Está en la página 1de 6

FACULTAD DE INGENIERA DE MINAS

PROB 01

RICSE TORRES, DENNIS

Maximizar: Z = X2 - 0.75X1
S.A.
X1 - X2 0
-0.5X1 + X2 1
'X1,X2 0

Estandarizando:
X1 - X2 - S1 + 0S2 + A1 = 0
-0.5X1 + X2 + 0S1 + S2 + 0A1 = 1
Z = 0.75X1 + X2 + 0S1 + 0S2 - MA1

F1
F2

BASE
A1
S1

Cj
-M
0
Zj
ZJ-Cj

X1
-0.75
1
-0.5
-M
-M+0.75

X2
1
-1
1
M
M-1

S1
0
-1
0
M
M

S2
0
0
1
0
0

A1
-M
1
0
-M
0

F1
F2

BASE
X1
S1

Cj
-0.75
0
Zj
ZJ-Cj

X1
-0.75
1
0
-0.75
0

X2
1
-1
0.5
0.75
-0.25

S1
0
-1
-0.5
0.75
0.75

S2
0
0
1
0
0

A1
-M
1
0.5
-0.75
M-0.75

F1
F2

BASE
X1
X2

Cj
-0.75
1
Zj
ZJ-Cj

X1
-0.75
1
0
-0.75
0

X2
1
0
1
1
0

S1
0
-2
-1
0.5
0.5

S2
0
2
2
0.5
0.5

A1
-M
2
1
-0.5
M-0.5

PROB 02

Minimizar: Z = X1 - 10X1
Maximizar Z' = -X1 + 10X2
S.A.
1X1 - 0.5X2 0
X1 - 5X2 -5
X1,X2 0

bi
0
1

bi/aij
0
-

bi
0
1

bi/aij
=F1
=F2+(F1/2)
2

bi
2
2

bi/aij
=F1+2F2
=2F2

Z Mx = -0.75(2) + 1(2) = 0.5

Estandarizando:
-1X1 + 0.5X2 + S1 = 0
-1X1 + 5X2 + S2 = 5
Z = - X1 + 10X2 + 0S1 + 0S2

F1
F2

BASE
S1
S2

Cj
0
0
Zj
ZJ-Cj

X1
-1
-1
-1
0
1

X2
10
0.5
5
0
-10

S1
0
1
0
0
0

S2
0
0
1
0
0

F1
F2

BASE
X2
S2

Cj
10
0
Zj
ZJ-Cj

X1
-1
-2
9
-20
-19

X2
10
1
0
10
0

S1
0
2
-10
20
20

S2
0
0
1
0
0

F1
F2

BASE
X2
S2

Cj
10
0
Zj
ZJ-Cj

X1
-1
0.00
1.00
0.00
1.00

X2
10
1.00
0.00
10.00
0.00

S1
0
-0.22
-1.11
-2.22
-2.22

S2
0
0.22
0.11
2.22
2.22

bi
0
5

bi/aij
0
1

bi
0
5

bi/aij
0.56

2F1
F2-F1(5/0.5)

bi
1.11
0.56

bi/aij
-5.00
-0.50

F1+F2(2/9)
F2/9

poliedro abierto,
posee infinitas
soluciones

FACULTAD DE INGENIERA DE MINAS


PROB 03:

F1
F2
F3

Maximizar Z = 3X1 + 2X2 - X3


s.a
X1 + 2X2 + X3 10
X1 + X2 + 2X3 9
2X1-X3 12;
X1 , X2 0

BASE
A1
A2
A3

Cj
-M
-M
-M
Zj
Zj - Cj

F1
F2
F3

BASE
A1
A2
X1

Cj
-M
-M
3
Zj
Zj - Cj

F1
F2
F3

BASE
A1
X3
X1

Cj
-M
-1
3
Zj
Zj - Cj

F1
F2
F3

BASE
X2
X2
X1

Cj
2
2
3
Zj
Zj - Cj

F1
F2
F3

BASE
X2
E2
X1

Cj
2
0
3
Zj
Zj - Cj

RICSE TORRES, DENNIS


ESTANDARIZANDO:
Z=3X1+2X2-X3+0E1+0E2+0E3-MA1-MA2-MA3
X1+2X2+X3-E1+A1=10
X1+X2+2X3-E2+A2=9
2X1 -X3 -E3 +A3 =12

X1
3
1
1
2
-4M
-4M-3

X2
2
2
1
0
-3M
-3M-2

X3
-1
1
2
-1
-2M
1-2M

E1
0
-1
0
0
M
M

E2
0
0
-1
0
M
M

E3
0
0
0
-1
M
M

A1
-M
1
0
0
-M
0

A2
-M
0
1
0
-M
0

A3
-M
0
0
1
-M
0

X1
3
0
0
1
3
0

X2
2
2
1
0
-3M
-3M-2

X3
-1
1.5
2.5
-0.5
-4M-1.5
-4M-0.5

E1
0
-1
0
0
M
M

E2
0
0
-1
0
M
M

E3
0
0.5
0.5
-0.5
-M-1.5
-M-1.5

A1
-M
1
0
0
-M
0

A2
-M
0
1
0
-M
0

A3
-M
-0.5
-0.5
0.5
M+1.5
2M+1.5

X1
3
0
0
1
3
0

X2
2
1.4
0.4
0.2
0.2-1.4M
-1.8-1.4M

X3
-1
0
1
0
-1
0

E1
0
-1
0
0
M
M

X1
3
0.00
0.00
1.00
3.00
0.00

X2
2
1.00
0.00
0.00
2.00
0.00

X3
-1
0.00
1.00
0.00
2.00
3.00

E1
0
-0.71
0.29
0.14
-0.43
-0.43

E2
0
0.43
-0.57
-0.29
-1.14
-1.14

E3
0
0.14
0.14
-0.43
-0.71
-0.71

A1
-M
0.71
-0.29
-0.14
0.43
M+0.96

A2
-M
-0.43
0.57
0.29
1.14
M-0.16

A3
-M
-0.14
-0.14
0.43
0.71
M+0.92

X1
3
0.00
0.00
1.00
3.00
0.00

X2
2
2.33
1.33
0.67
6.67
4.67

X3
-1
0.00
1.00
0.00
0.00
1.00

E1
0
-1.67
-0.67
-0.33
-4.33
-4.33

E2
0
1.00
0.00
0.00
2.00
2.00

E3
0
0.33
0.33
-0.33
-0.33
-0.33

A1
-M
1.67
0.67
0.33
4.33
M+4.33

A2
-M
-1.00
0.00
0.00
-2.00
M-2

A3
-M
-0.33
-0.33
0.33
0.33
M+0.33

E2
E3
0
0
0.6
0.2
-0.4
0.2
-0.2
-0.4
-0.2-0.6M -1.4-0.2M
-0.2-0.6M -1.4-0.2M

A1
-M
1
0
0
-M
0

A2
A3
-M
-M
-0.6
-0.2
0.4
-0.2
0.2
0.4
0.2+0.6M 1.4+0.2M
0.2+1.6M 1.4+1.2M

Bi
10
9
12

Bi/Aij
10
9
6

Bi
4
3
6

Bi/Aij
2.7
1.2
-12

F1-F3(1/2)
F2-F3(1/2)
F3/2

Bi
2.2
1.2
6.6

Bi/Aij
1.6
3.0
33.0

F1-F2(3/5)
F2(2/5)
F3+F2(1/5)

Bi
1.57
0.57
6.29

Bi/Aij
3.7
-1.0
-22.0

F1/1.4
F2-F1(0.4/1.4)
F3-F1(0.2/1.4)

Bi
3.67
2.67
7.33

Bi/Aij
-2.2
-4.0
-22.0

F1/0.43
F2+F1(0.57/0.43)
F3+F2(0.29/0.43)

Aun quedan variables Zj-Cj 0; pero ningun tita correspondiente a esas variables es positivo, pero podemos hacer ingresar E3.

F1
F2
F3

BASE
X2
E2
X1

Cj
2
0
3
Zj
Zj - Cj

F1
F2
F3

BASE
X2
E3
X1

Cj
2
0
3
Zj
Zj - Cj

X1
3
0.00
0.00
1.00
3.00
0.00

X2
2
2.33
1.33
0.67
6.67
4.67

X3
-1
0.00
1.00
0.00
0.00
1.00

E1
0
-1.67
-0.67
-0.33
-4.33
-4.33

E2
0
1.00
0.00
0.00
2.00
2.00

E3
0
0.33
0.33
-0.33
-0.33
-0.33

A1
-M
1.67
0.67
0.33
4.33
M+4.33

A2
-M
-1.00
0.00
0.00
-2.00
M-2

A3
-M
-0.33
-0.33
0.33
0.33
M+0.33

X1
3
0.00
0.00
1.00
3.00
0.00

X2
2
1.00
4.00
2.00
8.00
6.00

X3
-1
-1.00
3.00
1.00
1.00
2.00

E1
0
-1.00
-2.00
-1.00
-5.00
-5.00

E2
0
1.00
0.00
0.00
2.00
2.00

E3
0
0.00
1.00
0.00
0.00
0.00

A1
-M
1.00
2.00
1.00
5.00
5+M

A2
-M
-1.00
0.00
0.00
-2.00
M-2

A3
-M
0.00
-1.00
0.00
0.00
M

Bi
3.67
2.67
7.33

Bi/Aij
11.0
8.0
-22.0

F1/0.43
F2+F1(0.57/0.43)
F3+F2(0.29/0.43)

Bi
1.00
8.00
10.00

Bi/Aij
-1.0
-4.0
-10.0

F1-F2
F2/0.33
F3+F2

Nos indica que es un


poliedro abierto de
infinitas soluciones.

Nos encontramos en la misma situacin que el anterior.


En una tabla de simplex se reconoce un poliedro abierto porque se arriba a una tabla en la que hay variables que quieren entrar a la base
pero ninguna de las que est puede salir, (todos los posibles pivotes son nulos o negativos).

FACULTAD DE INGENIERA DE MINAS

RICSE TORRES, DENNIS

PROB 04:
Maximizar Z = 2X1 + 3X2
s.a
X1 + X2 = 8
2X1 + 3X2 12
X1 , X2 0

F1
F2

BASE
A1
A2

Cj
-M
-M
Zj
Zj - Cj

F1
F2

BASE
A1
X2

Cj
-M
3
Zj
Zj - Cj

F1
F2

BASE
E2
X2

Cj
0
3
Zj
Zj - Cj

ESTANDARIZANDO:
Z=2X1 + 3X2 + 0E2 - MA1 - MA2
X1 + X2 + 0E2 + A1 + 0A2 = 8
2X1 + 3X2 - E2 + 0A1 + A2 = 12
X1 , X2 0

X1
2
1
2
-3M
-3M-2

X2
3
1
3
-4M
-3-4M

E2
0
0
-1
M
M

A1
-M
1
0
-M
0

A2
-M
0
1
-M
0

X1
2
1/3
2/3
2-M/3
-M/3

X2
3

3
0

E2
0
1/3
- 1/3
-1-M/3
-1-M/3

A1
-M
1
0
-M
0

A2
-M
- 1/3
1/3
1+M/3
1+M(4/3)

X2
3

E2
0

A1
-M
3
1
3
M+3

A2
-M
-1
0
0
M

0
1

X1
2
1
1
3
1

0
1
3
0

1
0
0
0

PROB 05:
Maximizar Z = 8X1 + 5X2
s.a
2X1 + X2 10
1X1 + 3X2 18
5X1 + X2 4
X1 , X2 0

F1
F2
F3

BASE
S1
S2
S3

Zj
Zj - Cj

F1
F2
F3

BASE
S1
S2
X1

F1
F2
F3

0
-8

X1
8
0
0
1

Cj
0
0
8
Zj
Zj - Cj

BASE
S1
S2
X2

X1
8
2
1
5

Cj
0
0
0

Cj
0
0
5
Zj
Zj - Cj

8
0

X1
8
-3
-14
5
25
17

X2
5
0.6
2.8
0.2
1 3/5
-3 2/5

X2
5
0
0
1
5
0

Bi/Aij
8
4

Bi

Bi/Aij
12
-12

4
4

Bi
12
8

F1-F2(1/3)
F2/3

Bi/Aij
3F1
F2+F1

Zmax = 24 , para X1 = 0, X2 = 8

ESTANDARIZANDO:
Z=8X1 + 5X2 + 0S1 + 0S2 + 0S2
2X1 + X2 + S1 = 10
X1 + 3X2 + S2 = 18
5X1 + X2 + S3 = 4
X1 , X2 0

X2
5
1
3
1
0
-5

Bi
8
12

S1
0
1
0
0
0
0

S2
0
0
1
0
0
0

S1
0
1
0
0
0
0

Bi
10
18
4

Bi/Aij
5
18
0.8

0
0

S2
0
0
1
0

S3
0
-0.4
-0.2
0.2
1 3/5
1 3/5

S2
0
0
1
0
0
0

S3
0
-1
-3
1
5
5

0
0

S1
0
1
0
0
0
0

S3
0
0
0
1

Bi
8.4
17.2
0.8

Bi
6
6
4

Bi/Aij
14
F1-F3(2/5)
6.142857 F2-F3(1/5)
4
F3/5

Bi/Aij
F1-F3(0.6/0.2)
F2-F3(2.8/0.2)
F3/0.2

Zmax = 20 , para X1 = 0, X2 = 5

FACULTAD DE INGENIERA DE MINAS

RICSE TORRES, DENNIS

PROB 06:
Maximizar Z = 8X1 + 5X2
s.a
2X1 + X2 10
1X1 + 3X2 18
5X1 + X2 4
X1 , X2 0

F1
F2
F3

BASE
S1
S2
A1

Cj
0
0
-M
Zj
Zj - Cj

F1
F2
F3

BASE
S1
S2
X1

Cj
0
0
8
Zj
Zj - Cj

F1
F2
F3

BASE
S1
S2
X2

Cj
0
0
5
Zj
Zj - Cj

F1
F2
F3

BASE
S1
E1
X2

Cj
0
0
5
Zj
Zj - Cj

F1
F2
F3

BASE
X1
E1
X2

Cj
8
0
5
Zj
Zj - Cj

ESTANDARIZANDO:
Z=8X1 + 5X2 + 0S1 + 0S2 + 0E1 - MA1
2X1 + X2 + S1 = 10
X1 + 3X2 + S2 = 18
5X1 + X2 - E1 + A1 = 4
X1 , X2 0

X1
8
2
1
5
-5M
-5M-8

X2
5
1
3
1
-M
-M-5

S1
0
1
0
0
0
0

S2
0
0
1
0
0
0

E1
0
0
0
-1
M
M

A1
-M
0
0
1
-M
0

X1
8
0
0
1
8.00
0.00

X2
5
0.6
2.8
0.2
1.60
-3.40

S1
0
1
0
0
0.00
0.00

S2
0
0
1
0
0.00
0.00

E1
0
0.4
0.2
-0.2
-1.60
-1.60

A1
-M
-0.4
-0.2
0.2
1 3/5
M+8/5

X1
8
-3
-14
5
25.00
17.00

X2
5
0
0
1
5.00
0.00

S1
0
1
0
0
0.00
0.00

S2
0
0
1
0
0.00
0.00

E1
0
1
3
-1
-5.00
-5.00

A1
-M
-1
-3
1
5.00
5+M

X1
8
1.67
-4.67
0.33
1.67
-6.33

X2
5
0.00
0.00
1.00
5.00
0.00

S1
0
1.00
0.00
0.00
0.00
0.00

S2
0
-0.33
0.33
0.33
1.67
1.67

E1
0
0.00
1.00
0.00
0.00
0.00

A1
-M
0.00
-1.00
0.00
0.00
M

X1
8
1.00
0.00
0.00
8.00
0.00

X2
5
0.00
0.00
1.00
5.00
0.00

S1
0
0.60
2.80
-0.20
3.80
3.80

S2
0
-0.20
-0.60
0.40
0.40
0.40

E1
0
0.00
1.00
0.00
0.00
0.00

A1
-M
0.00
-1.00
0.00
0.00
M

PROB 07:
Maximizar Z = - 5X2
s.a
X1 + X2 1
-0.5X1 - 5X2 - 10
X1 , X2 0

F1
F2

BASE
S1
A2

Cj
0
-M
Zj
Zj - Cj

F1
F2

BASE
X2
A2

Cj
-5
-M
Zj
Zj - Cj

Bi
10
18
4

Bi
8.4
17.2
0.8

Bi/Aij
5
18
0.8

Bi/Aij
14
F1-F3(2/5)
6.142857 F2-F3(1/5)
4
F3/5

Bi
6
6
4

Bi/Aij
ND
2
-4

F1-F3(0.6/0.2)
F2-F3(2.8/0.2)
F3/0.2

Bi
4.00
2.00
6.00

Bi/Aij
2.40
-0.43
18.00

F1-F2(1/3)
F2/3
F3+F2(1/3)

Bi
2.40
13.20
5.20

Bi/Aij
F1/1.67
F2+F1(4.67/1.67)
F3-F1(0.33/1.67)

Zmax = 45.20 , para X1 = 2.40, X2 = 5.20

ESTANDARIZANDO:
Z=0X1 - 5X2 + 0S1 + 0E2 - MA2
X1 + X2 + S1 = 1
0.5X1 + 5X2 - E2 + A2 = 10
X1 , X2 0

X1
0
1.00
0.50
-0.5M
0.5M

X2
-5
1.00
5.00
-5M
-5M+5

S1
0
1.00
0.00
0.00
0.00

E2
0
0.00
-1.00
M
M

A2
-M
0.00
1.00
-M
0.00

X1
0
1.00
-4.50
4.5M-5
4.5M-5

X2
-5
1.00
0.00
-5.00
0.00

S1
0
1.00
-5.00
5M-5
5M-5

E2
0
0.00
-1.00
M
M

A2
-M
0.00
1.00
-M
0.00

Bi
1.00
10.00

Bi/Aij
1.00
2.00

Bi
1.00
5.00

Bi/Aij
F1
F2-F1(5)

Aparentemente llegamos a un punto donde la tabla es ptima, pero queda en la base la variable artificial
sta variable no significa nada, y si tiene valor distinto de cero no cumple con la restriccion, esto
quiere decir que el punto encontrado no pertenece al poliedro. NO HAY SOLUCION REAL PARA EL PROBLEMA PLANTEADO.

FACULTAD DE INGENIERA DE MINAS


PROB 08:

Minimizar Z = 2X1 + 3X2


Maximimzar Z' = - 2X1 - 3X2

s.a
X1 + X2 13
2X1 + X2 18
X1 + 3X2 21
X1 + 2X2 18
X1 , X2 0

F1
F2
F3
F4

BASE
A1
A2
A3
A4

Cj
-M
-M
-M
-M
Zj
Zj - Cj

F1
F2
F3
F4

BASE
A1
A2
X2
A4

F1
F2
F3
F4

BASE
A1
X1
X2
A4

F1
F2
F3
F4

Cj
-M
-2
-3
0
Zj
Zj - Cj

F1
F2
F3
F4

BASE
E4
X1
X2
E3

Cj
0
-2
-3
0
Zj
Zj - Cj

F1
F2
F3
F4

BASE
E2
X1
X2
E3

E1
0
-1.00
0.00
0.00
0.00
M
M

E2
0
0.00
-1.00
0.00
0.00
M
M

E3
0
0.00
0.00
-1.00
0.00
M
M

E4
0
0.00
0.00
0.00
-1.00
M
M

A1
-M
1.00
0.00
0.00
0.00
-M
0.00

A2
-M
0.00
1.00
0.00
0.00
-M
0.00

A3
-M
0.00
0.00
1.00
0.00
-M
0.00

A4
-M
0.00
0.00
0.00
1.00
-M
0.00

X2
-3
0.00
0.00
1.00
0.00
-3.00
0.00

E1
0
-1.00
0.00
0.00
0.00
M
M

E2
0
0.00
-1.00
0.00
0.00
M
M

E3
0
0.33
0.33
-0.33
0.67
1.00
1.00

E4
0
0.00
0.00
0.00
-1.00
M
M

A1
-M
1.00
0.00
0.00
0.00
-M
0.00

A2
-M
0.00
1.00
0.00
0.00
-M
0.00

A3
-M
-0.33
-0.33
0.33
-0.67
-1.33M-1
-0.33M-1

A4
-M
0.00
0.00
0.00
1.00
-M
0.00

X1
-2
0.00
1.00
0.00
0.00
-2.00
0.00

X2
-3
0.00
0.00
1.00
0.00
-3.00
0.00

E1
0
-1.00
0.00
0.00
0.00
M
M

E4
0
0.00
0.00
0.00
-1.00
M
M

A1
-M
1.00
0.00
0.00
0.00
-M
0.00

A2
A3
-M
-M
-0.40
-0.20
0.60
-0.20
-0.20
0.40
-0.20
-0.60
-0.6+0.6M 0.8M-0.8
1.6M-0.6 1.8M-0.8

A4
-M
0.00
0.00
0.00
1.00
-M
0.00

X1
-2
0.00
1.00
0.00
0.00
-2.00
0.00

X2
-3
0.00
0.00
1.00
0.00
-3.00
0.00

E1
E2
E3
0
0
0
-1.00
0.33
0.00
0.00
-0.67
0.00
0.00
0.33
0.00
0.00
0.33
1.00
M 0.35-0.33M 0.00
M 0.35-0.33M 0.00

E4
0
0.33
0.33
-0.67
-1.67
1-0.33M
1-0.33M

A1
-M
1.00
0.00
0.00
0.00
-M
0.00

A2
-M
-0.33
0.67
-0.33
-0.33
1-0.33M
1+0.67M

A3
-M
0.00
0.00
0.00
-1.00
0.00
M

A4
-M
-0.33
-0.33
0.67
1.67
0.33M-1
1.33M-1

X1
-2
0.00
1.00
0.00
0.00
-2.00
0.00

X2
-3
0.00
0.00
1.00
0.00
-3.00
0.00

E1
0
-3.00
1.00
-2.00
-5.00
4.00
4.00

E2
0
1.00
-1.00
1.00
2.00
-1.00
-1.00

E3
0
0.00
0.00
0.00
1.00
0.00
0.00

E4
0
1.00
0.00
0.00
0.00
0.00
0.00

A1
-M
3.00
-1.00
2.00
5.00
-4.00
M-3

A2
-M
-1.00
1.00
-1.00
-2.00
1.00
M

A3
-M
0.00
0.00
0.00
-1.00
0.00
M

A4
-M
-1.00
0.00
0.00
0.00
0.00
M

X1
-2
0.00
1.00
0.00
0.00
-2.00
0.00

X2
-3
0.00
0.00
1.00
0.00
-3.00
0.00

E1
0
-3.00
-2.00
1.00
1.00
1.00
1.00

E2
0
1.00
0.00
0.00
0.00
0.00
0.00

E3
0
0.00
0.00
0.00
1.00
0.00
0.00

E4
0
1.00
1.00
-1.00
-2.00
1.00
1.00

A1
-M
3.00
2.00
-1.00
-1.00
-1.00
M-1

A2
-M
-1.00
0.00
0.00
0.00
0.00
M

A3
-M
0.00
0.00
0.00
-1.00
0.00
M

A4
-M
-1.00
-1.00
1.00
2.00
-1.00
M-1

X1
-2
0.67
1.67
0.33
0.33
Zj
-2.67M-1
Zj - Cj -2.6M+1

Cj
-M
-2
-3
-M

Cj
0
-2
-3
0
Zj
Zj - Cj

Z = - 2X1 - 3X2 + 0E1 + 0E2 + 0E3 + 0E4 - MA1 - MA2 - MA3 - MA4
X1 + X2 - E1 + A1 = 13
2X1 + X2 - E2 + A2 = 18
X1 + 3X2 - E3 + A3 = 21
X1 + 2X2 -E4 + A4 = 18

X2
-3
1.00
1.00
3.00
2.00
-7M
3-7M

Cj
-M
-M
-3
-M

Zj
Zj - Cj

BASE
A1
X1
X2
E3

X1
-2
1.00
2.00
1.00
1.00
-5M
2-5M

RICSE TORRES, DENNIS

ESTANDARIZANDO:

E2
E3
0
0
0.40
0.20
-0.60
0.20
0.20
-0.40
0.20
0.60
0.6-0.6M 0.8-0.8M
0.6-0.6M 0.8-0.8M

Bi
13.00
18.00
21.00
18.00

Bi/Aij
13.00
18.00
7.00
9.00

Bi
6.00
11.00
7.00
4.00

Bi/Aij
9.00
6.60
21.00
12.00

F1-F3(1/3)
F2-F3(1/3)
F3/3
F4-F3(2/3)

Bi
1.60
6.60
4.80
1.80

Bi/Aij
8.00
33.00
-12.00
3.00

F1-F2(0.67/1.67)
F2/1.67
F3-F2(0.33/1.67)
F4-F2(0.33/1.67)

Bi
1.00
6.00
6.00
3.00

Bi/Aij
3.00
18.00
-9.00
-1.80

F1-F4(0.2/0.6)
F2-F4(0.2/0.6)
F3+F4(0.4/0.6)
F4/0.6

Bi
3.00
5.00
8.00
8.00

Bi/Aij
1.00
-1.00
1.00
2.00

F1/0.33
F2-F1(0.33/0.33)
F3+F1(0.67/0.33)
F4+F1(1.67/0.33)

Bi
3.00
8.00
5.00
2.00

Bi/Aij
F1
F2+F1
F3-F1
F4-2F1

Zmn. = 31, para X1 = 8.00, X2 = 5.00

FACULTAD DE INGENIERA DE MINAS


PROB 09:

F1
F2
F3

BASE
A1
A2
A3

Minimizar Z = 2000X1 + 2000X2


Maximimzar Z' = - 2000X1 - 2000X2
s.a
X1 + 2X2 80
3X1 + 2X2 160
5X1 + 2X2 200

Z = - 2000X1 - 2000X2 + 0E1 + 0E2 + 0E3 - MA1 - MA2 - MA3


X1 + 2X2 - E1 + A1 = 80
3X1 + 2X2 - E2 + A2 = 160
5X1 + 2X2 - E3 + A3 = 200

X1 , X2 0

X1 , X2 0

X1
X2
-2000
-2000
1.00
2.00
3.00
2.00
5.00
2.00
-9M
-6M
2000-9M 2000-6M

Cj
-M
-M
-M
Zj
Zj - Cj

F1
F2
F3

BASE
A1
A2
X1

F1
F2
F3

BASE
X2
A2
X1

F1
F2
F3

BASE
X2
E3
X1

PROB 10:

F1
F2

BASE
A1
A2

X1
X2
Cj
-2000
-2000
-M
0.00
1.60
-M
0.00
0.80
-2000.00
1.00
0.40
Zj
-2000.00 -2.4M-800
Zj - Cj
0.00 1200-2.4M

F1
F2

X1
X2
Cj
-2000
-2000
-2000.00
0.00
1.00
0
0.00
0.00
-2000.00
1.00
0.00
Zj
-2000.00 -2000.00
Zj - Cj
0.00
0.00

F1
F2

E2
0
0.00
-1.00
0.00
M
M

E3
0
0.00
0.00
-1.00
M
M

A1
-M
1.00
0.00
0.00
-M
0.00

A2
-M
0.00
1.00
0.00
-M
0.00

A3
-M
0.00
0.00
1.00
-M
0.00

E1
0
-1.00
0.00
0.00
M
M

E2
0
0.00
-1.00
0.00
M
M

E3
0
0.20
0.60
-0.20
-0.8M+400
400-0.8M

A1
-M
1.00
0.00
0.00
-M
0.00

A2
-M
0.00
1.00
0.00
-M
0.00

A3
-M
-0.20
-0.60
0.20
0.8M-400
1.8M-400

E2
0
0.00
-1.00
0.00
M
M

E3
A1
0
-M
0.13
0.63
0.50
-0.50
-0.25
-0.25
240-0.5M M-760
240-0.5M 2M-760

A2
-M
0.00
1.00
0.00
-M
0.00

A3
-M
-0.13
-0.50
0.25
0.5M-240
1.5M-240

E1
0
-0.75
1.00
0.50
500.00
500.00

E2
E3
A1
A2
A3
0
0
-M
-M
-M
0.25
0.00
0.75
-0.25
0.00
-2.00
1.00
-1.00
2.00
-1.00
-0.50
0.00
-0.50
0.50
0.00
500.00
0.00
-500.00 -500.00
0.00
500.00
0.00
M-500
M-500
M
Zmn = 120, 000.00 , para X1 = 40, X2 = 20

Minimizar Z = 20X1 + 22X2 + 18X3


Maximimzar Z' = - 20X1 - 22X2 - 18X3

Bi
80.00
160.00
200.00

Bi/Aij
80.00
53.33
40.00

Bi
40.00
40.00
40.00

Bi/Aij
25.00 F1-F3(1/5)
50.00 F2-F3(3/5)
100.00 F3/5

Bi
25.00
20.00
30.00

Bi/Aij
200.00 F1/1.6
40.00 F2-F1(0.8/1.6)
-120.00 F3-F1(0.4/1.6)

Bi
20.00
40.00
40.00

Bi/Aij
F1-F2(0.13/0.5)
2F2
F3+2F2

ESTANDARIZANDO:

s.a
4X1 + 6X2 + X3 54
4X1 + 4X2 + 6X3 65

Z = - 20X1 - 22X2 - 18X3 + 0E1 + 0E2 - MA1 - MA2

X1 , X2 0

X1 , X2 0

Cj
-M
-M

Cj
-22
-M
Zj
Zj - Cj

BASE
X2
X3

E1
0
-1.00
0.00
0.00
M
M

X1
X2
E1
Cj
-2000
-2000
0
-2000
0.00
1.00
-0.63
-M
0.00
0.00
0.50
-2000.00
1.00
0.00
0.25
Zj
-2000.00 -2000.00 760-0.5M
Zj - Cj
0.00
0.00
760-0.5M

Zj
Zj - Cj

BASE
X2
A2

RICSE TORRES, DENNIS


ESTANDARIZANDO:

Cj
-22
-18
Zj
Zj - Cj

X1
-20
4.00
4.00
-8M
20-8M

4X1 + 6X2 + X3 - E1 + A1 = 54
4X1 + 4X2 + 6X3 - E2 + A2 = 65

X2
-22
6.00
4.00
-10M
22-10M

X3
-18
1.00
6.00
-7M
18-7M

E1
0
-1.00
0.00
M
M

E2
0
0.00
-1.00
M
M

A1
-M
1.00
0.00
-M
0.00

A2
-M
0.00
1.00
-M
0.00

X1
-20
0.67
1.33

X2
X3
E1
E2
A1
A2
-22
-18
0
0
-M
-M
1.00
0.17
-0.17
0.00
0.17
0.00
0.00
5.33
0.67
-1.00
-0.67
1.00
-14.74-1.33M -22.00 -3.74-5.33M 3.74-0.67M
-3.74+0.67M
M
-M
5.26-1.33M 0.00 12.67-5.33M
3.74-0.67M
M
1.67M-3.74 0.00

X1
-20
0.63
0.25
-18.25
1.75

X2
-22
1.00
0.00
-22.00
0.00

X3
-18
0.00
1.00
-18.00
0.00

E1
0
-0.19
0.13
1.88
1.88

E2
0
0.03
-0.19
2.69
2.69

A1
A2
-M
-M
0.19
-0.03
-0.13
0.19
-1.88
-2.69
M-1.88 M-2.69

Bi
54.00
65.00

Bi/Aij
9.00
16.25

Bi
9.00
29.00

Bi/Aij
54.00
5.44

Bi
8.09
5.44

Bi/Aij

F1/6
F2-F1(4/6)

F1-F2(0.17/5.33)
F2/5.33

Zmn = 275.96 , para X1 = 0, X2 = 8.09, X3 = 5.44