Job Safety Analysis No.

:
PERFORM the operation of Boost charging of UPS battery bank
1. Ensure no alarm on UPS:A & B.
2.

Push Boost

and step inside the stack with the cursor keys

and

until

.
Boost
Charge
.

is shown in the display.


3. By pushing
Boost charging is selected ON.
4. Now Boost charging of battery is started. Check the battery
current & voltage.
5. Inform Main fire station for Battery room DGH alarm may
appear.
6. Logged the battery current & voltage at regular interval.
7. Boost charging will automatically stop after predetermined time.
Examiner's special words : __________________________________________
________________________________________________________________