What process uses test data as part of a comprehensive test of program controls in a
continuousonline manner?
A. Test data/deck
B. Base-case system evaluation
C. Integrated test facility (ITF)
D. Parallel simulation
Answer: B
Explanation:
A base-case system evaluation uses test data sets developed as part of comprehensive
testing
programs, it is used to verify correct systems operations before acceptance, as well as
periodic
validation. Test data/deck simulates transactions through real programs. An ITF creates
fictitious
files in the database with test transactions processed simultaneously with live input.
Parallel
simulation is the production of data processed using computer programs that simulate
application
program logic.
perform the same processing functions. Pilot testing takes place first at one location and
is then
extended to other locations. The purpose is to see if the new system operates
satisfactorily in one
place before implementing it at other locations. Interface/integration testing is a
hardware or
software test that evaluates the connection of two or more components that pass
information from
one area to another.The objective is to take unit-tested modules and build an integrated
structure
Which of the following online auditing techniques is most effective for the early detection
of errors
or irregularities?
A. Embedded audit module
B. Integrated test facility
C. Snapshots
D. Audit hooks
Answer: D
Explanation:
The audit hook technique involves embedding code in application systems for the
examination of
Which of the following should an IS auditor use to detect duplicate invoice records
within an
invoice master file?
A. Attribute sampling
B. Generalized audit software (GAS)
C. Test data
D. Integrated test facility (ITF)
Answer: B
When using an integrated test facility (ITF), an IS auditor should ensure that:
A. production data are used for testing.
B. test data are isolated from production data.
C. a test data generator is used.
D. master files are updated with the test data.
Answer: B
Explanation:
An integrated test facility (ITF) creates a fictitious file in the database, allowing for test
transactions
to be processed simultaneously with live datA. While this ensures that periodic testing
does not
require a separate test process, there is a need to isolate test data from production
datA. An IS
auditor is not required to use production data or a test data generator. Production
master files
should not be updated with test data.
Isaca CISA Exam