Deptl. Objectives
Owner/ Dept.
HR/Admin
Measure
Customer
satisfaction Index
Target (15-16)
>=90%
ISD
EDC
Materials
Prod.Plan
CDU
HYD
HCU
OM&S
CPP
PE
Insp.
Design
Lab
F&S
Elect.
Mech.
Inst.
Civil
EMC
CDU-3
Hydrogen-3
PFCC
PPU
Q2. Satisfied External Customers
Improve External
Direct-Mkt
90%
CWO
Deptl. Objectives
Owner/ Dept.
Improve External
Customer satisfaction
Increase Sales
Q3. Satisfied Business Associates
Improve satisfaction of
Business Associates
Marketing-Sales
Availability of products
in demand (for OMCs)
PP
No. of instances of
quality giveaway
PP
Measure
Target (15-16)
OMCs
Export
Overall
Sales Volume
90%
90%
90%
1280 TMT
Monthly demand
Plan vs Actual
95%
TMT
15250
HCU:95%
No of QGA Batches/
Month
5/5/7/10
Wt %
76.00%
Achievement of
departmental KPIs
MR
Effective review
100% review
CWO
Deptl. Objectives
On an average per
employee
Owner/ Dept.
HR
Measure
Mandays/year -Staff
HR
15%
HR
4%
Target (15-16)
Completed
E&S
Jun-16
Objectives taken on
SEA's - 32 nos. (No
deviations)
No. of incidents
Nil
CWO
Deptl. Objectives
Development of green
belt in and around the
Refinery
Owner/ Dept.
E&S
Measure
Plantation of trees
Target (15-16)
20,000 plantation
E4. Comply and achieve beyond all legal, statutory, regulatory and other applicable requirements
No non-compliances to all statutory, regulatory
requirements
E&S
Compliance to all
statutory
Compliance list is
requirements
being followed
(KSPCB/CPCB/MOEF)
E&S/ CSR
Env. Awarness
program to
neighbouring
community
1 No. of Awarness
programs
Status as on
31/03/2016
Remarks /
justifications if any
<=90%
Purchase: 80.48%
Warehouse: 92.99%
94.00%
94.90%
96.00%
95.00%
95.70%
95.70%
93.57%
92.50%
96.80%
95.00%
<=90%
93.70%
90.00%
94.91%
90.00%
93.30%
100.00%
96.36%
90% Nil
<=90%
Status as on
31/03/2016
1391 TMT
99.18%
15532
HCU:96%
77.67%
100% review
100% review
Remarks /
justifications if any
Status as on
31/03/2016
Remarks /
justifications if any
2.18
2.49
100%
100%
Subject to deriving
of SEA's for 2016-17
Nil
Status as on
31/03/2016
Remarks /
justifications if any
Sl No.
Dept.
1 CDU BLOCK
2 CDU BLOCK
Title of CI Project
Targeting VGO 95% Recovery >540^C. CDU1/2 70% of the time
Covering 79% of operating staff who can able
to work in all areas.
4 HCU-1
5 HCU-1
6 CDU3 BLOCK
7 CDU3 BLOCK
3 ISD
Expected benefit*
Increase in distillate yield.
Flexibility in opeartion.
Quality
Action Plan
Continuous
Continuous
Continuous
Continuous
Continuous
Dept.
KPI
Target 2015-16
Status as on 31/03/2016
training-86%
HR admin-95%
30 policies updated
HR/Admin
90%
HR/Admin
HR/Admin
3
90%
HR
HR/ Admin
HR
CSR
3000 students
CDU
Crude Processing
CDU3
CDU3
CDU-3
Civil
Crude Processing
Coke production
Maintenance as per Plan
Civil
CPP
CPP
CPP
CPP
CPP
Design
KPA
Interruptions of steam to refinery
Interruptions of power to refinery
Interruptions of nitrogen to refinery
Steam to fuel ratio in boilers
HRV index
KPI-1
2.18
2.49
21(c/f-3)
0
0
0
15.5
5.39
70%
15.53 MMT
2.57MMTPA
3.64MMTPA
1.37 times of MCR
50 Completed
17-I/P
1-cancelled
14-Completed 6 -I/P 1
shifted to project
3+5
4+4
1+0
14.69
5.53
69.30%
Dept.
KPI
EDC
EDC
Elect
HSE
HSE
HSE
F&S
Hyd
Target 2015-16
Status as on 31/03/2016
250
3 min
85%
200 MT
100%
0
0
0
0
6
0
0
5.04 TMTPD for 345 days
8
0
29
4.64 TMTPD for 323.5
days
Hyd
CCR-1 run
Hyd
Hyd
Hydrogen-3
Hydrogen-3
HCU
Insp
Insp
Inst
CCR-2 run
ISOM throughput
S/C ratio
Maximise LCGO hot feed to DHDT
Maximization of middle disttilate
Effectiveness Index
Consequence Index
Calibration on schedule
NA
2.73
15%
HCU1-76.00%
HCU2-64.00%
Increase by 3%
Decrease by 1%
100%
100%
Dept.
KPI
Inst
Inst
Inst
ISD
Lab
Lab
Mat
Mat
Mech
Mech
Mkt
Mkt
MR
MR
MR
MR
OMS
OMS
OMS
OMS
Security
PE
P.Plan
P.Plan
P.Plan
PFCC
PFCC
Top mgmt
Target 2015-16
Status as on 31/03/2016
100%
22.30 Cr.
0
99.00%
100%
100%
90% of the tenders
19000 Items
79.35 Cr
<10
90%
1280TMT
Dec-15
100%
22.77 Cr.
3
99.80%
100%
100%
106.35
6
96.36%
1391 TMT
Apr-16
2
Nil
2
2.0 hrs
2
Nil
2
1.55
100%
5/5/7/10
95%
100%
2/6/5/1
100.00%
2.00
40
15250
100%
95.00%
38.00%
100.00%
Quarterly Review
15532
100%
99.18
Dept.
Top mgmt
KPI
Target 2015-16
Monthly Review
Status as on 31/03/2016
Target 2016-17
Remarks / Justification
15.25 MMT
3MMTPA
3.5MMTPA
KPI to be added
Target 2016-17
Remarks / Justification
NA
NA
NA
90%
74.50%
65.00%
100%
Nil
New KPI
DAR to be given
Target 2016-17
Remarks / Justification
100%
34.49 Cr.
0
99.00%
100%
100%
Nil
Nil
Nil
2.60 to 2.71
13% to 20%
Dec-16
Target 2016-17
Remarks / Justification
Dept.
KPI
Target 201516
Status as on
31/03/2016
MR
PE
Continous
Continous
MR
PE
Target 2016-17
OPI
No.
Area
Department
Refinery wide
/ Opportunities
Identified
attending, steam
traps attending,
rerouting of
submerged
Total No
CDU Block
HYD Block
HCU Block
OMS Block
CPP Block
CDU-3
Hydrogen-3
PFCC
ICPR
Total
OPI
No.
Area
Department
Refinery wide
490
443
891
265
/ Opportunities
Identified
Insulation
attending
CPP Block
CDU-3
Hydrogen-3
PFCC
ICPR
OPI
No.
Area
Department
Refinery wide
CDU Block
HYD Block
HCU Block
OMS Block
CPP Block
CDU-3
Hydrogen-3
PFCC
OPI
No.
Area
Department
Refinery wide
CDU Block
HYD Block
HCU Block
OMS Block
45
/ Opportunities
Identified
Hot feed
maximisation
CONTINUOUS
/ Opportunities
Identified
Furnace
efficiency
improvements
CONTINUOUS
Regular Aph washing of GOHDS and Mxu heaters
HCU-2 APH REPLACEMENT
CPP Block
CDU-3
Hydrogen-3
PFCC
OPI
No.
Area
Department
Refinery wide
CDU Block
HYD Block
/ Opportunities
Identified
Electrical Energy
Conservation
CONTINUOUS
Clean MP condensate
Flash vessel(FA32850) -GA32850A/B pumps were
stopped and the flow of
condensate
(Level control in vessel) was
done
by the virtue of pressure in the
vessel.
HCU Block
OMS Block
CPP Block
CDU-3
Hydrogen-3
PFCC
OPI
No.
Area
Department
Refinery wide
HYD Block
/ Opportunities
Identified
Process
Optimisation
Clean condensate from
CCR-2/RSU routed
towards ISOM unit
and routed to
Condensate polishing
unit
and approximately 25-30
m3/hr of condensate
route up to Cooling
water stopped and
reprocessing
cost saved. Also excess
condensate
draining at deareator
stopped.
S/D
Reqiured
43
41
220
15
0.98 Cr
ATTENDED
PENDING
127
223
48
192
38
3.14 Cr.
400
1.57 Cr.
250
0.98 Cr
113
45 laks
4.92 crores
Actual
Rs./Yr
Savings
in
Savings
in
Around
Given below
8 Cr.
Balance
56
252
114
30
Actual
Rs./Yr
-
Actual
Rs./Yr
Savings
in
Actual
Rs./Yr
Given below
Around
4 Cr.
COMPLETED ON OCT-15
Savings
in
Actual
Rs./Yr
Given below
2.35 Crs
Savings
in
Actual
Rs./Yr
10.5 Cr.
Savings
in
Energy Objective
Measure
En1 Conservation of Energy
Process Modifications to conserve MM Kcal/Hr
energy
Energy Objective
Measure
Target (2015-16)
Responsibility
3 MMKcal/Hr reduction
per year
PE
En2: Continually improve energy performance by efficient management of energy resources and conservation
a) Hydrocarbon Flaring reduction
MT
CDU1
5% Reduction
60 MT
CDU2
362 MT
VBU1
14 MT
VBU2
21 MT
HCU1
1137 MT
HCU2
GOHDS
386 MT
CCR1
248 MT
CCR2
75 MT
HYD1
326.77 MT
HYD2
87 MT
ISOM
40 MT
MX
99.75 MT
RSU
109.25 MT
CDU-3
NA
DCU
NA
DHDT
Hydrogen-3
PFCC
CHT
b) Reduction of slop
MT
CDU BLOCK
10% Reduction
1615 MT
MT
10% Reduction
Energy Objective
Measure
Previous level
Target (2015-16)
(2014-15)
En3: Comply with applicable legal & other requirements
Compliance to Electricity acts
% Compliance
100% compliance 100% compliance
En4: Support the purchase of energy efficient products and services
Procurement of Energy efficient Nos. Purchased 100 %
AC and Lights
compliance
En5: Promote awareness on EnMs & propagate energy policy
Employee involvement
Through contests 2 contests
100%
Remarks
MMKcal/Hr
Responsibility
on
83.7 MT
127.8 MT
13.9 MT
19.7 MT
935 MT
268 MT
424 MT
69 MT
412 MT
296 MT
80.5 MT
115.75 MT
147.5 MT
Refinery units
3860 MT
Resp.
Elect
Elect
100% compliance
100 % compliance
PE
OGCF contests conductes
Remarks
Sr No
Unit
1 Hydrogen
2
3
4
5
6
7
8
9 HCU-1
HCU-1
10
11 CDU
12 CDU
13 CDU
Scheme
HCU revamp time HP amine pumps impeller was modified to meet the new design requirem
scenario old pump design is adequate and old impellers restoring to save energy.
In CDU1 , HHGO pumps ( GA1025A/B ) impellers to be trimmed as flow requirement is less
In CDU1 , condensate recovery system capacity is inadequate, to be enhanced.
In CDU2 , Hotwell slop oil pumps (GA41108A/B ) VSD provision to be made.
Energy
MMKcal/Hr
savings, Scheme
completed on