Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of t
Code
Description
Details of cost for 100 sqm
LABOUR:
114 Beldar
115 Coolie
9999 Sundries
Unit
Day
Day
L.S
Quantity
0.6
0.25
1.82
TOTAL
Add Water Charges @ 1.0
Cost of 100.0 sqm
Cost of 1 sqm
Say
2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings
30 cm measured at a height of 1 m above ground level and removal of rubbish
up to a distance of 50 m outside the periphery of the area cleared
Code
Description
Details of cost for 100 sqm
LABOUR:
114 Beldar
115 Coolie
Unit
Day
Day
Quantity
1.08
0.6
TOTAL
Add Water Charges @ 1.0
Cost of 100.0 sqm
Cost of 1 sqm
Say
240
240
2
TOTAL
Water Charges @ 1.0
Cost of 100.0 sqm
Cost of 1 sqm
Say
Amount
144
60
3.64
207.64
2.08
209.72
2.1
2.1/-
Rate
240
240
TOTAL
Water Charges @ 1.0
Cost of 100.0 sqm
Cost of 1 sqm
Say
Amount
259.2
144
403.2
4.03
407.23
4.07
4.07/-
2.1
2.1.1
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width
as well as 10 sqm on plan including disposal of excavated earth up to 50 m an
lift up to 1.5 m, disposed soil to be levelled and neatly dressed:
All Kinds of soil
Code
Description
Unit
Details of cost for 100 sqm and average depth 15 cm
LABOUR:
114 Beldar
Day
115 Coolie
Day
80.2
Earthwork in excavation by manual means over areas (exceeding 30cm in depth, 1.5m in widt
as well as 10 m2 on plan) including disposal of excavated earth lead upto 50m and lift
upto 1.5m disposed earth to be levelled and neatly dressed For foundation
All Kinds of soil
Code
Description
Unit
Details for 10 cum
114 Beldar
Day
115 Coolie
Day
Cost of 1
Cost
80.3
Earthwork in excavation by manual means over areas (exceeding 30cm in depth, 1.5m in widt
as well as 10 m2 on plan) including disposal of excavated earth lead upto 50m and lift upto
1.5m disposed earth to be levelled and neatly dressed for Open areas
All Kinds of soil
Code
Description
Unit
Details of cost for 120 cum
128 Mate
Day
115 Coolie
Day
Cost of 12
Cost
2.26
2.26.1
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stack
All Kinds of soil
Code
Description
Unit
Details of cost for 10 cum
LABOUR:
128 Mate
114 Beldar
Day
Day
2.26
2.26.2
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stack
Ordinary or hard rock
Code
Description
Unit
Details of cost for 10 cum
LABOUR:
128 Mate
Day
114 Beldar
Day
Quantity Rate
7.2
6
240
240
TOTAL
Add Water Charges @ 1.0
Cost of 100.0 sqm
Cost of 1 sqm
Say
Amount
1728
1440
3168
31.68
3199.68
32
32.0/
Amount
0.32
8
240
76.8
240
1920
TOTAL
1996.8
Cost of 10.0 cum
1996.8
Cost of 1 cum
199.68
Say 199.68/-
240
240
TOTAL
Cost of 120.0 cum
Cost of 1 cum
Say
Amount
432
10800
11232
11232
93.6
93.6/-
Amount
0.1
1.1
240
240
TOTAL
Add Water Charges @ 1.0
Cost of 10.0 cum
Cost of 1 cum
Say
24
264
288
2.88
290.88
29.09
29.09/-
0.2
1.95
240
240
TOTAL
Add Water Charges @ 1.0
Cost of 10.0 cum
Cost of 1 cum
Say
Amount
48
468
516
5.16
521.16
52.12
52.12/-
80.4
295
297
982
367
155
114
101
2
12
80.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Code
295
297
982
367
155
114
101
2
12
TOTAL
4.1
4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of cen
All work up to plinth level:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Code
293
295
2206
2202
982
2203
367
2209
155
114
101
2
12
9999
Unit
cum
cum
cum
tonne
Day
Day
Day
Day
Day
Cost
Unit
cum
cum
cum
tonne
Day
Day
Day
Day
Day
Cost
roviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering
All work up to plinth level:
:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Description
Unit
Details of cost for 1 cum
MATERIAL:
cum
cum
cum
cum
cum
cum
tonne
tonne
Day
Day
Day
Day
Day
L.S
Add Water Charges @ 1.0
Cost of 1.0 cum
Say
Quantity
Rate
Amount
0.67
0.22
0.445
1700
1750
4950
1139
385
2202.75
0.32
0.1
1.63
0.7
0.07
0.07
8800
2816
900
90
240
391.2
760
532
2400
168
500
35
TOTAL
7758.95
Cost of 1.0 cum
7758.95
Say
7758.95/Skilled
0
Un Skilled
391.2
Semi Skilled
622
Materials
6542.75
Total
7758.95/-
Quantity
Rate
Amount
0.7
0.24
0.47
1700
1750
4950
1190
420
2326.5
0.22
0.1
1.63
0.7
0.07
0.07
8800
900
240
760
2400
500
1936
90
391.2
532
168
35
7088.7
Cost of 1.0 cum
7088.7
Say 7088.7/-
QuantityRate
Amount
0.65
0.24
0.65
0.24
0.47
0.47
0.17
0.17
0.1
1.63
0.7
0.07
0.07
13.52
er Charges @ 1.0
t of 1.0 cum
1550
1700
0
0
4950
0
8800
0
900
240
760
2400
500
2
TOTAL
1007.5
408
0
0
2326.5
0
1496
0
90
391.2
532
168
35
27.04
6481.24
64.81
6546.05
6546.05/-
50.7.1.1 Dry rubble masonry with hard stone in foundation and plinth including levellin
1:6:12 ( 1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal
including cost of through stone and bond stone.
Code
Description
Details of cost for one cum.
1157 Stone for masonry work
1154 Through and bond stone size 24 x 24 x 39cm
2215 Carriage of Soling stone & masonry stone
125 Mason (for plain stone work) 2nd class
114 Beldar
115 Coolie
101 Bhisti
9999 Sundries
9999 Sundries
Add
Unit
Quantity Rate
cum
50 nos
cum
Day
Day
Day
Day
L.S
L.S
1.05
7
1.21
1.07
1.07
0.71
0.09
45.76
4.42
Amount
1300
1365
1720
240.8
0
0
900
963
240
256.8
240
170.4
760
68.4
2
91.52
2
8.84
TOTAL 3164.76
Add Water Charges @ 1.0
31.65
Cost of 1.0 cum 3196.41
Say 3196.41/-
7.1
7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling up
with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone agg
up to plinth level with:
Cement mortar 1:6 (1 cement : 6 coarse sand)
Code
1157
1154
2215
3.11
125
114
115
101
9999
9999
TOTAL
andom rubble masonry with hard stone in foundation and plinth including levelling up
with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nom
p to plinth level with:
ement mortar 1:6 (1 cement : 6 coarse sand)
Description
Details of cost for 1 cum
MATERIAL
Stone for masonry work
Through and bond stone size 24 x 24 x 39cm - CARRIAGE:
Carriage of Soling stone & masonry stone - 7.00x24cmx39cm = 0.16 cum
1.00 cum + 0.16 cum. = 1.16 cum
Cement mortar 1:6 (1 cement : 6 Coarse sand)
Rate as per item Number3.11 of SH:
Mortars
LABOUR:
Mason (for plain stone work) 2nd class
Beldar
Coolie
Bhisti
Sundries - Cement concrete 1:6:12
Sundries
TOTAL
Unit
cum
50 nos
cum
cum
Day
Day
Day
Day
L.S
L.S
Quantity
Rate
Amount
1
7
1300
1720
1300
240.8
1.16
0.33
7810.56
2577.48
1.07
1.07
0.71
0.09
45.76
4.42
900
240
240
760
2
2
963
256.8
170.4
68.4
91.52
8.84
5677.24
Add Water Charges @ 1.0
56.77
Cost of 1.0 cum 5734.01
Say 5734.01/-
367
2209
983
2261
114
101
9999
9999
Unit
Quantity
Rate
Amount
tonne
tonne
cum
0.25
0.25
1.07
8800
0
4580
2200
0
4900.6
cum
Day
Day
L.S
L.S
1.07
0.75
0.07
26.91
13.52
0
0
240
180
760
53.2
2
53.82
2
27.04
TOTAL 7414.66
80.7
Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm
or nearest available size confirming to IS 2185 part I of 1979 for super structu
floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc
Code
MR4
9999
101
9999
Description
Details of cost for 1 cum
Solid blocks of size 30x20x15cm
Sundries
Bhisti
Sundries
30x20x15cm
f 1979 for super structure up to
ent : 6 coarse sand) etc complete
Unit
Quantity
each
L.S
Day
L.S
103
0.09
0.45
22.36
Rate
26.25
2
760
2
TOTAL
Cost of 1.0 cum
Say
Amount
2703.75
0.18
342
44.72
3090.65
3090.65
3090.65/-
5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to
150landings, balconies, shelves, chajjas, lintels, bands, plain window sills, sta
spiral stair cases up to floor five level excluding the cost of centering, shutter
reinforcement, with1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggrega
Code
295
297
2202
982
2203
367
2209
155
114
101
2
12
9999
115
Description
Details of cost for 1 cum.
MATERIAL:
Stone Aggregate(single size):20 mm nominal size
Stone Aggregate(single size): 10 mm nominal size
Carriage of Stone aggregate below 40 mm nominal size
Coarse sand (zone III)
Carriage of Coarse sand
Portland Cement - (0.2225 cum)
Carriage of Cement -
LABOUR:
Mason (average)
Beldar
Bhisti
Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper
Vibrator (Needle type 40 mm)
Sundries - Extra labour for lifting material upto floor
V level:
Coolie (2.5x0.75)
Coolie
TOTAL
Add Wat
5.1
5.1.3
295
297
2202
982
2203
367
2209
155
114
101
Description
Details of cost for 1 cum
MATERIAL
Stone Aggregate(single size):20 mm nominal size
Stone Aggregate(single size): 10 mm nominal size
Carriage of Stone aggregate below 40 mm nominal size
Coarse sand (zone III)
Carriage of Coarse sand
Portland Cement - (0.2225 of cement)
Carriage of Cement
Mason (average)
Beldar
Bhisti
2
12
9999
Add Wat
OD1
295
297
2202
982
2203
367
155
114
101
2
12
9999
115
Description
Details of cost for 1 cum
MATERIAL
Stone Aggregate(single size):20 mm nominal size
Stone Aggregate(single size): 10 mm nominal size
Carriage of Stone aggregate below 40 mm nominal size
Coarse sand (zone III)
Carriage of Coarse sand
Portland Cement - (0.2833 cum)
Mason (average)
Beldar
Bhisti
Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper
Vibrator (Needle type 40 mm)
Sundries - Extra labour for lifting material upto floor
V level:
Coolie (2.5x0.75)
Coolie
Add Wat
5.9
5.9.5
Centering and shuttering including strutting, etc. and removal of form for:
Lintels, beams, plinth beams, girders bressumers and cantilevers
Code
Description
Details of cost for a beam of 6 m clear
span, 0.50 m deep 0.30 m wide and height
3.5 m from floor cubical contents
6.60x0.5x0.3 = 0.99 cum
1x1.30x6.00 = 7.80 sqm
MATERIAL:
5.9
5.9.3
Centering and shuttering including strutting, etc. and removal of form for:
Suspended floors, roofs, landings, balconies and access platform
Code
Description
Details of cost for a room 4.5x3 = 13.50 sqm height 3.5 m
MATERIAL:
Adding for maintenance @ 10% of cost
Taking salvage value after full use of material @ 25% of cost
1. Plates (size 0.75x0.60) Angle 40x40x5 mm
2x0.75 = 1.5 m
2x0.60 = 1.20 m
Quantity
Rate
Amount
cum
cum
cum
cum
cum
tonne
0.67
0.22
0.89
0.445
0.445
0.32
1700
1750
0
4950
0
8800
1139
385
0
2202.75
0
2816
tonne
Day
Day
Day
Day
Day
0.32
0.24
2.75
0.9
0.08
0.08
0
900
240
760
2400
500
0
216
660
684
192
40
L.S
Day
14.3
1.88
2
240
28.6
451.2
8814.55
88.15
8902.7
8902.7/
ent concrete,
d reinforcement - All work up to plinth level:
nominal size)
Unit
Quantity
Rate
Amount
cum
cum
cum
cum
cum
tonne
tonne
Day
Day
Day
0.67
0.22
0.89
0.445
0.445
0.32
0.32
0.17
2
0.9
1700
1750
0
4950
0
8800
0
900
240
760
1139
385
0
2202.75
0
2816
0
153
480
684
Day
Day
L.S
0.07
0.07
14.3
2400
500
2
TOTAL
Add Water Charges @ 1.0
Cost of 1.0 cum
Say
168
35
28.6
8091.35
80.91
8172.26
8172.26/-
Unit
Quantity
Rate
Amount
cum
cum
cum
cum
cum
tonne
Day
Day
Day
Day
Day
0.57
0.28
0.85
0.425
0.425
0.4
0.24
2.75
0.9
0.08
0.08
1700
1750
0
4950
0
8800
900
240
760
2400
500
969
490
0
2103.75
0
3520
216
660
684
192
40
L.S
Day
14.3
1.88
2
240
Unit
Quantity Rate
28.6
451.2
9354.55
93.54
9448.09
9448
Amount
6.4356 kg
kilogram
each
each set
L.S
L.S
Day
Day
L.S
L.S
6.4356
0.1275
0.1063
76.57
1340
471
492.77
170.85
50.07
22.1
44.2
78
1.25
2.5
39
24.61
2
850
240
2
2
156
1062.5
600
78
49.22
2703.61
27.04
2730.65
350.08
350.08/
Unit
Quantity
Rate
Amount
kilogram
each
each
9.2055
0.1063
0.1275
76.57
2122
1340
704.87
225.57
170.85
L.S
22.1
44.2
L.S
Day
Day
L.S
L.S
130
3
6
78
49.7
2
850
240
2
2
260
2550
1440
156
99.4
5650.89
Add Water Charges @ 1.0
56.51
Cost of 13.5 sqm
5707.4
Cost of 1 sqm
422.77
Say 422.77/-