Está en la página 1de 47

Municipalidad Provincial de San Roman - Juliaca

Sub-Gerencia de obras Publicas


OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

RESUMEN DE PERSONAL INGRESOS Y APORTACIONES DEL EMPLEADOR


OBRERO
INGRESOS APOR EMPL
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SEPTIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE

42,419.65
57,993.94
88,055.94
81,966.22
86,038.86
60,400.86
46,261.84
3,928.56

3,980.77
5,582.98
7,431.52
7,788.95
8,142.43
5,712.45
4,708.14
357.53

ADMINISTRATIVO
INGRESOS APOR EMPL
27,808.70
25,435.36
21,763.58
19,474.58
19,339.10
11,346.24
13,378.32
9,786.96

2,403.68
2,173.83
1,677.34
1,677.34
1,664.36
948.23
1,142.96
824.22

SUB TOTAL
INGRESOS APOR EMPL
36,935.24
3,849.33
70,228.35
6,384.45
83,429.30
7,756.81
109,819.52
9,108.86
101,440.80
9,466.29
105,377.96
9,806.79
71,747.10
6,660.68
59,640.16
5,851.10
13,715.52
1,181.75
TOTAL

TOTAL
TOTAL
X MES ACUMULADO
40,784.57
40,784.57
76,612.80 117,397.37
91,186.11 208,583.48
118,928.38 327,511.86
110,907.09 438,418.95
115,184.75 553,603.70
78,407.78 632,011.48
65,491.26 697,502.74
14,897.27 712,400.01
712,400.01

RESUMEN DE GASTOS DE PERSONAL A NIVEL DE GASTOS DE EXPEDIENTE TECNICO,


COSTO DIRECTO, GASTOS GENERALES Y GASTOS DE SUPERVICION
GASTO DE EXPEDIENTE
COSTO DIRECTO G.G.
ABRIL
34,397.23
3,698.00
1,617.43
MAYO
46,400.42
25,779.09
JUNIO
63,576.92
23,304.01
JULIO
95,487.46
18,660.27
AGOSTO
89,755.17
16,698.27
SEPTIEMBRE
94,181.29
16,698.28
OCTUBRE
66,113.31
12,294.47
NOVIEMBRE
50,969.98
14,521.28
DICIEMBRE
4,286.09
10,611.18
TOTALES
34,397.23
393,099.26
102,757.35

G.S.
1,071.91
4,433.29
4,305.18
4,780.65
4,453.65
4,305.18
23,349.86

SUB TOTAL
40,784.57
76,612.80
91,186.11
118,928.38
110,907.09
115,184.75
78,407.78
65,491.26
14,897.27
712,400.01

T-ACUMU
40,784.57
117,397.37
208,583.48
327,511.86
438,418.95
553,603.70
632,011.48
697,502.74
712,400.01

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.33

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - PERSONAL - OBRERO

DOCUMENTO
FECHA
CLASE
N
REMUNER. Y BONIFICACIONES-PERSONAL OBREROMES DE ABRIL
N

P.E.

1.0
2.0

2.6.23.63
2.6.23.63

NOVIEMBRE
NOVIEMBRE

Plla.
Plla.

807
807

DETALLE DE GASTO
RAZON SOCIAL O NOMBRE

Municipalidad Provincial San Roman-juliaca


Municipalidad Provincial San Roman-juliaca

CONCEPTO

Guardian
Guardian

U.M.

CANTIDAD

Glb
Glb

1.00
1.00
TOTAL

SUELDO Y
BENEFICIOS

APORTAC
EMPLEADOR

IMPORTE S/.

1,964.28
1,964.28

190.98
166.55

2,155.26
2,130.83

3,928.56

357.53

4,286.09

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.33

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - PERSONAL - GASTOS GENERALES

P.E.

DOCUMENTO

DETALLE DE GASTO

FECHA
CLASE
N
RAZON SOCIAL O NOMBRE
REMUNER. Y BONIFICACIONES-PERSONAL ADMINISTRATIVO MES DE ABRIL

CONCEPTO

U.M.

CANTIDAD

SUELDO Y
BENEFICIOS

APORTE
EMPLEADOR

IMPORTE S/.

2.0
3.0

2.6.23.63
2.6.23.63

NOVIEMBRE
NOVIEMBRE

Plla.
Plla.

806
806

Municipalidad Provincial San Roman-juliaca


Municipalidad Provincial San Roman-juliaca

ASISTENTE ADMINISTRATIVO II
ALMACENERO

Glb
Glb

1.00
1.00

2,697.88
2,020.30

227.57
170.94

2,925.45
2,191.24

4.0

2.6.23.63

NOVIEMBRE

Plla.

806

Municipalidad Provincial San Roman-juliaca

RESIDENTE DE OBRA III

Glb

1.00

5,068.78

425.71

5,494.49

9,786.96

824.22

10,611.18

TOTAL

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.33

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - PERSONAL - GASTOS DE SUPERVISION

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
N

RAZON SOCIAL O NOMBRE

REMUNER. Y BONIFICACIONES-PERSONAL DE SUPERVISION MES DE ABRIL


1.00
2.6.23.63
OCTUBRE
Plla.
- Municipalidad Provincial San Roman-juliaca

U.M.

CANTIDAD

SUPERVISOR DE OBRA I

Glb

1.00

SUPERVISOR DE OBRA I

Glb

1.00

CONCEPTO

P.U.

OBLIGACIONES DEL EMPLEADOR-PERSONAL DE SUPERVISION MES DE ABRIL


1.00

2.6.23.63

OCTUBRE

Plla.

Municipalidad Provincial San Roman-juliaca

TOTAL

IMPORTE S/.

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.23

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - PERSONAL - GASTOS DE EXPEDIENTE TECNICO

DOCUMENTO
DETALLE DE GASTO
FECHA
CLASE
N
RAZON SOCIAL O NOMBRE
REMUNER. Y BONIFICACIONES-PERSONAL ADMINISTRATIVO (PROYECTISTAS)
1.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA A
2.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
DIBUJANTE
3.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA B
4.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA D
5.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA D
6.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA B
7.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
DIBUJANTE
8.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA D
9.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA A
10.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA C
11.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA A
12.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA A
13.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA A
14.0
2.6.23.63
ABRIL
Plla.
224
Municipalidad Provincial San Roman-juliaca
PROYECTISTA B
OBLIGACIONES DEL EMPLEADOR-PERSONAL PROYECTISTAS MES DE ABRIL
N

P.E.

CONCEPTO

U.M.

CANTIDAD

P.U.

IMPORTE S/.

Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

3,074.84
1,575.00
2,041.54
1,824.84
1,341.54
2,041.54
805.00
1,824.84
3,074.84
2,174.84
3,074.84
3,074.84
3,074.84
2,624.84

3,074.84
1,575.00
2,041.54
1,824.84
1,341.54
2,041.54
805.00
1,824.84
3,074.84
2,174.84
3,074.84
3,074.84
3,074.84
2,624.84

1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0

2.6.23.63
2.6.23.63
2.6.23.63
2.6.23.63
2.6.23.63
2.6.23.63
2.6.23.63
2.6.23.63
2.6.23.63
2.6.23.63

ABRIL
ABRIL
ABRIL
ABRIL
ABRIL
ABRIL
ABRIL
ABRIL
ABRIL
ABRIL

Plla.
Plla.
Plla.
Plla.
Plla.
Plla.
Plla.
Plla.
Plla.
Plla.

224
224
224
224
224
224
224
224
224
224

Municipalidad Provincial San Roman-juliaca


Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca
Municipalidad Provincial San Roman-juliaca

PROYECTISTA A
DIBUJANTE
PROYECTISTA B
PROYECTISTA D
PROYECTISTA D
PROYECTISTA B
DIBUJANTE
PROYECTISTA D
PROYECTISTA A
PROYECTISTA C

Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

261.36
133.88
170.61
178.43
112.12
170.62
83.08
178.43
261.36
211.97

261.36
133.88
170.61
178.43
112.12
170.62
83.08
178.43
261.36
211.97

11.0
12.0

2.6.23.63
2.6.23.63

ABRIL
ABRIL

Plla.
Plla.

224
224

Municipalidad Provincial San Roman-juliaca


Municipalidad Provincial San Roman-juliaca

PROYECTISTA A
PROYECTISTA A

Glb
Glb

1.00
1.00

261.36
261.36

261.36
261.36

13.0
14.0

2.6.23.63
2.6.23.63

ABRIL
ABRIL

Plla.
Plla.

224
224

Municipalidad Provincial San Roman-juliaca


Municipalidad Provincial San Roman-juliaca

PROYECTISTA A
PROYECTISTA B

Glb
Glb

1.00
1.00
TOTAL

261.36
223.11

261.36
223.11
34,397.23

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.34

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - COSTO DIRECTO

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.
UND

CANTIDAD

P.U.

IMPORTE S/.

1.0

2.6.23.64

5/22/2013

O/C

758

FLORES DE CHAMBI ISABEL

CARTEL DE OBRA

2.00

750.00

1,500.00

2.0

2.6.23.64

5/27/2013

O/C

821

FLORES DE CHAMBI ISABEL

ARPILLERA

350.00

4.50

1,575.00

3.0

2.6.23.64

5/27/2013

O/C

821

LUQUE TORRES YANETH DIANA

PLASTICO

100.00

3.50

350.00

4.0

2.6.23.64

5/27/2013

O/C

822

LUQUE TORRES YANETH DIANA

CINTA

UND

1,000.00

0.27

270.00

5.0

2.6.23.64

5/27/2013

O/C

822

LUQUE TORRES YANETH DIANA

PEGAMENTO

UND

30.00

95.00

2,850.00

6.0

2.6.23.64

27/052013

O/C

822

LUQUE TORRES YANETH DIANA

TUBERIA PVC SAP

UND

40.00

11.50

460.00

7.0

2.6.23.64

5/27/2013

O/C

822

LUQUE TORRES YANETH DIANA

CURVA PVC SAP

UND

50.00

11.00

550.00

8.0

2.6.23.64

5/27/2013

O/C

822

LUQUE TORRES YANETH DIANA

TUBO PVC SEL

UND

170.00

15.80

2,686.00

9.0

2.6.23.64

5/27/2013

O/C

822

LUQUE TORRES YANETH DIANA

TUBO PVC SAP

UND

5.00

32.00

160.00

10.0

2.6.23.64

5/27/2013

O/C

823

LUQUE TORRES YANETH DIANA

CALAMINA GALVANIZADA

PLAN

100.00

20.00

2,000.00

11.0

2.6.23.64

5/27/2013

O/C

823

LUQUE TORRES YANETH DIANA

TUBO FIERRO NEGRO

UND

11.00

65.00

715.00

12.0

2.6.23.64

5/27/2013

O/C

823

LUQUE TORRES YANETH DIANA

TUBO FIERRO NEGRO

UND

11.00

475.00

5,225.00

13.0

2.6.23.64

5/27/2013

O/C

828

LUQUE TORRES YANETH DIANA

CILINDROS VACIOS

UND

6.00

85.00

510.00

14.0

2.6.23.64

5/27/2013

O/C

828

LUQUE TORRES YANETH DIANA

CARRETILLAS BUGUI

UND

8.00

195.00

1,560.00

15.0

2.6.23.64

5/27/2013

O/C

828

LUQUE TORRES YANETH DIANA

FLEXOMETRO DE 7.5

UND

6.00

16.00

96.00

16.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

WINCHA DE 50 MT

UND

2.00

68.00

136.00

17.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

PALAS

UND

10.00

27.00

270.00

18.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

LLANTAS

UND

20.00

23.00

460.00

19.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

PARCHE

UND

2.00

5.50

11.00

20.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

PEGAMENTO

GL

10.00

1.50

15.00

21.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

LLANTAS

UND

7.00

38.00

266.00

22.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

MANGOS DE PICO

UND

15.00

5.00

75.00

23.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

NIVEL DE MANO

1.00

18.00

18.00

24.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

MANGUERA

UND

10.00

1.50

15.00

25.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

CONO DE

UND

1.00

25.00

25.00

26.0
27.0

2.6.23.64
2.6.23.64

5/28/2013
5/28/2013

O/C
O/C

828
828

LUQUE TORRES YANETH DIANA


LUQUE TORRES YANETH DIANA

TIRA LINEA
CISALLA

UND
UND

1.00
1.00

18.00
88.00

18.00
88.00

28.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

HOJA DE SIERRA

UND

1.00

35.00

35.00

29.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

BROCA

UND

5.00

8.80

44.00

30.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

BROCA

UND

5.00

15.00

75.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.34

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - COSTO DIRECTO

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

IMPORTE S/.

31.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

DISCO DE CORTE

UND

2.00

39.00

78.00

32.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

DISCO DE CORTE

UND

1.00

53.00

53.00

33.0

2.6.23.64

5/28/2013

O/C

828

LUQUE TORRES YANETH DIANA

COLA SINTETICA

GL

1.00

22.00

22.00

34.0

2.6.23.64

5/31/2013

O/C

869

G & NCORPORACION ATLANTIDA E.I.R.LTDA

FIERRO CORRUGADO

VAR

544.00

16.00

8,704.00

35.0

2.6.23.64

5/31/2013

O/C

869

G & NCORPORACION ATLANTIDA E.I.R.LTDA

FIERRO CORRUGADO

VAR

15.00

41.00

615.00

36.0

2.6.23.64

5/31/2013

O/C

870

G & NCORPORACION ATLANTIDA E.I.R.LTDA

FIERRO CORRUGADO

VAR

630.00

6.90

4,347.00

37.0

2.6.23.64

5/31/2013

O/C

870

G & NCORPORACION ATLANTIDA E.I.R.LTDA

FIERRO CORRUGADO

VAR

60.00

26.50

1,590.00

38.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

ALAMBRE NEGRO N16

KG

500.00

5.50

2,750.00

39.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

ALAMBRE NEGRO N08

KG

300.00

5.50

1,650.00

40.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

CLAVO PARA CALAMINA

KG

10.00

6.50

65.00

41.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

SOLDADURA SELLOCORD

KG

60.00

14.80

888.00

42.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

YESO DE 28 KG

BOL

20.00

7.00

140.00

43.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

OCRE COLOR ROJO

KG

10.00

12.00

120.00

44.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

LIJA

UND

160.00

2.00

320.00

45.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

LLAVE DE PASO

UND

6.00

31.00

186.00

46.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

LINTERNA

UND

1.00

25.00

25.00

47.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

CANDADO MEDIANO

UND

3.00

11.00

33.00

48.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

CLAVO PARA MADERA C/C DE 4"

KG

120.00

5.50

660.00

49.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

CLAVO PARA MADERA C/C DE 2"

KG

60.00

5.50

330.00

50.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

CLAVO PARA MADERA DE C/C DE 11/2"

KG

30.00

6.00

180.00

51.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

CLAVO PARA MADERA DE C/C DE 1"

KG

30.00

6.00

180.00

52.0

2.6.23.64

6/3/2013

O/C

886

GRUPO PROBISER SAC

CILINDROS

UND

6.00

60.00

360.00

53.0

2.6.23.64

6/3/2013

O/C

894

WAGNER SALMON ANTONIETA SATURNINA

DIESEL - B5

GL

400.00

14.60

5,840.00

54.0

2.6.23.64

6/3/2013

O/C

894

WAGNER SALMON ANTONIETA SATURNINA

GASOHOL 84 PLUS

GL

200.00

13.00

2,600.00

55.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

ZAPATOS DE SEGURIDAD

UND

30.00

58.00

1,740.00

58.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

LENTES PROTECTORES

UND

30.00

7.00

210.00

59.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

GUANTES DE JEBE

UND

20.00

7.80

156.00

60.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

GUANTES DE CUERO

UND

15.00

8.80

132.00

61.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

CORTA VIENTOS

UND

36.00

12.00

432.00

62.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

CASCOS DE SEGURIDAD

UND

30.00

8.80

264.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.34

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - COSTO DIRECTO

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

IMPORTE S/.

63.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

PROTECTOR DE OIDOS

UND

20.00

10.50

66.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

SILBATOS

UND

2.00

3.00

210.00
6.00

67.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

ARNESES

UND

2.00

125.00

250.00

68.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

MAMELUCOS

UND

30.00

48.00

1,440.00

71.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

CANDADO GRANDE

UND

1.00

23.00

23.00

72.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

CASCOS

UND

4.00

34.00

136.00

73.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

CHALECOS

UND

30.00

23.00

690.00

74.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

BOTAS DE JEBE

UND

10.00

29.00

290.00

75.0

2.6.23.64

6/26/2013

O/C

1158

SEOR DE HUANCA

TRIPLAY

PLAN

20.00

26.50

530.00

76.0

2.6.23.64

6/26/2013

O/C

1158

SEOR DE HUANCA

TRIPLAY

PLAN

60.00

43.00

2,580.00

77.0

2.6.23.64

6/26/2013

O/C

1158

SEOR DE HUANCA

TRIPLAY

PLAN

50.00

53.00

2,650.00

78.0

2.6.23.64

6/26/2013

O/C

1158

SEOR DE HUANCA

TRIPLAY

PLAN

40.00

115.00

4,600.00

79.0

2.6.23.64

6/27/2013

O/C

1169

SEOR DE HUANCA

TABLAS DE

UND

50.00

62.00

3,100.00

80.0

2.6.23.64

6/27/2013

O/C

1169

SEOR DE HUANCA

CUARTONES DE 2*2*10"

UND

400.00

18.00

7,200.00

81.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

TEE PVC SAP

UND

12.00

1.50

18.00

82.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

CODO PVC SAP

UND

20.00

1.00

20.00

83.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

TUBO PVC SAP

UND

45.00

15.00

675.00

84.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

UNION SIMPLE PVC SAP

UND

24.00

1.00

24.00

85.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

UNION UNIVERSAL 6

UND

6.00

5.00

30.00

86.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

CINTA TEFLON

UND

60.00

1.50

90.00

87.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

TARRAJA DE 3/4"

UND

1.00

22.00

22.00

88.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

VALVULA DE COMPUERTA

UND

12.00

21.00

252.00

89.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

CLAVO C/C 3"

UND

120.00

5.50

660.00

90.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

HOJAS DE SIERRA

UND

100.00

5.50

550.00

91.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

DISCO DE CORTE

UND

5.00

9.50

47.50

92.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

MANGUERA

UND

100.00

2.00

200.00

93.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

GUANTES

UND

24.00

5.50

132.00

94.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

REGLA DE ALUMINIO

UND

6.00

65.00

390.00

95.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

OCRE COLOR ROJO

UND

100.00

10.50

1,050.00

96.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

OCRE COLOR NEGRO

UND

100.00

10.50

1,050.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.34

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - COSTO DIRECTO

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
N

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

IMPORTE S/.

97.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

GUANTES DE CUERO

UND

20.00

8.50

170.00

98.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

GUANTES DE JEBE

UND

20.00

8.50

170.00

99.0

2.6.23.64

7/10/2013

O/C

1239

LUQUE TORRES YANETH DIANA

FRANELA

UND

50.00

7.50

375.00

100.0

2.6.23.64

6/27/2013

O/C

1244

VILCA TURPO ZOILA PERALTA

ACEITE

UND

4.00

39.50

158.00

101.0

2.6.23.64

6/27/2013

O/C

1244

VILCA TURPO ZOILA PERALTA

GRASA ROJA

UND

10.00

11.00

110.00

102.0

2.6.23.64

6/27/2013

O/C

1273

ARIAS BENITES JOSE ANGEL

ARENA FINA

UND

70.00

55.00

3,850.00

103.0

2.6.23.64

8/1/2013

O/C

1544

NIRO SOC. COMER. DE RESPONSAB. LTDA

HORMIGON

UND

405.00

31.98

12,951.90

104.0

2.6.23.64

7/31/2013

O/C

1656

G & NCORPORACION ATLANTIDA E.I.R.LTDA

CEMENTO PORLAND TIPO (42.5 kg)

UND

3,000.00

21.76

65,280.00

105.0

2.6.23.64

8/27/2013

O/C

1657

SEOR DE HUANCA

CUARTONES DE MADERA

UND

500.00

23.90

11,950.00

106.0

2.6.23.64

8/27/2013

O/C

1727

AGRODISTRIBUCIONES SAN PEDRO SAC

STRONG GRASS

UND

160.00

33.00

5,280.00

107.0

2.6.23.64

8/27/2013

O/C

1727

AGRODISTRIBUCIONES SAN PEDRO SAC

TREBOL

UND

50.00

25.00

1,250.00

108.0

2.6.23.64

8/27/2013

O/C

1728

WAGNER SALMON ANTONIETA SATURNINA

DIESEL - B5

UND

100.00

14.20

1,420.00

109.0

2.6.23.64

8/27/2013

O/C

1728

WAGNER SALMON ANTONIETA SATURNINA

GASOHOL 84 PLUS

UND

150.00

14.20

2,130.00

110.0

2.6.23.64

8/27/2013

O/C

1738

MERCADERES GRECO

POLICARBONATO ALVEOLAR

UND

4.00

1,300.00

5,200.00
1,500.00

111.0

2.6.23.64

8/28/2013

O/C

1742

PAIVA CCAPACA GILMA AMELIA

PLACA RECORDATORIA

UND

1.00

1,500.00

112.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

TIRAFONES

UND

342.00

1.90

649.80

113.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

CAJA DE PASE

UND

55.00

54.00

2,970.00

114.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

CAJA OCTAGONAL

UND

10.00

10.50

105.00

115.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

CAJA

UND

2.00

10.00

20.00

116.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

LIJA

UND

2.00

1.90

3.80

117.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

MARMOLINA

BOL

7.00

27.00

189.00

118.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

CAJA DE REGISTRO

UND

6.00

50.00

300.00

119.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

TAPA

UND

2.00

27.00

54.00

120.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

PLATINA

UND

16.00

9.30

148.80

121.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

THINER

UND

24.00

16.40

393.60

122.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

TAPON HEMBRA

UND

1.00

3.00

3.00

123.0

2.6.23.64

8/28/2013

O/C

1744

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

UNION UNIVERSAL

UND

4.00

16.00

64.00

124.0

2.6.23.64

8/28/2013

O/C

1761

VEGA PERREZ CRISTIAN MARTIN

SAL AGRANEL

UND

12.00

30.00

360.00

125.0

2.6.23.64

8/28/2013

O/C

1762

VEGA PERREZ CRISTIAN MARTIN

CARBON VEGETAL

UND

6.00

35.00

210.00

126.0

2.6.23.64

9/2/2013

O/C

1791

GRUPO PROBISER SAC

CEMENTO BLANCO

UND

10.00

175.00

1,750.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.34

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - COSTO DIRECTO

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
N

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

IMPORTE S/.

127.0

2.6.23.64

9/2/2013

O/C

1791

GRUPO PROBISER SAC

CEMENTO CONDUCTIVO

UND

12.00

140.00

1,680.00

129.0

2.6.23.64

9/9/2013

O/C

1881

ARIAS BENITES JOSE ANGEL

CANTO RODADO

UND

167.00

50.00

8,350.00

130.0

2.6.23.64

9/19/2013

O/C

1978

ARIAS BENITES JOSE ANGEL

PIEDRA MEDIANA

UND

60.00

55.00

3,300.00

131.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

LUMINARIA

UND

9.00

73.00

657.00

132.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

TABLERO

UND

1.00

980.00

980.00

133.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

INTERRUPTOR TERMOMAGNETICO

UND

2.00

58.00

116.00

134.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

INTERRUPTOR TERMOMAGNETICO

UND

3.00

58.00

174.00

135.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

INTERRUPTOR TERMOMAGNETICO

UND

2.00

106.00

212.00

136.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

INTERRUPTOR

UND

2.00

440.00

880.00

137.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

LUMINARIA

UND

12.00

276.50

3,318.00

138.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

VARILLA

UND

6.00

215.00

1,290.00

139.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

CONECTOR ANDERSON

UND

7.00

8.00

56.00

140.0

2.6.23.64

9/26/2013

O/C

2019

COFEELECT S.C.Rltda.

CINTA VULCANIZANTE

UND

35.00

34.00

1,190.00

141.0

2.6.23.64

10/1/2013

O/C

2059

GRUPO PROBISER SAC

TUBO DE FIERRO NEGRO

UND

27.00

165.00

4,455.00

142.0

2.6.23.64

10/1/2013

O/C

2059

GRUPO PROBISER SAC

TUBO DE FIERRO NEGRO

UND

12.00

75.00

900.00

143.0

2.6.23.64

10/1/2013

O/C

2059

GRUPO PROBISER SAC

TUBO FIERRO NEGRO

UND

20.00

235.00

4,700.00

144.0

2.6.23.64

10/11/2013

O/C

2091

LOGISTICA GENERAL PERUANDES SAC

PIEDRA LAJA

M2

200.00

66.00

13,200.00

145.0

2.6.23.64

10/18/2013

O/C

2115

NIRO SRLTDA

TIERRA DE CULTIVO

M3

705.00

35.10

24,745.50

146.0

2.6.23.64

10/18/2013

O/C

2119

CENTRO ACEROS DE LA SIERRA EIRL

CEMENTO PORLAND TIPO (42.5 kg)

BOL

400.00

22.00

8,800.00

147.0

2.6.23.64

10/31/2013

O/C

2165

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

PLATINA

UND

35.00

94.00

3,290.00

148.0

2.6.23.64

10/31/2013

O/C

2165

GRUPO BEJAR & CIA SOCIEDAD ANONIMA CERRADA

PLATINA

UND

6.00

39.00

234.00

149.0

2.6.23.64

10/31/2013

O/C

2166

GRUPO GLOBAL SERVIS SAC

GRANALLAS

BOL

21.00

43.00

TOTAL

903.00

288,089.90

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.23.64

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - GASTOS GENERALES

P.E.

DOCUMENTO

DETALLE DE GASTO

FECHA

CLASE

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

IMPORTE S/.

1.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRSELLOS

UND

4.00

23.00

92.00

2.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRCD-DR 700MB

PAQ

1.00

30.00

30.00

3.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRDVD-R

PAQ

1.00

40.00

40.00

4.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRTONER PARA IMPRESORA

UND

4.00

245.00

980.00

5.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRCUADERNO DE OBRA

UND

5.00

27.50

137.50

6.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRBLOCK PARTE DIARIO Y DE EQUIPO

UND

3.00

11.50

34.50

7.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRBLOCK PEDIDO DE MATERIALES

UND

3.00

11.50

34.50

8.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRCUADERNO CUADRICULADO *200 HOJAS

UND

10.00

11.00

110.00
45.00

9.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRFOLDER MANILA A4

UND

100.00

0.45

10.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRLIBRETA TOPOGRAFICA

UND

1.00

4.50

4.50

11.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRPAPEL BOND DE 75 Gr

MILL

10.00

27.50

275.00

12.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRPAPEL CARBON

UND

1.00

19.00

19.00

13.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRARCHIVADOR DE PALANCA

UND

15.00

5.50

82.50

14.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRLAPICERO DE TINTA SECA

CAJ

1.00

30.00

30.00

15.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRENGRAMPADOR

UND

2.00

47.00

94.00

16.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRPERFORADOR

UND

2.00

17.00

34.00

17.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRCLIPS

CAJ

1.00

2.00

2.00

18.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRGRAPAS

CAJ

2.00

4.50

9.00

19.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRKARDEX

MILL

0.50

140.00

70.00

20.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRKARDEX

MILL

0.50

140.00

70.00

21.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRFRANELA DE COLOR ROJO

6.00

6.50

39.00

22.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRCINTA MASKING TYPE

UND

3.00

4.00

12.00

23.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRCINTA DE EMBALAJE

UND

3.00

5.00

15.00

24.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRVINIFAN

UND

3.00

7.50

22.50

25.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRCUTTER

9.00

26.0

2.6.23.64

6/5/2013

O/C

915

OFFSET TOTAL QUISPE HERMANOS CONSORCIO Y DISTRPAPEL LUSTRE

27.0

2.6.23.64

6/4/2013

O/C

901

LUQUE TORRES YANETH DIANA

28.0

2.6.23.64

6/4/2013

O/C

901

29.0

2.6.23.64

6/4/2013

O/C

901

30.0

2.6.23.64

6/4/2013

O/C

31.0

2.6.23.64

6/4/2013

O/C

UND

3.00

3.00

PLIEG

15.00

0.40

6.00

CASCOS DE SEGURIDAD

UND

4.00

34.00

136.00

LUQUE TORRES YANETH DIANA

CHALECOS CON CINTA REFLECTIVA

UND

6.00

88.00

528.00

LUQUE TORRES YANETH DIANA

BOTIQUIN

UND

1.00

500.00

500.00

901

LUQUE TORRES YANETH DIANA

EXTINTOR

UND

1.00

500.00

500.00

901

LUQUE TORRES YANETH DIANA

LENTES

UND

6.00

33.00

198.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.23.64

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - GASTOS GENERALES

N
32.0

P.E.
2.6.23.64

DOCUMENTO

DETALLE DE GASTO

FECHA

CLASE

6/4/2013

O/C

901

RAZON SOCIAL O NOMBRE


LUQUE TORRES YANETH DIANA

CONCEPTO
ZAPATOS

U.M.
PAR

CANTIDAD
6.00

TOTAL

P.U.
365.00

IMPORTE S/.
2,190.00

6,349.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: DICIEMBRE 2013

2.6.23.64

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - BIENES - GASTOS DE LIQUIDACION

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
N

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

1.0
2.0

2.6.23.64

9/27/2013

O/C

2048

OFFSET TOTAL QUISPE HNOS CONSORCIO Y DISTRIBUCIONES E.I.TONER

UND

1.00

260.00

2.6.23.64

9/27/2013

O/C

2048

OFFSET TOTAL QUISPE HNOS CONSORCIO Y DISTRIBUCIONES E.I.TONER

UND

1.00

260.00

3.0
4.0

2.6.23.64

9/27/2013

O/C

2048

OFFSET TOTAL QUISPE HNOS CONSORCIO Y DISTRIBUCIONES E.I.CD-R 700 MB

UND

1.00

22.00

2.6.23.64

9/27/2013

O/C

2048

OFFSET TOTAL QUISPE HNOS CONSORCIO Y DISTRIBUCIONES E.I.PAPEL BOND 75 GRS

UND

2.00

27.50

5.0
6.0

2.6.23.64

9/27/2013

O/C

2048

OFFSET TOTAL QUISPE HNOS CONSORCIO Y DISTRIBUCIONES E.I.CUADERNO CUADRICULADO 100 HOJAS

UND

2.00

6.00

2.6.23.64

9/27/2013

O/C

2048

OFFSET TOTAL QUISPE HNOS CONSORCIO Y DISTRIBUCIONES E.I.CINTA DE EMBALAJE

UND

10.00

2.50

TOTAL

IMPORTE S/.
260.00
260.00
22.00
55.00
12.00
25.00

634.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTOR : MUNICIPALIDAD PROVINCIAL SAN ROMAN


ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

OBRA: "INSTALACION DE INFRAESTRUCTURA DE RECREACION PASIVA EN LA URB.LOS GERANIOS DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMANPUNO"
tipo
num_odc fch_odc
partida
CANTIDAD P.U.
SUB-TOTAL
nom_bie
O/C 000758
5/22/2013 2.6.2 3.6 4
2.00
750.00
1,500.00 CARTEL DE OBRA
O/C 000821
5/27/2013 2.6.2 3.6 4
350.00
4.50
1,575.00 ARPILLERA
O/C 000821
5/27/2013 2.6.2 3.6 4
100.00
3.50
350.00 PLASTICO
O/C 000822
5/27/2013 2.6.2 3.6 4
1,000.00
0.27
270.00 CINTA
O/C 000822
5/27/2013 2.6.2 3.6 4
30.00
95.00
2,850.00 PEGAMENTO
O/C 000822
5/27/2013 2.6.2 3.6 4
40.00
11.50
460.00 TUBERIA PVC SAP
O/C 000822
5/27/2013 2.6.2 3.6 4
50.00
11.00
550.00 CURVA PVC SAP
O/C 000822
5/27/2013 2.6.2 3.6 4
170.00
15.80
2,686.00 TUBO PVC SEL
O/C 000822
5/27/2013 2.6.2 3.6 4
5.00
32.00
160.00 TUBO PVC SAP
O/C 000823
5/27/2013 2.6.2 3.6 4
100.00
20.00
2,000.00 CALAMINA GALVANIZADA
O/C 000823
5/27/2013 2.6.2 3.6 4
11.00
65.00
715.00 TUBO FIERRO NEGRO
O/C 000823
5/27/2013 2.6.2 3.6 4
11.00
475.00
5,225.00 TUBO FIERRO NEGRO
O/C 000828
5/28/2013 2.6.2 3.6 4
6.00
85.00
510.00 CILINDROS VACIOS
O/C 000828
5/28/2013 2.6.2 3.6 4
8.00
195.00
1,560.00 CARRETILLAS BUGUI
O/C 000828
5/28/2013 2.6.2 3.6 4
6.00
16.00
96.00 FLEXOMETRO DE 7.5
O/C 000828
5/28/2013 2.6.2 3.6 4
2.00
68.00
136.00 WINCHA DE 50 MT.
O/C 000828
5/28/2013 2.6.2 3.6 4
10.00
27.00
270.00 PALAS
O/C 000828
5/28/2013 2.6.2 3.6 4
20.00
23.00
460.00 LLANTAS
O/C 000828
5/28/2013 2.6.2 3.6 4
2.00
5.50
11.00 PARCHE
O/C 000828
5/28/2013 2.6.2 3.6 4
10.00
1.50
15.00 PEGAMENTO
O/C 000828
5/28/2013 2.6.2 3.6 4
7.00
38.00
266.00 LLANTAS
O/C 000828
5/28/2013 2.6.2 3.6 4
15.00
5.00
75.00 MANGOS DE PICO
O/C 000828
5/28/2013 2.6.2 3.6 4
1.00
18.00
18.00 NIVEL DE MANO
O/C 000828
5/28/2013 2.6.2 3.6 4
10.00
1.50
15.00 MANGUERA
O/C 000828
5/28/2013 2.6.2 3.6 4
1.00
25.00
25.00 CONO DE
O/C 000828
5/28/2013 2.6.2 3.6 4
1.00
18.00
18.00 TIRALINEA
O/C 000828
5/28/2013 2.6.2 3.6 4
1.00
88.00
88.00 CISALLA
O/C 000828
5/28/2013 2.6.2 3.6 4
1.00
35.00
35.00 HOJA DE SIERRA
O/C 000828
5/28/2013 2.6.2 3.6 4
5.00
8.80
44.00 BROCA
O/C 000828
5/28/2013 2.6.2 3.6 4
5.00
15.00
75.00 BROCA
O/C 000828
5/28/2013 2.6.2 3.6 4
2.00
39.00
78.00 DISCO DE CORTE
O/C 000828
5/28/2013 2.6.2 3.6 4
1.00
53.00
53.00 DISCO DE CORTE
O/C 000828
5/28/2013 2.6.2 3.6 4
1.00
22.00
22.00 COLA SINTETICA
O/C 000869
5/31/2013 2.6.2 3.6 4
544.00
16.00
8,704.00 FIERRO CORRUGADO
O/C 000869
5/31/2013 2.6.2 3.6 4
15.00
41.00
615.00 FIERRO CORRUGADO
O/C 000870
5/31/2013 2.6.2 3.6 4
630.00
6.90
4,347.00 FIERRO CORRUGADO
O/C 000870
5/31/2013 2.6.2 3.6 4
60.00
26.50
1,590.00 FIERRO CORRUGADO
O/C 000886
6/3/2013 2.6.2 3.6 4
500.00
5.50
2,750.00 ALAMBRE NEGRO N 16

O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C

000886
000886
000886
000886
000886
000886
000886
000886
000886
000886
000886
000886
000886
000886
000894
000894
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000901
000915
000915
000915
000915
000915
000915
000915
000915
000915
000915
000915
000915
000915
000915

6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/3/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/4/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013

2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4

300.00
10.00
60.00
20.00
10.00
160.00
6.00
1.00
3.00
120.00
60.00
30.00
30.00
6.00
400.00
200.00
30.00
4.00
6.00
30.00
20.00
15.00
36.00
30.00
20.00
1.00
1.00
2.00
2.00
30.00
6.00
6.00
1.00
3.00
30.00
10.00
4.00
1.00
1.00
4.00
5.00
3.00
3.00
10.00
100.00
1.00
10.00
1.00
15.00
1.00

5.50
6.50
14.80
7.00
12.00
2.00
31.00
25.00
11.00
5.50
5.50
6.00
6.00
60.00
14.60
13.00
58.00
34.00
88.00
7.00
7.80
8.80
12.00
8.80
10.50
500.00
500.00
3.00
125.00
48.00
33.00
365.00
23.00
33.00
23.00
29.00
23.00
30.00
40.00
245.00
27.50
11.50
11.50
11.00
0.45
4.50
27.50
19.00
5.50
30.00

1,650.00
65.00
888.00
140.00
120.00
320.00
186.00
25.00
33.00
660.00
330.00
180.00
180.00
360.00
5,840.00
2,600.00
1,740.00
136.00
528.00
210.00
156.00
132.00
432.00
264.00
210.00
500.00
500.00
6.00
250.00
1,440.00
198.00
2,190.00
23.00
99.00
690.00
290.00
92.00
30.00
40.00
980.00
137.50
34.50
34.50
110.00
45.00
4.50
275.00
19.00
82.50
30.00

ALAMBRE NEGRO N 08
CLAVO PARA CALAMINA
SOLDADURA CELLOCORD
YESO DE 28 KG
OCRE COLOR ROJO
LIJA
LLAVE DE PASO
LINTERNA
CANDADO MEDIANO
CLAVO PARA MADERA C/C DE 4"
CLAVO PARA MADERA C/C DE 2"
CLAVO PARA MADERA C/C DE 1 1/2"
CLAVO PARA MADERA C/C DE 1"
CILINDROS
DIESEL- B5
GASOHOL 84 PLUS
ZAPATOS DE SEGURIDAD
CASCOS DE SEGURIDAD
CHALECOS CON CINTA REFLECTIVA
LENTES PROTECTORES
GUANTES DE JEBE
GUANTES DE CUERO
CORTAVIENTOS
CASCOS DE SEGURIDAD
PROTECTOR DE OIDOS
BOTIQUIN
EXTINTOR
SILBATOS
ARNESES
MAMELUCOS
LENTES
ZAPATOS
CANDADO GRANDE
CASCOS
CHALECOS
BOTAS DE JEBE
SELLOS
CD-R 700 MB
DVD-R
THONER PARA IMPRESORA
CUADERNO DE OBRA
BLOCK PARTES DIARIOS DE EQUIPO
BLOCK PEDIDO DE MATERIALES
CUADERNO CUADRICULADO X 200 HOJAS
FOLDER MANILA A-4
LIBRETA TOPOGRAFICA
PAPEL BOND 75 GRS
PAPEL CARBON
ARCHIVADOR DE PALANCA
LAPICERO DE TINTA SECA

O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/S
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/S
O/C
O/S
O/C
O/C
O/C
O/C
O/C
O/C

000915
000915
000915
000915
000915
000915
000915
000915
000915
000915
000915
000915
000485
001158
001158
001158
001158
001169
001169
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001239
001244
001244
001273
000665
001459
000751
001544
001656
001657
001727
001727
001728

6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/5/2013
6/17/2013
6/26/2013
6/26/2013
6/26/2013
6/26/2013
6/27/2013
6/27/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/10/2013
7/11/2013
7/11/2013
7/15/2013
7/16/2013
7/31/2013
8/1/2013
8/7/2013
8/21/2013
8/21/2013
8/27/2013
8/27/2013
8/27/2013

2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 5
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 5
2.6.2 3.6 4
2.6.2 3.6 5
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4

2.00
2.00
1.00
2.00
0.50
0.50
6.00
3.00
3.00
3.00
3.00
15.00
1.00
20.00
60.00
50.00
40.00
50.00
400.00
12.00
20.00
45.00
24.00
6.00
60.00
1.00
12.00
120.00
100.00
5.00
100.00
24.00
6.00
100.00
100.00
20.00
20.00
50.00
4.00
10.00
70.00
1.00
1,500.00
4,000.00
405.00
3,000.00
500.00
160.00
50.00
100.00

47.00
17.00
2.00
4.50
140.00
140.00
6.50
4.00
5.00
7.50
3.00
0.40
1,000.00
26.50
43.00
53.00
115.00
62.00
18.00
1.50
1.00
15.00
1.00
5.00
1.50
22.00
21.00
5.50
5.50
9.50
2.00
5.50
65.00
10.50
10.50
8.50
8.50
7.50
39.50
11.00
55.00
500.00
21.76
25.10
31.98
21.76
23.90
33.00
25.00
14.20

94.00
34.00
2.00
9.00
70.00
70.00
39.00
12.00
15.00
22.50
9.00
6.00
1,000.00
530.00
2,580.00
2,650.00
4,600.00
3,100.00
7,200.00
18.00
20.00
675.00
24.00
30.00
90.00
22.00
252.00
660.00
550.00
47.50
200.00
132.00
390.00
1,050.00
1,050.00
170.00
170.00
375.00
158.00
110.00
3,850.00
500.00
32,640.00
100,400.00
12,951.90
65,280.00
11,950.00
5,280.00
1,250.00
1,420.00

ENGRAMPADOR
PERFORADOR
CLIPS
GRAPAS
KARDEX
KARDEX
FRANELA COLOR ROJO
CINTA MASKING TYPE
CINTA DE EMBALAJE
VINIFAN
CUTTER
PAPEL LUSTRE
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
TRIPLAY
TRIPLAY
TRIPLAY
TRIPLAY
TABLAS DE
CUARTONES 2" X 2" X10'
TEE PVC SAP
CODO PVC SAP
TUBO PVC SAP
UNION SIMPLE PVC SAP
UNION UNIVERSAL
CINTA TEFLON
TARRAJA DE 3/4"
VALVULA COMPUERTA
CLAVO C/C 3"
HOJAS DE SIERRA
DISCO DE CORTE
MANGUERA
GUANTES
REGLA DE ALUMINIO
OCRE
OCRE
GUANTES DE CUERO
GUANTES DE JEBE
FRANELA
ACEITE
GRASA ROJA
ARENA FINA
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
CEMENTO PORTLAND TIPO IP (42.5KG)
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
HORMIGON
CEMENTO PORTLAND TIPO IP (42.5KG)
CUARTONES DE MADERA
STRONG GRASS
TREBOL
DIESEL- B5

O/C
O/C
O/S
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/S
O/S
O/S
O/S
O/S
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/S
O/S
O/S
O/S
O/S

001728
001738
000880
001742
001744
001744
001744
001744
001744
001744
001744
001744
001744
001744
001744
001744
001761
001762
001791
001791
000914
000914
000914
000914
000914
001881
001978
002019
002019
002019
002019
002019
002019
002019
002019
002019
002019
002019
002019
002048
002048
002048
002048
002048
002048
001059
001059
001059
001059
001062

8/27/2013
8/27/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013
9/2/2013
9/2/2013
9/4/2013
9/4/2013
9/4/2013
9/4/2013
9/4/2013
9/9/2013
9/19/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/26/2013
9/27/2013
9/27/2013
9/27/2013
9/27/2013
9/27/2013
9/27/2013
9/30/2013
9/30/2013
9/30/2013
9/30/2013
10/1/2013

2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 5
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 5
2.6.2 3.6 5
2.6.2 3.6 5
2.6.2 3.6 5
2.6.2 3.6 5
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 4
2.6.2 3.6 5
2.6.2 3.6 5
2.6.2 3.6 5
2.6.2 3.6 5
2.6.2 3.6 5

150.00
4.00
120.00
1.00
342.00
55.00
10.00
2.00
2.00
7.00
6.00
2.00
16.00
24.00
1.00
4.00
12.00
6.00
10.00
12.00
15.00
9,000.00
20.00
20.00
20.00
167.00
60.00
63.00
8.00
9.00
1.00
2.00
3.00
2.00
2.00
12.00
6.00
7.00
35.00
1.00
1.00
1.00
2.00
2.00
10.00
90.00
90.00
120.00
60.00
30.00

14.20
1,300.00
36.00
1,500.00
1.90
54.00
10.50
10.00
1.90
27.00
50.00
27.00
9.30
16.40
3.00
16.00
30.00
35.00
175.00
140.00
3.00
0.08
5.00
3.00
2.40
50.00
55.00
13.50
170.00
73.00
980.00
58.00
58.00
106.00
440.00
276.50
215.00
8.00
34.00
260.00
260.00
22.00
27.50
6.00
2.50
5.80
24.00
33.00
19.00
10.00

2,130.00
5,200.00
4,320.00
1,500.00
649.80
2,970.00
105.00
20.00
3.80
189.00
300.00
54.00
148.80
393.60
3.00
64.00
360.00
210.00
1,750.00
1,680.00
45.00
720.00
100.00
60.00
48.00
8,350.00
3,300.00
850.50
1,360.00
657.00
980.00
116.00
174.00
212.00
880.00
3,318.00
1,290.00
56.00
1,190.00
260.00
260.00
22.00
55.00
12.00
25.00
522.00
2,160.00
3,960.00
1,140.00
300.00

GASOHOL 84 PLUS
POLICARBONATO ALVEOLAR
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
PLACA RECORDATORIA
TIRAFONES
CAJA DE PASE
CAJA OCTAGONAL
CAJA
LIJA
CAJA DE REGISTRO
TAPA
PLATINA
THINER
TAPON HEMBRA
UNION UNIVERSAL
SAL AGRANEL
CARBON VEGETAL
CEMENTO
CEMENTO CONDUCTIVO
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
CANTO RODADO
PIEDRA MEDIANA
CONDUCTOR
LUMINARIA
LUMINARIA
TABLERO
INTERRUPTOR TERMOMAGNETICO
INTERRUPTOR TERMOMAGNETICO
INTERRUPTOR TERMOMAGNETICO
INTERRUPTOR
LUMINARIA
VARILLA
CONECTOR ANDERSON
CINTA VULCANIZANTE
TONER
TONER
CD-R 700 MB
PAPEL BOND 75 GRS
CUADERNO CUADRICULADO 100 HOJAS
CINTA DE EMBALAJE
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S

O/S
O/S
O/S
O/C
O/C
O/C
O/C
O/C
O/C
O/S
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C
O/C

001062
001062
001062
002059
002059
002059
002091
002115
002119
001158
002165
002165
002166
002167
002167
002167
002167
002167
002167
002167
002167

10/1/2013 2.6.2 3.6 5


90.00
10/1/2013 2.6.2 3.6 5
60.00
10/1/2013 2.6.2 3.6 5
90.00
10/1/2013 2.6.2 3.6 4
27.00
10/1/2013 2.6.2 3.6 4
12.00
10/1/2013 2.6.2 3.6 4
20.00
10/11/2013 2.6.2 3.6 4
200.00
10/18/2013 2.6.2 3.6 4
1,106.00
10/18/2013 2.6.2 3.6 4
400.00
10/31/2013 2.6.2 3.6 5
1.00
10/31/2013 2.6.2 3.6 4
35.00
10/31/2013 2.6.2 3.6 4
6.00
10/31/2013 2.6.2 3.6 4
21.00
10/31/2013 2.6.2 3.6 4
2.00
10/31/2013 2.6.2 3.6 4
11.00
10/31/2013 2.6.2 3.6 4
4.00
10/31/2013 2.6.2 3.6 4
67.00
10/31/2013 2.6.2 3.6 4
5.00
10/31/2013 2.6.2 3.6 4
5.00
10/31/2013 2.6.2 3.6 4
24.00
10/31/2013 2.6.2 3.6 4
181.00
TOTAL BIENES Y SERVICIOS

14.00
23.50
28.00
165.00
75.00
235.00
66.00
35.10
22.00
3,241.17
94.00
39.00
43.00
1.00
1.60
2.50
42.00
42.00
49.00
42.00
27.00

1,260.00
1,410.00
2,520.00
4,455.00
900.00
4,700.00
13,200.00
38,820.60
8,800.00
3,241.17
3,290.00
234.00
903.00
2.00
17.60
10.00
2,814.00
210.00
245.00
1,008.00
4,887.00
476,861.27

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S


COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
TUBO DE FIERRO NEGRO
TUBO DE FIERRO NEGRO
TUBO FIERRO NEGRO
PIEDRA LAJA
TIERRA DE CULTIVO
CEMENTO PORTLAND TIPO IP (42.5KG)
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-S
PLATINA
PLATINA
GRANALLAS
CODO PVC SAP 3/4" X 90
UNION PVC SAP ROSCADO
REDUCCION
PINTURA LATEX
PINTURA ESMALTE
PINTURA ANTICORROSIVA
PINTURA ESMALTE
PINTURA IMPRIMANTE

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.22.35

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - SERVICIOS - GASTOS GENERALES

N
1.0

P.E.
2.6.23.65

DOCUMENTO
FECHA
CLASE
6/17/2013

O/S

DETALLE DE GASTO
N
485

RAZON SOCIAL O NOMBRE

CONCEPTO

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTAALQUILER DE EQUIPOS

U.M.

CANTIDAD

UND

1.00
-

TOTAL

P.U.
1,000.00
-

IMPORTE S/.
1,000.00
-

1,000.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE ABRIL 2013

2.6.22.35

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - SERVICIOS - GASTOS SUPERVISION

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
N

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE ABRIL 2013

2.6.22.35

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - SERVICIOS - GASTOS SUPERVISION

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
N

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD
TOTAL

P.U.

IMPORTE S/.
-

IMPORTE S/.
-

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

MANIFIESTO DE GASTOS
OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD EJECUTORA

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

FECHA

: MES DE DICIEMBRE 2013

2.6.23.65

: COSTO DE CONSTRUCCIN POR ADMINISTRACIN DIRECTA - SERVICIOS - COSTO DIRECTO

P.E.

DOCUMENTO
FECHA
CLASE

DETALLE DE GASTO
N

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M.

CANTIDAD

P.U.

1.0
2.0

2.6.23.65
2.6.23.66

8/1/2013
8/28/2013

O/S
O/S

553
880

NIRO SOC. COMER. DE RESPONSAB. LTDA


ALMACON S.A.C.

MATERIAL DE RRELLENO
SERVICIO DE ALQUILER DE MEZCLADORA TIPO T

M3
DIA

4,000.00
120.00

25.10
36.00

3.0
4.0

2.6.23.65
2.6.23.65

9/4/2013
9/4/2013

O/S
O/S

914
914

QUISPE COANQUI INES MARIA


QUISPE COANQUI INES MARIA

ANILLADO
FOTOCOPIADO A4

UND
UND

15.00
9,000.00

3.00
0.08

5.0
6.0

2.6.23.65
2.6.23.65

9/4/2013
9/4/2013

O/S
O/S

914
914

QUISPE COANQUI INES MARIA


QUISPE COANQUI INES MARIA

FOTOCOPIADO DE PLANOS A1
FOTOCOPIADOS DE PLANOS A2

UND
UND

20.00
20.00

5.00
3.00

7.0
12.0
13.0

2.6.23.65
2.6.23.65
2.6.23.65

9/4/2013
9/30/2013
10/1/2013

O/S
O/S
O/S

914
1062
1062

QUISPE COANQUI INES MARIA


INDUSTRIA DE MULTISERVICIOS FAMA E.I.R.Ltda
INDUSTRIA DE MULTISERVICIOS FAMA E.I.R.Ltda

FOTOCOPIADOS DE PLANOS A3
PULIDORA DE DISCO HORIZONTAL
NIVEL TOPOGRAFICO

UND
DIA
DIA

20.00
30.00
90.00

2.40
10.00
14.00

14.0
15.0

2.6.23.65
2.6.23.65

10/1/2013
10/1/2013

O/S
O/S

1062
1062

INDUSTRIA DE MULTISERVICIOS FAMA E.I.R.Ltda


INDUSTRIA DE MULTISERVICIOS FAMA E.I.R.Ltda

MOTOBOMBA DE (4X4)
SIERRA CIRCULAR MESA

DIA
DIA

60.00
90.00

23.50
28.00

TOTAL

IMPORTE S/.
100,400.00
4,320.00
45.00
720.00
100.00
60.00
48.00
300.00
1,260.00
1,410.00
2,520.00
111,183.00

M A N I F I E S T O D E G A S T O S (HABILITACION DE FONDOS POR CAJA CHICA)


Obra

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

Unidad Ejecutora

: Municipalidad Provincial San Roman - Juliaca

Modadlidad

: Administracion Directa

2.6.22.26

Costo de Construccion por Adminitracion Directa-Otros

P.E.

DOCUMENTO

DETALLE DE GASTO

FECHA

CLASE

RAZON SOCIAL O NOMBRE

CONCEPTO

U.M. CANTIDAD

P.U.

1.0

29-Oct-12

B/V

363

Quispe Coanqui Ines Maria

Thones

Und.

1.00

240.00

2.0

20-Nov-12

B/V

79

Juan Carlos Alvarez Coaguila

Madera Tornillo

Pqte.

10.00

25.00

3.0

7-Dec-12

B/V

730

Valencia Huanca Vda. De Apaza Teresa

Folder Manila

Pqte.

1.00

10.00

TOTAL

T O S (HABILITACION DE FONDOS POR CAJA CHICA)

IMPORTE
S/.
240.00
250.00
10.00

500.00

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

VALORIZACION FINANCIERA DE OBRA SEGN EXPEDIENTE TECNICO CONSIDERANDO PLANILLA


OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

MODALIDAD

: ADMINISTRACION DIRECTA

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

PRESUPUESTO DE OBRA

1,005,442.52

PRESUPUESTO ASIGNADO
FECHA

1,137,405.09
NOVIEMBRE 2013

P.E.

DESCRIPCION

MONTO
COSTO DIRECTO

VALORIZACION FINANCIERA

PPTO. SEGN EXP.TEC.

ANTERIOR
GASTO

ACTUAL
%

GASTO

SALDO

ACUMULADO
GASTO
%

MONTO

839,617.97

909,455.45

530.30%

4,286.09

0.51%

913,741.54

530.81%

(74,123.57)

213,021.28

510,182.55

239.50%

4,286.09

2.01%

514,468.64

241.51%

(301,447.36)

580,494.93

288,089.90

49.63%

0.00%

288,089.90

49.63%

292,405.03

46,101.76

111,183.00

241.17%

0.00%

111,183.00

241.17%

(65,081.24)

165,824.54

180,781.91

109.02%

10,611.18

6.40%

191,393.09

115.42%

(25,568.55)

85,641.03

122,400.82

142.92%

10,611.18

12.39%

133,012.00

155.31%

(47,370.97)

129,573.10

115,051.82

88.79%

10,611.18

8.19%

125,663.00

96.98%

3,910.10

2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes

23,707.32

6,349.00

26.78%

0.00%

6,349.00

26.78%

17,358.32

2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios

10,272.00

1,000.00

9.74%

0.00%

1,000.00

9.74%

9,272.00

31,905.48

23,349.86

73.18%

0.00%

23,349.86

73.18%

8,555.62

47,081.38

23,349.86

49.59%

0.00%

23,349.86

49.59%

23,731.52
438.04

MANO DE OBRA
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal
MATERIALES
2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes
EQUIPOS Y MAQUINARIAS
2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios
COSTO INDIRECTO
GASTOS GENERALES
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal

2.6.23.66 Costo de Construccion por Adminitracion Directa-Caja Chica


GASTOS DE SUPERVISION
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal

2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes

438.04

0.00%

0.00%

0.00%

2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios

232.00

0.00%

0.00%

0.00%

232.00

GASTOS DE EXPEDIENTE TECNICO


2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal
2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes
2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios
GASTOS DE LIQUIDACION
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal
2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes
2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios
TOTAL

35,683.76

34,397.23

96.39%

0.00%

34,397.23

96.39%

1,286.53

39,945.75

34,397.23

34,397.23

86.11%

0.00%

86.11%

5,548.52

5,750.93

0.00%

0.00%

0.00%

5,750.93

100.00

0.00%

0.00%

0.00%

100.00

5.03%

0.00%

5.03%

11,960.27

0.00%

16,489.50

61.29%

400.37

12,594.27
16,489.50
1,034.37
348.00

1,005,442.52

634.00
634.00
-

1,090,237.36

0.00%

0.00%

61.29%

0.00%

0.00%

0.00%

108.43%

14,897.27

1.48%

634.00
634.00
-

1,105,134.63

0.00%

348.00

109.92%

(99,692.11)

NOTA: EL PRESENTE REPORTE FINANCIERO TIENE UNA VARIACION RESPECTO AL ANTERIOR PUESTO QUE NO SE DIO LA CONFORMIDAD DEL TOTAL DE LA O/C N 002019 Y DE LA O/C N 002115

ILLA

SALDO
%
-430.81%
-141.51%
50.37%
-141.17%
-15.42%
-55.31%
3.02%
73.22%
90.26%
26.82%
50.41%
100.00%
100.00%
3.61%
13.89%
100.00%
0.00%
94.97%
100.00%
38.71%
100.00%

-9.92%

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

VALORIZACION FINANCIERA DE OBRA SEGN EXPEDIENTE TECNICO SIN CONSIDERAR PLANILLA


OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

MODALIDAD

: ADMINISTRACION DIRECTA

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

PRESUPUESTO DE OBRA

1,005,442.52

PRESUPUESTO ASIGNADO
FECHA

1,000,980.00
OCTUBRE 2013

P.E.

DESCRIPCION

MONTO
COSTO DIRECTO

VALORIZACION FINANCIERA

PPTO. SEGN EXP.TEC.

ANTERIOR
GASTO

ACTUAL
%

GASTO

839,617.97

711,451.66

439.86%

84,496.20

213,021.28

393,099.26

184.54%

580,494.93

217,952.40

37.55%

46,101.76

100,400.00

217.78%

165,824.54

167,853.44

101.22%

85,641.03

110,106.35

128.57%

SALDO

ACUMULADO
GASTO
%

MONTO

10.06%

795,947.86

449.92%

43,670.11

0.00%

393,099.26

184.54%

(180,077.98)

14.56%

302,448.60

52.10%

278,046.33

0.00%

100,400.00

217.78%

(54,298.24)

0.38%

168,487.44

101.61%

(2,662.90)

0.00%

110,106.35

128.57%

(24,465.32)

MANO DE OBRA
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal

MATERIALES
2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes

84,496.20

EQUIPOS Y MAQUINARIAS
2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios
COSTO INDIRECTO
GASTOS GENERALES
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal

634.00

149,214.25

102,757.35

68.87%

0.00%

102,757.35

68.87%

46,456.90

2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes

23,707.32

6,349.00

26.78%

0.00%

6,349.00

26.78%

17,358.32

2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios

10,272.00

1,000.00

9.74%

0.00%

1,000.00

9.74%

9,272.00

31,905.48

23,349.86

73.18%

0.00%

23,349.86

73.18%

8,555.62

47,081.38

23,349.86

49.59%

0.00%

23,349.86

49.59%

23,731.52
438.04

2.6.23.66 Costo de Construccion por Adminitracion Directa-Caja Chica


GASTOS DE SUPERVISION
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal

2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes

438.04

0.00%

0.00%

0.00%

2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios

232.00

0.00%

0.00%

0.00%

232.00

GASTOS DE EXPEDIENTE TECNICO


2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal
2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes
2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios
GASTOS DE LIQUIDACION
2.6.23.63 Costo de Construccion por Adminitracion Directa-Personal
2.6.23.64 Costo de Construccion por Adminitracion Directa-Bienes
2.6.23.65 Costo de Construccion por Adminitracion Directa-Servicios
TOTAL

35,683.76

34,397.23

96.39%

0.00%

34,397.23

96.39%

1,286.53

39,945.75

34,397.23

34,397.23

86.11%

0.00%

86.11%

5,548.52

5,750.93

0.00%

0.00%

0.00%

5,750.93

100.00

0.00%

0.00%

0.00%

100.00

12,594.27

0.00%

5.03%

11,960.27

16,489.50

0.00%

0.00%

16,489.50

1,034.37

0.00%

61.29%

400.37

348.00

0.00%

1,005,442.52

879,305.10

87.45%

634.00
634.00
-

85,130.20

5.03%
0.00%
61.29%
0.00%

8.47%

634.00
634.00
-

964,435.30

0.00%

348.00

95.92%

41,007.22

NOTA: el anterior reporte financiero tubo una variacion en la valorizacion del porcentage acumulado por herror de formula y es de la siguiente manera anterior 87.45% y actual de 103.72% en base a los compromisos del siaf

NILLA

SALDO
%
-349.92%
-84.54%
47.90%
-117.78%
-1.61%
-28.57%
31.13%
73.22%
90.26%
26.82%
50.41%
100.00%
100.00%
3.61%
13.89%
100.00%
0.00%
94.97%
100.00%
38.71%
100.00%

4.08%

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

RESUMEN FINAL DEL ESTADO FINANCIERO COMPARATIVO APROBADO Y EJECUTADO


OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

MODALIDAD

: ADMINISTRACION DIRECTA

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

N SNIP :

244310

CORRESPONDIENTE:

INF. MENSUAL

IMPORTE
ASIGNADO

N DE ASIGNACIONES
MONTO APROBADO DEL EXPEDIENTE
MONTO DEL EXPEDIENTE MODIFICADO

S/. 1,005,442.52 R.G. N 083-2013-MPSRJ/GEMU


S/. 0.00 -

1 ra. ASIGNACION PRESUPUESTAL


2 da. ASIGNACION PRESUPUESTAL

S/. 1,000,980.00 R.G. N 083-2013-MPSRJ/GEMU


S/. 0.00 -

AMPLIACION PRESUPUESTAL
TOTAL MONTO ASIGNADO

S/. 0.00 S/. 1,000,980.00

INVERSION MES

ITEM

1,0

S/. 964,435.30

RUBRO

GASTOS EFECTUADOS
(segun docum.
Probatorios)

(-) MONTO INTERNAMIENTO (N DE NEA )

EJECUCION %

213,021.28

393,099.26

184.54%

MATERIALES
EQUIPOS

580,494.93
46,101.76

302,448.60
100,400.00

52.10%
217.78%

COSTO DIRECTO
GASTOS GENERALES

839,617.98
85,641.03

795,947.86
110,106.35

128.57%

31,905.48
35,683.76

23,349.86
34,397.23

73.18%
96.39%

12,594.27
165,824.54
1,005,442.51

634.00
168,487.44
964,435.30
-

5.03%

GATOS DE LIQUIDACION
COSTOS INDIRECTOS
TOTAL PRESUPUESTO / INVERSION
(+) MONTO TRANSFERENCIAS (N PECOSA)
(-) SALDO DE MATERIALES
INVERSION REAL DE OBRA

964,435.30

964,435.30
S/. 0.00
S/. 0.00

S/. 36,544.70

MANO DE OBRA

GASTOS DE SUPERVISION
GATOS DE EXPEDIENTE TECNICO
2,0

SALDO PRESUPUESTAL

VALOR APROBADO

TOTAL PRESUPUESTO EJECUTADO


(+) MONTO TRANSFERENCIAS (N PECOSA)

N DE RESOLUCION

OBSERVACIONES

95.92%

95.92%
TOTAL PRESUPUESTO / INVERSION

964,435.30

(+) MONTO TRANSFERENCIAS (N PECOSA)

964,435.30

(-) SALDO DE MATERIALES

INVERSION REAL DE OBRA MES DE JULIO

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

ESTADO FINANCIERO DE OBRA


OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

MODALIDAD

: ADMINISTRACION DIRECTA

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

PRESUPUESTO DE OBRA

: 1'005,442.52

PRESUPUESTO ASIGNADO

: 430,980.00

N Orden

P.E.

1.0

COSTO DIRECTO

DESCRIPCION

PPTO. SEGN EXP.TEC.


MONTO
%
839,617.97
100.00%

EJECUTADO
MONTO
795,947.86

%
94.80%

SALDO
MONTO
43,670.11

MANO DE OBRA
1.1

2.6.22.33 Costo de Construccion por Adminitracion Directa-Personal

213,021.28

100.00%

393,099.26

184.54%

(180,077.98)

580,494.93

100.00%

302,448.60

52.10%

278,046.33

46,101.76

100.00%

100,400.00

217.78%

(54,298.24)

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

168,487.44
110,106.35
102,757.35
6,349.00
1,000.00
23,349.86
23,349.86
34,397.23
34,397.23
634.00
634.00
-

58.24%
60.10%
68.87%
26.78%
9.74%
48.90%
49.59%
0.00%
0.00%
84.97%
86.11%
0.00%
0.00%
3.55%
0.00%
3.84%
0.00%

120,813.21
73,087.22
46,456.90
17,358.32
9,272.00
24,401.55
24,401.55
47,081.38
438.04
6,086.56
6,086.56
39,945.75
438.04
(534.00)
17,871.87
15,855.50
1,034.37

964,435.30

85.43%

164,483.32

MATERIALES
1.2

2.6.22.34 Costo de Construccion por Adminitracion Directa-Bienes


EQUIPOS Y MAQUINARIAS

1.3

2.6.22.35 Costo de Construccion por Adminitracion Directa-Servicios

2.0

COSTO INDIRECTO

289,300.65

2.1

GASTOS GENERALES

183,193.57

2.6.22.33 Costo de Construccion por Adminitracion Directa-Personal

2.2

23,707.32

2.6.23.35 Costo de Construccion por Adminitracion Directa-Servicios

10,272.00

GASTOS DE SUPERVISION

47,751.41

2.6.22.33 Costo de Construccion por Adminitracion Directa-Personal


2.6.22.34 Costo de Construccion por Adminitracion Directa-Bienes
2.6.23.35 Costo de Construccion por Adminitracion Directa-Servicios
2.3

GASTOS DE EXPEDIENTE TECNICO

47,081.38
438.04
232.00
40,483.79

2.6.22.33 Costo de Construccion por Adminitracion Directa-Personal


2.6.22.34 Costo de Construccion por Adminitracion Directa-Bienes
2.6.23.35 Costo de Construccion por Adminitracion Directa-Servicios
2.4

149,214.25

2.6.22.34 Costo de Construccion por Adminitracion Directa-Bienes

GASTOS DE LIQUIDACION

39,945.75
438.04
100.00
17,871.87

2.6.22.33 Costo de Construccion por Adminitracion Directa-Personal


2.6.22.34 Costo de Construccion por Adminitracion Directa-Bienes
2.6.23.35 Costo de Construccion por Adminitracion Directa-Servicios

TOTAL

16,489.50
1,034.37
348.00

1,128,918.62

100.00%
100.00%
100.00%

STADO FINANCIERO DE OBRA

SALDO
%
5.20%
-84.54%
47.90%
-117.78%
41.76%
39.90%
31.13%
73.22%
90.26%
51.10%
50.41%
100.00%
100.00%
15.03%
13.89%
100.00%
100.00%
96.45%
100.00%
96.16%
100.00%

14.57%

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

RESUMEN DE PRESUPUESTO ANALITICO APROBADO VS. EJECUTADO


PROYECTO

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

MODALIDAD

: ADMINISTRACION DIRECTA

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

PRESUPUESTO DE OBRA

: 1'005,442.52

PRESUPUESTO ASIGNADO

: 430,980.00

SEGN PRIMERA CERTIFICACION PRESUPUESTARIA N152-2013-MPSR-J/GPP-SG PF


PART.
ESPEC.

PPTO. PROGRAMADO

DESCRIPCION

S/.

PPTO. EJECUTADO

S/.

SALDO
%

S/.

2.6.2.3.33

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-PERSONAL

81,714.00

18.96%

553,603.70

128.45%

-471,889.70

-577.49%

2.6.2.3.34

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-BIENES

249,266.00

57.84%

309,431.60

71.80%

-60,165.60

-24.14%

2.6.2.3.35

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-SERVICIOS

100,000.00

23.20%

101,400.00

23.53%

-1,400.00

-1.40%

430,980.00

100.00%

964,435.30

223.78%

-533,455.30

-123.78%

TOTAL

S/.

SEGN CERTIFICACION PRESUPUESTARIA N 273-2013-MPSR-J/GPP-SG PF


PART.
ESPEC.

PPTO. PROGRAMADO

DESCRIPCION

S/.

PPTO. EJECUTADO

S/.

SALDO
%

S/.

2.6.2.3.33

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-PERSONAL

209,200.00

48.54%

553,603.70

128.45%

-344,403.70

-164.63%

2.6.2.3.34

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-BIENES

120,380.00

27.93%

309,431.60

71.80%

-189,051.60

-157.05%

2.6.2.3.35

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-SERVICIOS

101,400.00

23.53%

101,400.00

23.53%

0.00

0.00%

430,980.00

100.00%

964,435.30

223.78%

-533,455.30

-123.78%

TOTAL

S/.

Municipalidad Provincial de San Roman - Juliaca


Sub-Gerencia de obras Publicas

RESUMEN DE PRESUPUESTO EJECUTADO (Mensual)


OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

MODALIDAD

: ADMINISTRACION DIRECTA

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

PRESUPUESTO DE OBRA

: 1'005,442.52

PRESUPUESTO ASIGNADO

: 1'200,000.00

A. GASTOS DIRECTOS

CODIGO

PARTIDAS GENERICAS

EJECUTADO MES

SEGN EXP.

COSTO

TECNICO

1.1

MANO DE OBRA

213,021.28

0.00

0.00%

1.2

BIENES

580,494.93

84,496.20

14.56%

1.3

SERVICIOS
SUB TOTAL

(-)

SALDO DE MATERIALES DE CONSTRUCCION

(+)

TRANSF. DE MATERIALES DE CONST. DE ALMACEN CENTRAL


TOTAL COSTO DIRECTO DE LA OBRA

S/.

46,101.76

0.00

0.00%

839,617.97

84,496.20

10.06%

0.00
0.00
839,617.97

84,496.20

B. GASTOS ADINISTRATIVOS O INDIRECTOS

CODIGO

PARTIDAS GENERICAS

EJECUTADO MES

SEGN EXP.

COSTO

TECNICO

2.1

GASTOS GENERALES

85,641.03

0.00%

2.2

GASTOS DE SUPERVISION

31,905.48

0.00%

2.3

GASTOS DE EXPEDIENTE TECNICO

35,683.76

0.00%

2.4

GASTOS DE LIQUIDACION

12,594.27

634.00

5.03%

165,824.54

634.00

0.38%

TOTAL COSTO INDIRECTO DE LA OBRA


C. RESUMEN DEL ESTADO DE LA EJECUCION FINANCIERA
DESCRIPCION
PRESUPUESTO PROGRAMADO
PRESUPUESTO EJECUTADO

MONTO S/.

1,005,442.51

100%

85,130.20

8.47%

(-)

SALDO DE MATERIALES DE CONSTRUCCION

0.00%

(+)

TRANSF. DE MATERIALES DE CONST. DE ALMACEN CENTRAL

0.00%

INVERSION REAL DE LA OBRA MENSUAL

85,130.20

8.47%

OBRA

: INSTALACIN DE INFRAESTRUCTURA DE RECREACIN PASIVA EN LA URBANIZACIN LOS GERANIOS, DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMN - PUNO

ENTIDAD

: MUNICIPALIDAD PROVINCIAL SAN ROMAN

MODALIDAD

: ADMINISTRACION DIRECTA

ADMINISTRADOR

: WIDMAR TEHO CONDORI RUIZ

PRESUPUESTO DE OBRA
PRESUPUESTO ASIGNADO
PRESUPUESTO POR ASIGNAR

P.E.
2.6.23.63
2.6.23.64
2.6.23.65

1,005,442.52
430,980.00
574,462.52

DESCRIPCION
COSTO POR ADMINISTRACION DIRECTA - PERSONAL
COSTO POR ADMINISTRACION DIRECTA - BIENES
COSTO POR ADMINISTRACION DIRECTA - SERVICIOS
TOTALES

PRIMERA
SEGUNDA
MONTO
ASIGNACION ASIGNACION
TOTAL
362,235.53
209,200.00
153,035.53
601,441.02
120,380.00
400,000.00
41,765.97
101,400.00
21,426.99
1,005,442.52
430,980.00
574,462.52
1,005,442.52

574,462.52

59634.03

También podría gustarte