
5.472m2; Plots for school use: 21.987m2; Green Zone: 25.549m2; other facilities:
23.100m2; road surface: 64.139m2.

28

29

Projects: Public Work. Highway

Structural rehabilitation of firm Highway A-3 (Valencia)


Budget: 7.045.926 - UTE Becsa y Rafael Morales
Termination: 2008
Description: The work consists of rehabilitation of the pavement over a length of 21km,
including the completion of a groove and the replacement of the current layer of tread is
worn to correct structural deficiencies in the firm and the surface deformations with an
average depth of 6 cm and a hot asphalt mix type S-20. Finally we proceeded to extend
an M-10 type mixed across the width of the roadway and its shoulders and wearing
course, 3 cm thick.

Reinforcement of road surface of the road N-340 (Tarragona)


Budget: 5.390.739
Termination: 2008
Description: The milling was conducted at a depth of 12cm thick medium and replacement with the application of an asphalt mix type s-20 with conventional bitumen 40/50.
The most degraded areas were milling is 30cm thick and the replacement was made with
a special asphalt mix called high modulus (Mam) to have a dynamic modulus greater
than 10,000 km and thus be able to withstand much more burden than a bituminous mixture conventional.

Variant of the road CV-128 in Cat (Castelln)


Budget: 2.500.000
Termination: 2008
Description: It has built a new track variant for the southern part of the population,
3.017m in length, connecting with the existing road illuminated by two roundabouts and
building radio 17m eight works of art, made of concrete frames to save roads and ravines
that cross the new layout. They have enabled two new accesses to the population since
the variant through an underpass and roundabout game. The new road has a width of
9m.

30

31

Projects: Public Work. Maritimes

New fishing industrial zone Vinaroz Port (Castelln)


Budget: 10.974.648 - UTE Becsa, Joca Ingeniera y Construcciones y Sixconstructor
Termination: In execution
Description: Construction of different areas for the location of facilities such as the new
auction, mooring docks, and roads of interior spaces for sports and industrial activities.
Implementation of the dyke of the future industrial zone and the new sports area and
general construction services to provide new facilities for urban services necessary for
their operation, according to the provisions of the Plan of Use of Space Port.

Extension Castelln's Port (Castelln)


Budget: 51.050.459 - UTE Becsa y Fcc
Termination: 2004
Description: Making a yard on Hill of 320.000m2 +1.5 delimited by a vertical breakwater
by floating caissons 33.75 m in length and 19.6 m wide. Also dredging was conducted
with a 3.115 million m3 entry.

Platform for containers in the Port (Castelln)


Budget: 29.357.982 - UTE Becsa y Fcc
Termination: 2005
Description: Construction of a quay length of 410mm and 14 drafts, and a Ro-Ro berth.
Esplanade for collection of containers and general merchandise of 120,000 m 2, based on
a dredge and fill of 1,300,000 m3 of concrete and asphalt pavements, offices, workshop
and warehouse. Foundations and ways Portain Panamax cranes, with the entire necessary infrastructure.

32

33

Projects: Public Work. Airports

Aircraft parking platform Base Area de los Llanos (Albacete)


Budget: 1.357.996 - UTE Becsa y Rafael Morales
Termination: 2004
Description: Execution of the construction of two concrete platforms 180x100m HP-45
for aircraft parking. This work was included in the reforms being made in Los Llanos Air
Base motivated by the same choice as the venue for special training for NATO pilots
(Tactical Leadership Program, TLP).
The work consisted of leveling the cash fund, graded aggregates and a concrete slab 30
cm. thick. In addition, drainage of the platform with two troughs of 200m in length and
50cm wide.

New Airport AZAHAR Coast (Castelln)


Budget: 109.239.692 - UTE Besca y Fcc
Termination: 2009
Description: Airport facilities consisting of a runway of 2.700 m in length, category I, 4D
key (B-757 aircraft), upgradeable to 4.000 m, aircraft parking platform for 55.000 m 2 passenger terminal, control tower, building for Fire Fighting Service with all necessary facilities for fire, power plant, cargo terminal, airfield, handling, wastewater treatment plant.,
emitting center, parking, both for private cars to taxis and buses.

Passengers' terminus of the new airport AZAHAR Coast (Castelln)


Budget: 12.000.000 - UTE Becsa y Fcc
Termination: 2009

34

35

Projects: Public Work. Environment

Waste water station, Font de la Pedra (Alicante)


Budget: 13.666.468
Termination: 2004
Description: This facility has a maximum treatment capacity of 20.000 m 3/day and covers an area of 27.775 m2.

EDAR de Vinaroz (Castelln)


Budget: 10.858.568
Termination: 2007
Description: Sewage station, the main sewage pumping and interconnection between
the outfall and Vinaroz EDAR. The works consisted in the construction of a pumping station of dirty water, mains sewage discharge from the intermediate pump station, main
drive to the EDAR, wastewater treatment plant and collector, by gravity, until the connection with the outfall. Use of curtain wall and cladding facade. Finish line with the corporate
image of the brand.

Arrangement of the Coastal Front LArbre del Gos


Pinedo (Valencia)
Budget: 9.642.476 - UTE Becsa y Mediterrneo Servicios Marinos
Termination: 2007
Description: The process provided for beach reclamation consists of healthy, regularization of the beach, lifting the front elevation and removal of current expense to allow dry
beach a distance of about 65m from the present coastline. Regeneration of the dunes
has been designed by a string of transverse dunes, artificial. The core of dunes formed
and shaped through the transfer of dredged sand, and dune fixation is performed by a
network of "bardissas" consisting of kneeling dry reed (Arundo Drax) thread link between rods on which floor.

36

37

Projects: Public Work. Parkings

Parking Regional Hospital II (Castelln)


Budget: 10.800.000
Termination: 2010
Description: Gran Va underground parking and ground Trrega Monteblanco Provincial
Hospital. It covers a small area of outdoor parking, main entrance, emergency entrance ...
Capacity 909 seats in three basements. It has two ramps and two exit ramps. The surface area is 7.601m2. Its shape in plan is an irregular polygon of 57ml 126ml long and
wide, and an external ramp 29'7ml x 6ml wide. Within the work performed included the
development of both the garden surface inside the Provincial Hospital and the Gran Va
Trrega and Dr. Clara.

Parking of the Trade fair (Albacete)


Budget: 6.296.490
Termination: 2009
Description: This car park will have a total surface
22892.58 m2, and have a capacity of 422 cars to be parked on two floors. As has become
customary at present the parking will be mixed system, as available in the system
squares and plazas hourly rate for residents of the area. It will also have large squares
whose minimum size will be 240cm x 475cm, complemented by innovative facilities and
have four pedestrian accesses and two elevators suitable access.

Parking Chile Aragn (Valencia)


Budget: 12.000.000
Termination: 2009
Description: The new street parking Chile is located 300 meters from the Mestalla football field. Parking is mixed for both the rotation and to use by residents, and has a capacity of 531 beds in two floors and a total area 14 500 m2.

38

39

Projects: Private Work: Residential

Residential buildings Benicalap Norte (Valencia)


Budget: 16.340.550
Termination: 2009
Description: The work consists of 157 houses, plant offices, shops and a basement in a
construction area of 19.318,85 m2.
This is in a basement for parking spaces consisting of 194 parking spaces and 143 storage rooms, two apartment buildings (one with three doorways comprising ground floor
plus four heights and another with five doorways floor consists of more eight heights, in
which the first floor is for offices) and plants available for commercial premises.

Residential buildings Mariposa Warsaw (Poland)


Termination: In execution
Description: Building with 105 apartments with surfaces varied from 26 to 103 m 2. Polish
Architects architectural renown ARE, directed by Jakub Waclawek have designed this
modern building, distinguished by their pure forms and simple facades.
The cozy space will stand out for their perfect finish for all common elements. On the
ground floor premises will be built and commercial services.

Residential buildings Ciudad Norte Campanar (Valencia)


Budget: 37.134.841
Termination: 2007
Description: Five blocks of 15 floors, designed to ensure a wide variety of types and the
best views and guidelines of the houses, to maximize natural light. It consists of a landscaped area that integrates the common recreation areas. Homes 2-4 bedrooms.

40

41

Projects: Leisure and trade

Comercial mall El Corte Ingls (Castelln)


Budget: 12.354.476 - UTE Lubasa y Fcc
Termination: 2006
Description: Construction of the lands formerly occupied by the tracks and train station.
Construction of a boulevard of 3.080 m long and 30 m wide, resolving intersections with
the perpendicular streets through 7 roundabouts and squares. Extension of Paseo Ribalta, rebuilding and restoring the old fencing on the station. Construction of 8.000 m 2 of
places in the environment of the new shopping center El Corte Ingls.

Comercial mall Puerto Azahar (Castelln)


Budget: 13.943.481
Termination: 2003
Description: Construction of a leisure center in port land which, being adjacent to the urban area, the Port Authority has changed its use to integrate them into the city. It has a
constructed area of 7.300m2 in two unique buildings, glass curtain wall finishes and
porcelain tile ventilated facade. Movie house ten rooms, rooms for commercial uses, bars,
restaurants, pubs, playgrounds, etc. In the underground and below sea level in an area of
13.500 m2, has built 525 parking spaces.

Hotel NH Puerto Sagunto (Valencia)


Budget: 4.299.402
Termination: 2007
Description: Building of 100 rooms hotel, sponsored by the Investment Property Concrete, and exploitation of the property leased to the chain NH Hoteles.
Initially the project had a 3-star hotel and finally, thanks to improvements and modifications made during execution has been granted the rating of 4 stars. The building comprises a basement, ground floor, four floors of hotel and housing.

42

43

Projects: Private Work: Industrial Building

Multimark automotion building (Castelln)


Budget: 13.056.000
Termination: 2006
Description: Building for industrial use for car dealers, workshops and garage. It is built
on a plot of 9.500m2, consists of two basements, ground floor and two floors. The total
constructed area of 27.000m2. The building is constructed using precast concrete structure. The facades are made with ventilated curtain wall and facade panels and aluminium
composite. The cover serves as a parking lot, so it serves as the waterproofing layer
made for vehicles rolling.

Office building Intercoop Almazora (Castelln)


Budget: 1.565.528
Termination: 2008
Description: The works consisted of conducting a headquarters.
Intercoop group offices with 990 m2 of floor space in a plant, which has a working area of
400m2, offices, meeting rooms, a classroom, conference room, the Regents, a vending
area and two patios interiors. The structure is being mixed metal pillars and concrete oneway slab with beams hung upside down, the roof is flat, and the facade combines a fully
glazed facade with a thermo cladding, coated with monolayer. Outside you will find the
parking and gardens.

Office building LUBASA (Castelln)


Budget: 26.000.000
Termination: 2006
Description: It has a constructed area of 26.940 m2, distributed over 14.680 m2 for offices in basement and three floors, and 12.260 m 2 in a basement with 450 parking spaces.
The facade consists of a combination of self-supporting glass curtain wall and facade
ventilated Saloni porcelain. In the office area 9.000 m 2 have been installed under the
technical pavement which runs the electrical, voice and data. The interior lighting is automatically adjusted each time according to natural light.

44

45

Exploitation and Installations

ORIGIN is the common name for the different areas of business which operate Area Construction Materials COINCOVAL-BECSA. Our company manages the production of major
raw materials applicable to their entire construction and management of construction
waste and demolition.
Origin, with over 30 years experience, began his career in the mining sector, particularly in the mining and processing of aggregate in the town of Castellon, then expand and
diversify production to other facilities and other activities, creating:
ORIGIN AGGREGATES consists of various companies engaged in the manufacture
and marketing of aggregates. It currently has six farms, among themselves and participated in the provinces of Castelln, Valencia, Alicante and Teruel. The total production
amounts to 4.5000.000 ORIGIN AGGREGATES T / year.
The first operation that was created is that of Castelln (the Turret Quarry, SAU). It currently has a workforce of about 40 professionals and a production of 2 MM Tons / year. In
1991 began the great expansion of facilities ORIGIN AGGREGATES with two new production facilities, the Turret Quarry in Santa Magdalena de Pulpis (Castelln) and Aggregates Ibaez Andreu in Alcaiz (Teruel).
From 2002, ORIGIN participates Aggregates Monte Conto in Pinoso (Alicante). In
2003, Aggregates Sierra Gorda is acquired in Xativa (Valencia) and finally in 2005,
Gravas y Derivados de Castilla La Mancha (Albacete).
ORIGIN CONCRETE is dedicated to the manufacture of concrete, with six plants in the
provinces of Castelln and Teruel, with a total production of 490.000 m 3/year and about
50 employees in total. The oldest plant is Castelln, created in the 70s, from which time
has been responsible for supplying the province of this material without interruption. Behind her, other plants were established as the Grau de Castell (in the Year 2004) or the
adjoining population Almazora. Since 2006, ORIGIN CONCRETE began to exploit Alcocebre plants, Benicarlo and Alcaiz, which had previously been involved.
Currently plants Castelln, Castelln Grao, Alcocebre, Benicarlo and Alcaniz, working
under the brand name and plant Hormasa Almazora as a Concrete Mijares (successor of
Concretes Mijares was bought by ORIGIN CONCRETE in 2006).
Our concrete companies known for their expertise, preparation, professionalism and
experience, possessing Quality Certificates "CV-N BRAND CONCRETE" to prove it.

46

47

Exploitation and Installations

ORIGIN MORTAR is dedicated to the manufacture of dry mortar, reaching an annual production of 220,000 tons.
The supply of the mortar is made by tanker trucks which transported separately raw
materials that make up the mortar. When it comes to work, the materials are discharged
into a silo, owned by FROM MORTARS, keeping the materials separate and at the stage
of transport. The silo is equipped with a discharge system that performs raw material dosing and mixing of materials and water, in quantity, to make the mortar used in the works.
This system is known commercially as TECMIX and was developed by ORIGIN in the
early 90s. The burden of raw materials in the tanks is done in modern facilities with important environmental protection measures.
CEMENT ORIGIN is dedicated to the manufacture of cement in its different phases.
At the beginning of year 2009, was launched a clinker grinding plant and cement manufacturing in the Grau de Castelln.
The ground clinker grinding and cement manufacturing is located on an area of 30,000
m2 and located only 300m from the pier bulk of the South Basin of the Port of Castelln.
This is a modern, completely organic and in compliance with all legal requirements, assisted by a laboratory quality own self.
Investing in it is 40 million and consists of a team of 44 people.
The COINCOVAL-BECSA asphalts business has five manufacturing plants spread asphalt agglomerate along the Mediterranean coast. In particular we have two plants in the
province of Castelln, one in the province of Tarragona, a province of Valencia and one in
Albacete province, with an average production capacity of 220 tons / hour each.
The manufacture of asphalt agglomerate is one of the more established businesses to
COINCOVAL-BECSA with an experience of over 35 years and has since been one of the
leading companies in manufacturing, research and development of new asphalt.
In the Year 2008 with the entry into force of the CE of asphalt mixtures, COINCOVALBECSA was the company most mixtures included in the initial certification of the marking
in the entire national territory, which shows the constant concern of our company by improving continuing in our processes.

48

49

Laboratories

Laboratories
COINCOVAL-BECSA currently has three laboratories dedicated to self through the finished product analytical and technical assistance work for remedies work and research
and development of new products or alternative solutions to existing ones. These laboratories are:
Lab 1. Concrete, mortar and aggregates
Lab 2. Agglomerate and asphalt
Lab 3. Cement
COINCOVAL-BECSA laboratories have been recognized for its quality and actively
participation in the System of Innovation Management to get together with other departments of the certificate UNE 166.002.
The laboratory service is basically:
Self-production of building materials through the analysis of final and intermediate
products of the process, according to the particular needs of each production center.
Self-Monitoring of the final products, in accordance with the requirements of existing
legislation and regulations required its own distinctive quality of volunteers. Management
and documentation of such monitoring organizations reported (CE) and certification
(other products).
Technical assistance in terms of formulation for the manufacture of products, together
with production centers responsible for their own research studies and even in collaboration with clients.
Participation in committees as certification authorities.

50

Laboratories

51

Management System I+D+I

Management System I+D+I


Today innovation is not limited only to the development and implementation of new
technologies. It is a comprehensive strategy that can be included in all key organizational
processes: in the company's relationship with the market, customer management / distribution channels, management of resources, etc.
For a company to be considered innovative must have a strategy oriented to innovation, able to create value by providing new ideas to market and have an internal organization to the innovation process to manage the knowledge and skills of employees and encourage their creativity.
The requirement of new buildings and infrastructure, evolving and high technology
component, as well as compete in the bidding for works of nationally and internationally in
the best conditions, the company have been put in place a system Management R & D &
I Construction Area based on the standard UNE 166.002.
On an annual basis, COINCOVAL-BECSA held at its facilities in Castelln the Annual
Professional Conference I+D+I, which is evident from this companys commitment to innovation.
During the same, the company will direct customers showing their ability to provide innovative solutions to each of the technical problems that appear in projects and works
this day has become a professional forum in which to exchange ideas, knowledge and
experiences, between government agencies and companies in the construction sector.
This is where specialists presented COINCOVAL-BECSA projects implemented during
the previous year, which have been certified by his brilliant quality and innovation.

52

Partnership Projects

We introduce several important projects executed with some of our partners. They usually work with us, contributing with technology and know-how by creating a synergy that
allows us to face great challenges.
Some typologies of these projects range:

private edification buildings

Urban planning

Administrative buildings

Hotels

Purchase center

Airports

Hospitals

Exhibition centers

Car parks

Roadways / Highways

Tunnels

Bridges

Dams and hydropower stations

Harbor

High speed railway

Coastal works

Most of them require large technological and human resources.

53

Hospital

Hospital La Fe - Valencia

54

55

Comercial Hall

56

57

Coast Works

Shoreline Pinedo - Saler

58

Littoral regeneration in T.M. Marzarn Island - Murcia

59

Harbor Works

Works in Valencias dock 32nd Americans Cup

60

Works in Valencias dock 32nd Americans Cup

61

Harbor Works

Benicarlos harbor extension

62

Sanitation and Purification

Purification works in Canet de Berenguer and LAlmarda - Valencia

63

Draining Works

Works in the general pluvial drainpipes in Almazora - Castelln

64

Works in the general pluvial drainpipes in Almazora - Castelln

Complementary Works

65

Dams and swamp works

66

67

Railway

Integration line 1 Valencia underground

68

Kayseri northern railway construction works

69

Railway

Coordination and construction of high speed railway contracts

70

High speed line Madrid Galicia Section Zamora

71

Railway Tunnel

North northwest high speed corridor section Madrid Segovia

72

Refinery Pipeline Works

When a pipeline is built, the construction project not only covers the civil work to
lay the pipeline and build the pump/compressor stations, it also has to cover all the
work related to the installation of the field devices that will support remote operation.
The pipeline is routed along what is known as a 'right of way'. Pipelines are generally built using the following stages:

Route (right of way) Selection

Surveying the route

Clearing the route

Trenching - Main Route and Crossings (roads, rail, other pipes, etc.)

Installing the pipe

Installing valves, intersections, etc.

Covering the pipe and trench

We have worked in the construction on the spanish pipeline system. In some of


most relevant stations in Spain are the following:

Tenerife

Cartagena

Castellon

Puertollano

A Corua

Algeciras

Tarragona

73

Refinery Pipeline Works

74

75

Refinery Pipeline Works

76

77

Refinery Pipeline Works

78

Civil Work Construction

79

Civil Work Construction

80

81

Civil Work Construction

A28 motorway - Portugal

82

A28 motorway - Portugal

83

Civil Work Construction

Mudejar highway A23 motorway - Aragon

84

Cartagena - Vera motorway - Murcia

85

Civil Work Construction

Cartagena - Vera motorway - Murcia

86

A3 Madrid Valencia highway

87

Civil Work Construction

Vitoria Eibar motorway

88

A3 Madrid Valencia highway

89

Cars Parks

Hospital 12 October - Madrid

90

Hospital 12 October - Madrid

91

Cars Parks

La Palma airport Canary Islands

92

La Palma airport Canary Islands

93

Airports

Asturias airport

94

Asturias airport

95

Airports

La Palma airport Canary Island

96

La Palma airport Canary Island

97

Airports

Barcelona airport

98

Barcelona airport

99

Airports

Castellon airport

100

Castellon airport

101

Airports

Castellon airport

102

Castellon airport

103

Airports

Castellon airport

104

Castellon airport

105

Exhibition Centers

SCIENCE AND ARTS CITY - VALENCIA

Site:

http://g.co/maps/2rtcn

Architect:

Santiago Calatrava

Year:

1997

106

107

Exhibition Centers

PABELLON DE ARAGN EXPO 2008 - ZARAGOZA

108

109

Sport Centers

BOXES FORMULA 1TM - VALENCIA

Site:

http://g.co/maps/g6xj3

Architect:
Year:

Hermann Tilke
2008

110

111

Sport Centers

Technical Sport Center - Villarreal

112

Sport Centers

Technical Sport Center - Villarreal

113

Sport Centers

MADRID SPORTS CENTER

114

115

Sport Centers

JOSE ZORRILLA STADIUM - VALLADOLID

116

117

Cultural Centers

UNIVERSITY OF TELECOMUNICATIONS, UPV - VALENCIA

Site:

http://g.co/maps/mf5zr

Architect:

Vicente Corell, Joaqun Monfort y Jos Vicente Palacios

Year:

2009

118

119

Theme Parks

TERRA MITICA, BENIDORM - ALICANTE

Site:

http://g.co/maps/guumy

Architect:

GLOBAL ESTUDIOS

Year

2004

120

121

122

123

124

125

C/ Catarroja, 1 Edificio Nau Urbana. Oficinas 123-124


46940 Manises (Valencia) SPAIN
Telfono: +34 961 522 833
Fax:
+34 961 548 584
info@grupoingecons.com

También podría gustarte