Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Valorizacion
Valorizacion
1
2
3
4
5
6
Descripcin
MANO DE OBRA INC. LEYES SOCIALES
MADERA NACIONAL PARA ENCOF. Y CARPINT.
CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION CORRUGADO
AGREGADO GRUESO
BLOQUE Y LADRILLO
MAQUINARIA Y EQUIPO IMPORTADO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ENERO 2014
Indice
Smbolo
Factor
(%)
I0
47
43
21
03
05
17
49
39
J
M
C
A
0.292
0.225
0.141
0.084
AMB
0.084
GGU
0.174
100.000
100.000
100.000
100.000
52.381
7.143
40.476
100.000
498.10
625.31
428.12
474.67
606.52
895.91
249.28
393.46
1.000
NOVIEMBRE 2014
IR
523.70
619.74
423.83
495.36
613.07
839.23
261.11
403.94
K nov=
K
0.307
0.223
0.140
0.088
0.044
0.006
0.036
0.179
1.023
DICIEMBRE 2014
IR
523.70
619.66
423.83
501.62
605.43
835.92
264.41
404.87
K dic=
K
0.307
0.223
0.140
0.089
0.044
0.006
0.036
0.179
1.024
ENERO 2015
IR
523.15
619.98
423.83
509.07
608.72
832.79
268.53
405.56
K ene=
K
0.307
0.223
0.14
0.09
0.044
0.006
0.037
0.179
1.026
36.37
17743.94
6453.47
NOVIEMBRE 2014
PROGRAMADO
EJECUTADO
K
REAJUSTE
PROGRAMADO
REAJUSTE EJECUTADO
A RECONOCER
63.63
17743.94
11290.47
MES
ACUMULADO
MES
ACUMULADO
PAGO
MES
ACUMULADO
MES
ACUMULADO
MES
ACUMULADO
55,000.00
55,000.00
45,654.95
45,654.95
1.024
1,320.00
1,320.00
1,095.72
1,095.72
1,095.72
1,095.72
AD=
AM=
DICIEMBRE 2014
70,526.83
125,526.83
79,871.88
125,526.83
1.026
1,833.70
3,153.70
2,076.67
3,172.39
2,057.98
3,153.70
4565.50
9130.99
bre 2014
S/. 45,654.95
S/.
1,095.72
R=V(k-1)
S/.
4.46 (-) 0.10*(val/ka)*(k-ka)
S/.
- (-) 20%val*(imr-ima)/imo
===========
S/. 46,746.21
S/.
4,565.50 (-) 10 % de la val.
S/.
8,464.31 (-)
===========
S/. 33,716.40
S/.
6,068.95 (18 % val neta)
===========
S/. 39,785.35
7987.188
S/. 79,871.88
S/.
2,076.67
R=V(k-1)
S/.
23.42 (-) 0.10*(val/ka)*(k-ka)
S/.
- (-) 20%val*(imr-ima)/imo
===========
S/. 81,925.13
S/.
7,987.19 (-) 10 % de la val.
S/.
9,279.64 (-)
===========
S/. 64,658.30
S/. 11,638.49 (18 % val neta)
===========
S/. 76,296.79
unidad
SOLADO MEZCLA C:H 1:10 e=4"
CIMIENTOS CORRIDOS C:H 1:10 CON
30% P.G.
SOBRECIMIENTO MEZCLA DE CONCRETO
C:H (1:8) + 25 % P.M.
FALSO PISO E = 4", MEZCLA C:H 1:8
ZAPATAS: CONCRETO F'C= 210 KG/CM2
VIGA DE CIMENTACION: CONCRETO
F'C=210 KG/CM2
COLUMNAS: CONCRETO F'C=210 KG/CM2
m2
m3
m3
m2
m3
m3
m3
metrado
cantidad
bolsas
pu
parcial
23.68
0.4267
10.104
21.5
217.24
23.92
2.9
69.368
21.5
1491.41
5.53
92.61
3.7
0.36
20.461
33.340
21.5
21.5
439.91
716.80
11.84
8.73
103.363
21.5
2222.31
5.31
8.73
46.356
21.5
996.66
12.68
8.73
110.70
21.5
sumatoria
2379.97
8464.31
unidad
VIGAS, CONCRETO F'C=210 KG/CM2
LOSA ALIGERADA, CONCRETO F'C= 210
KG/CM2.
ESCALERA CONCRETO F'C=210 KG/CM2
metrado
cantidad
bolsas
m3
17.78
8.73
155.22
m3
28.49
8.73
248.72
m3
3.17
8.73
27.67
pu
parcial
21.5
3337.22
21.5
5347.43
21.5
sumatoria
594.99
9279.64