UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS

Laureate International Universities

PROYECTO CENTRAL
HIDROELECTRICA MOLLOCO
ALUMNOS:

SANCHEZ ESCUDERO, VICTOR HUGO


SOTOMAYOR CERRN, JESUS BRAULIO
DEL AGUILA PANDURO, RODOLFO MARTIN
CARBONELL REMIGIO, ESMIRNA GMINIS
CENTENO TASAICO, ROBERTO REYNALDO

CURSO:

INGENIERA DE LOS RECURSOS HIDRAULICOS

PROFESOR:

Dr. Ing. EDWIN N. AYROS

LIMA - PER

2016-I
INDICE
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

CENTRAL HIDROELECTRICA MOLLOCO.......................................................................


INTRODUCCIN................................................................................................................
1.

CAPTULO I: GENERALIDADES.............................................................................

1.1 OBJETIVOS..........................................................................................
1.2 DESCRIPCIN GENERAL DEL PROYECTO................................................
1.2.1....................................................................................................... EMBALSES
8
1.2.1.1................................................................................. EMBALSE MACHUCOCHA
8
1.2.1.2....................................................................................... EMBALSE MOLLOCO
8
1.2.1.3.............................................................................................. EMBALSE JAPO
8
1.2.2............................................................................ CENTRALES HIDROELCTRICAS
9
1.2.2.1........................................................................... CASA DE MQUINAS LLATICA
9
1.2.2.2.............................................................................. CASA DE MQUINAS SORO
9
1.2.3...................................... TRASVASE DEL RO PALCA AL A CUENCA DEL RO MOLLOCO
9
1.3 UBICACIN.......................................................................................10
1.3.1.................................................................................... UBICACIN GEOGRFICA
10
1.3.2................................................................................................. ACCESIBILIDAD
11
1.4 CARACTERISTICAS CLIMATOLGICAS..................................................12
1.4.1............................................................................. CARACTERIZACIN CLIMTICA
12
1.4.2............................................................................ TEMPERATURAS AMBIENTALES
13
1.4.3....................................................................................................... HUMEDAD
14
1.4.4..................................................................................... VELOCIDAD DEL VIENTO
15
1.4.5.............................................................................................. PRECIPITACIONES
16
1.4.6......................................................................... EVAPORACIN EN LOS EMBALSES
17
1.5 CARACTERSTICAS TOPOGRAFICA Y DE RELIEVE..................................18

2.

CAPTULO 2: DEMANDA DE AGUA POTABLE....................................................

2.1
2.2
2.3
2.4

REA DE INFLUENCIA.........................................................................19
ESTIMACIN DE LA POBLACIN TOTAL...............................................20
ESTIMACIN DE LA POBLACIN TOTAL URBANA Y RURAL....................25
DEMANDA DE AGUA POTABLE, PROYECCION A 9 AOS.........................28

3.

CAPTULO 3: DEMANDA AGRCOLA...................................................................

3.1 PRODUCCIN AGROPECUARIA............................................................31


3.2 TEMPERATURA MEDIA DE IRRIGACIN................................................31
3.3 HORAS DE LUZ..................................................................................32
3.4 USO CONSUNTIVO.............................................................................32
3.4.1 COEFICIENTES CONSUNTIVOS......................................................................................
3.4.2 ESTIMACIN DEL USO CONSUNTIVO..............................................................................
3.5 TIPOS DE CULTIVO.............................................................................34
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

3.5.1 CULTIVO DE ARROZ..................................................................................................


CULTIVO DE ARROZ...................................................................................34
CULTIVO DE PAPA......................................................................................35
3.6 DEMANDA DE RIEGO..........................................................................36

4.

CAPTULO 4: OFERTA HDRICA...........................................................................

4.1
4.2
4.3
4.4

OBJETIVO..........................................................................................37
ESTIMACIN DE CAUDALES................................................................37
CAUDAL ECOLOGICO (DEL RIO MOLLOCO)...............................................54
CURVA MASA....................................................................................56

5.

CAPITULO 5: INGENIERA DEL PROYECTO.......................................................

5.1 OBRAS DE ALMACENAMIENTO............................................................69


5.2 OBRAS DE CABECERA........................................................................70
5.2.1 TOMA DE LA CH SORO.............................................................................................
5.2.2 PRESAS..................................................................................................................
5.2.3 DESARENADOR........................................................................................................
5.3 OBRAS DE ADUCCIN Y CONDUCCIN.................................................74
5.3.1 OBRAS DE ADUCCIN Y CONDUCTO FORZADO DE LA CENTRAL LLATICA................................
5.3.2 OBRAS DE ADUCCIN Y CONDUCTO FORZADO DE LA CENTRAL SORO..................................
5.4 ALIVIADEROS....................................................................................79
5.5 OBRAS HIDRAULICAS.........................................................................83
5.5.1 OBRAS HIDRULICAS EN LA PRESA MACHUCOCHA...........................................................
5.5.2 OBRAS HIDRULICAS EN LA PRESA MOLLOCO.................................................................
5.5.3 OBRAS HIDRULICAS EN LA PRESA JAPO........................................................................
5.6 TRANSPORTE DE SEDIMENTOS............................................................................
5.7 EQUIPO HIDRAULICO.........................................................................89

6.

CONCLUSIONES...................................................................................................

7.

RECOMENDACIONES...........................................................................................
NDICE DE CUADROS

Cuadro N 1 Distancia en kilmetros entre las principales localidades cercanas al


proyecto....................................................................................................................
Cuadro N 2 Caractersticas de las estaciones climatolgicas utilizadas........................................
Cuadro N 3 Valores de temperatura para las estaciones de Chivay, Sibayo y Condorama
.................................................................................................................................
Cuadro N 4 Valores de humedad relativa para las estaciones de Angostura Chivay,
Sibayo......................................................................................................................
Cuadro N 5 Valores caractersticos de intensidad del viento para las estaciones de
Angostura y Sibayo..................................................................................................
Cuadro N 6 Precipitacin mensual y total anual (mm) para las estaciones pluviomtricas
.................................................................................................................................
Cuadro N 7 Evaporacin real, evapotranspiracin real y evaporacin neta para los
embalses..................................................................................................................
Cuadro N 8 Poblacin total de Arequipa........................................................................................
Cuadro N 9 proyeccin al 2025 Caylloma...................................................................................
Cuadro N 10 proyeccin al 2025 Castilla....................................................................................
Cuadro N 11 proyeccin al 2025 Caman...................................................................................
Cuadro N 12 proyeccin de la poblacin rural al 2025 - Caman..................................................
Cuadro N 13 proyeccin de la poblacin urbana al 2025 - Caman..............................................
Cuadro N 14 proyeccin de la poblacin rural al 2025 - Castilla....................................................
Cuadro N 15 proyeccin de la poblacin urbana al 2025 - Castilla................................................
Cuadro N 16 proyeccin de la poblacin rural al 2025 - Caylloma.................................................
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 17 proyeccin de la poblacin urbana al 2025 - Caylloma.............................................


Cuadro N 18 Tabla del procesamiento de datos - Caylloma..........................................................
Cuadro N 7 Tabla del procesamiento de datos Demanda Caylloma...........................................
Cuadro N 20 Tabla del procesamiento de datos - Castilla..............................................................
Cuadro N 21 Tabla del procesamiento de datos - Caman............................................................
Cuadro N 22 Tabla de la temperatura por estaciones....................................................................
Cuadro N 23 Tabla de horas luz.....................................................................................................
Cuadro N 24 Coeficientes de uso consuntivo................................................................................
Cuadro N 25 Tabla de precipitaciones efectivas a partir de las precipitaciones promedio
mensual....................................................................................................................
Cuadro N 26 Uso consuntivo del arroz- primer mtodo.................................................................
Cuadro N 27 Uso consuntivo del arroz- segundo mtodo..............................................................
Cuadro N 28 Uso consuntivo de papa- primer mtodo..................................................................
Cuadro N 29 Uso consuntivo de papa- segundo mtodo...............................................................
Cuadro N 30 Demanda de riego primer mtodo.........................................................................
Cuadro N 31 Demanda de riego segundo mtodo......................................................................
Cuadro N 32 Caudales mensuales (m3/s), 1965 - 2007................................................................
Cuadro N 33 Resumen de probabilidades mensuales...................................................................
Cuadro N 34 Balance hdrico.........................................................................................................
Cuadro N 35 Caractersticas del embalse Machucocha.................................................................
Cuadro N 36 Caractersticas del embalse Molloco........................................................................
Cuadro N 37 Caractersticas del embalse Japo.............................................................................
Cuadro N 38 Caractersticas de la presa Machucocha..................................................................
Cuadro N 39 Caractersticas de la presa Molloco..........................................................................
Cuadro N 40 Caractersticas de la presa Japo - CG......................................................................
Cuadro N 41 Caractersticas de la Japo - CFRD...........................................................................
Cuadro N 42 Volumen de sedimentos............................................................................................
Cuadro N 43 Cuadro de clculo cargas........................................................................................
Cuadro N 44 perdidas de energa..................................................................................................
Cuadro N 45 Clculo de cargas.....................................................................................................
Cuadro N 46 Radio con respecto a la profundidad........................................................................
Cuadro N 47 Caractersticas de la atagua Presa Molloco..........................................................
Cuadro N 48 Caractersticas de la atagua Presa Japo..............................................................
Cuadro N 49 Volumen de sedimentos............................................................................................
Cuadro N 50 Estudio mineralgico.................................................................................................

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

INDICE DE GRFICOS
Grfico N 1 Central Hidroelctrica Molloco......................................................................................
Grfico N 2 Departamento de Arequipa y la cuenca del Ro Molloco.............................................
Grfico N3 Cuenca del Ro Molloco, localizacin de los embalses, centrales y transvase.
.................................................................................................................................
Grfico N4 Ubicacin de las estaciones climatolgicas y cuenca del Ro Molloco........................
Grfico N5 Valores medio mensuales para las estaciones de Chivay, Sibayo y
Condorama...............................................................................................................
Grfico N 5 Valores promedio de humedad relativa para las estaciones de Angostura
Chivay, Sibayo..........................................................................................................
Grfico N 7 Cuencas de Arequipa indicando la Cuenca de Cmana.............................................
Grfico N 8 Cuenca de ro Molloco................................................................................................
Grfico N 9 Demanda de Caylloma................................................................................................
Grfico N 10 Demanda de Castilla.................................................................................................
Grfico N 11 Demanda de Caman...............................................................................................
Grfico N 12 Hidrograma de caudales anuales (m3/s)...................................................................
Grfico N 13 Curva de persistencia, Enero....................................................................................
Grfico N 14 Histograma de caudales, Enero................................................................................
Grfico N 15 Curva de persistencia, Febrero.................................................................................
Grfico N 16 Histograma de caudales, Febrero.............................................................................
Grfico N 17 Curva de persistencia, Marzo....................................................................................
Grfico N 18 Histograma de caudales, Marzo................................................................................
Grfico N 19 Curva de persistencia, Abril.......................................................................................
Grfico N 20 Histograma de caudales, Abril...................................................................................
Grfico N 21 Curva de persistencia, Mayo.....................................................................................
Grfico N 22 Histograma de caudales, Mayo.................................................................................
Grfico N 23 Curva de persistencia, Junio.....................................................................................
Grfico N 24 Histograma de caudales, Junio.................................................................................
Grfico N 25 Curva de persistencia, Julio......................................................................................
Grfico N 26 Histograma de caudales, Julio..................................................................................
Grfico N 27 Curva de persistencia, Agosto...................................................................................
Grfico N 28 Histograma de caudales, Agosto...............................................................................
Grfico N 29 Curva de persistencia, Setiembre.............................................................................
Grfico N 30 Histograma de caudales, Setiembre.........................................................................
Grfico N 31 Curva de persistencia, Octubre.................................................................................
Grfico N 32 Histograma de caudales, Octubre.............................................................................
Grfico N 33 Curva de persistencia, Noviembre............................................................................
Grfico N 34 Histograma de caudales, Noviembre........................................................................
Grfico N 35 Curva de persistencia, Diciembre.............................................................................
Grfico N 36 Histograma de caudales, Diciembre.........................................................................
Grfico N 37 Curvas de duracin mensual.....................................................................................
Grfico N 38 Curvas de variacin anual.........................................................................................
Grfico N 38 Caudal ecolgico (m3/s)............................................................................................
Grfico N 40 Curva masa 1965-2007.............................................................................................
Grfico N 41 Diagrama del proyecto..............................................................................................
Grfico N 42 Histograma de caudales mensuales.........................................................................
Grfico N 43 Curva de duracin.....................................................................................................
Grfico N 44 Vista en planta del tnel de aduccin de la CH Llatica..............................................
Grfico N 45 Vista del corte A Grfico N 46 Vista del corte B......................................................
Grfico N 47 Vista del corte C........................................................................................................
Grfico N 48 Dimensionamiento de la chimenea de equilibrio Llatica............................................
Grfico N 49 Dimensionamiento de la chimenea de equilibrio Soro..............................................
Grfico N 50 Seccin tpica de aliviadero.......................................................................................
Grfico N 51 Perfil de entrada del aliviadero..................................................................................
Grfico N 52 Relacin caudal solido-caudal lquido en puente Huaruro........................................

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

CENTRAL HIDROELECTRICA MOLLOCO


INTRODUCCIN
La central hidroelctrica Molloco es un proyecto a futuro, ubicado en Arequipa. En el
2013 se adjudic el proyecto al consorcio Generadora Elctrica Molloco SAC. Dicho
consorcio se encargar del diseo, construccin, financiamiento, operacin y
mantenimiento de esta obra. La inversin estimada para el proyecto es de $600
millones.
Este proyecto aumentar la produccin elctrica nacional en 302 MW; asimismo, la
Empresa de Generacin Elctrica de Arequipa S.A (EGASA) recibir el 9.2% de la
produccin
de
este
central.
(Fuente:
PROINVERSION,
http://www.proinversion.gob.pe/)
El siguiente trabajo rene informacin necesaria para el estudio de los recursos
hdricos del proyecto, y toma como fuente el informe hidrometereolgico elaborado
para la central hidroelctrica en estudio.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

CAPTULO I: GENERALIDADES

1.1

OBJETIVOS

El objetivo del presente informe es investigar sobre la Central Hidroelctrico Molloco,


con el fin de dar a conocer informacin relevante sobre el proyecto, interpretar los
datos, concluir y recomendar acerca de la misma.
La informacin presentada ser la siguiente:

Descripcin general de la CH Molloco.

Caractersticas topogrficas y climatolgicas de la cuenca del Ro Molloco.

Demanda del agua potable.

Demanda de irrigaciones.

Oferta del agua de la cuenca del Ro Molloco.

Ingeniera del proyecto: Obras de cabecera, obras de conduccin, obras de


almacenamiento, presas, obras hidrulicas, entre otros

1.2

DESCRIPCIN GENERAL DEL PROYECTO

La Central Hidroelctrica Molloco est ubicada en la provincia de Caylloma, Arequipa.


Est previsto para ser implantado en la cuenca del Ro Molloco, que pretende
aprovechar una cada de 2 200 m aproximadamente.
De manera general, podemos mencionar que la CH Molloco presentar 3 embalses, 3
presas, 2 tneles de aduccin, 2 chimeneas de equilibrio, una tubera forzada, 2
piques (pozos verticales), 2 centrales en caverna, instalaciones de transmisiones
elctrica y 58km de carreteras de acceso.
La CH utilizar aguas de tres embalses: Machucocha, Molloco y Japo, con una
capacidad total de 290 MMC que generar 302 MW, por lo que se construir dos
centrales de generacin: CH Llatica (144MW) y CH Soro (158 MW)
El proyecto contempla la conexin de la CH Llatica a la CH Soro mediante la L.T. 30
kV Llatica-Soro de simple terna, con una longitud de 6,48 km y una capacidad de
transporte de 180 MVA. Ambas centrales se conectarn a la subestacin Cerro
Verde a travs de la L.T. 220 kV SoroHuambo en doble terna, con una longitud de
20,7 km
Existe la posibilidad de ejecutarse un trasvase de agua del Rio Palca, para
incrementar la produccin energtica.
Grfico N 1 Central Hidroelctrica Molloco
1.2.1
1.2.1.1

Embalses
Embalse Machucocha

Para este embalse se ha planeado una presa de tierra, de relleno zonificado, con una
estructura de concreto, de 10 m de altura, aproximadamente.
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

El embalse tiene una capacidad til de 60 MMC.


1.2.1.2

Embalse Molloco

Para este embalse se ha planeado una presa de material suelto, con una pantalla de
concreto de 52 m de altura mxima y 400 m de longitud de cresta.
Este embalse incluye un tnel de desvo por la margen derecha.
La capacidad til del embalse es de 140 MMC.
1.2.1.3

Embalse Japo

Para este embalse se ha planeado una represa mixta, con la parte central de concreto
con 62 m de altura mxima y diques en material suelto con 10 m de altura mxima,
con una pantalla de inyecciones para el sellado de la roca de cimentacin.
La capacidad til del embalse es de 90 MMC.
1.2.2
1.2.2.1

Centrales Hidroelctricas
Casa de Mquinas Llatica

La casa de mquinas Llatica se encuentra en subterrneo, con un tnel de aduccin,


una chimenea de equilibrio, y luego una tubera a presin que llega a dicha casa de
mquinas. Se encuentra unos 160 m dentro de la ladera derecha del ro Huaruro,
aproximadamente 4 km aguas arriba del pueblo de Llatica. Est constituida por dos
cavernas paralelas.
En la caverna principal se ubican equipos de generacin, el rea de montaje, la sala
de mando de la central y los diferentes equipos auxiliares. Esta caverna tiene 18.30 m
de ancho, 51 m de longitud y 33 m de altura total, aproximadamente.
En la otra caverna se ubican los transformadores y la subestacin. Esta caverna tiene
11 m de ancho, 51 m de longitud y 12 m de altura total, aproximadamente.
En la Central Hidroelctrica Llatica el caudal total ser de 16.4 m3/s.
El salto neta de la C.H. Llatica es de aproximadamente 1 030 m.
1.2.2.2

Casa de Mquinas Soro

La casa de mquinas Soro se encuentra en subterrneo, con un tnel de aduccin,


una chimenea de equilibrio, y luego una tubera forzada al exterior que emplama a
dicha casa de mquinas. Se encuentra unos 300 m dentro de la ladera derecha del
Colca, aproximadamente 1 km aguas debajo de la confluencia con el ro Huaruro. Est
constituida por dos cavernas paralelas.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

En la caverna principal se ubican equipos de generacin, el rea de montaje, la sala


de mando de la central y los diferentes equipos auxiliares. Esta caverna tiene 18.30 m
de ancho, 51 m de longitud y 33 m de altura total, aproximadamente.
En la otra caverna se ubican los transformadores y la subestacin. Esta caverna tiene
11 m de ancho, 51 m de longitud y 12 m de altura total, aproximadamente.
En la Central Hidroelctrica Llatica el caudal total ser de 16.4 m3/s.
El salto neta de la C.H. Soro es de aproximadamente 1 140 m.
1.2.3

Trasvase del ro Palca al a cuenca del ro Molloco

Para incrementar el aprovechamiento hidroelctrico de Molloco, se prev derivar un


caudal adicional proveniente del ro Palca.
Se calcul un incremento de caudal firme de 1.1 m3/s, del mismo modo, un incremento
de produccin de energa promedio y firme del 10%.
El esquema de trasvase de los aportes del ro Palca est conformado por una obra de
captacin en dicho ro, situada en la elevacin 4507 m.s.n.m, desde donde se elevan
los caudales derivados hasta el nivel 4778 m.s.n.m.

1.3

UBICACIN

1.3.1

Ubicacin geogrfica

La Central Hidroelctrica Molloco estar ubicada en la cuenca del Ro Molloco.


La cuenca del Ro Molloco se localiza en la regin de la Sierra Sur del Per, en
Arequipa, entre las provincias de Castilla y Caylloma. Se situa entre las longitudes
7142 y 7213 Oeste, y latitudes 1458 y 1535 Sur. Abarca un rea de drenaje con
aproximadamente 1.570 km.
La siguiente figura muestra la localizacin del departamento de Arequipa, achurado de
rojo, y una ampliacin de la cuenca en estudio, achurada de amarillo.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 2 Departamento de Arequipa y la cuenca del Ro Molloco


La cuenca del Ro Molloco es una sub-cuenca de la cuenca del Ro Caman (o Colca),
la cual tiene aproximadamente 17.000 km de superficie.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

10

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N3 Cuenca del Ro Molloco, localizacin de los embalses, centrales y


transvase.

1.3.2

Accesibilidad

Desde la ciudad de Lima, se puede acceder al rea del proyecto por dos medios de
transporte: terrestre, a travs de la carretera panamericana sur, aproximadamente a 1
009 km; y por va rea, llegando al aeropuerto Rodrguez Balln.
Desde Arequipa se llega al rea del proyecto mediante carretera hasta la ciudad de
Chivay; luego se contina por carretera afirmada hasta los embalses proyectados
Machucocha, Mollocoy Japo. A las casas de mquinas proyectadas se llega desde
Chivay mediante una carretera afirmada hasta el pueblo de Cabanaconde, y luego se
continua hasta el rio Colca mediante una trocha carrozable; desde aqu se cruza el rio
Colca por un puente colgante y se continua por un camino de psimas condiciones
hasta llegar a la CH proyectada Soro y luego a la CH proyectada Llatica.
El acceso hacia los pueblo de Tapay y Chocoes a mediante caminos de herradura,
desde la margen izquierda del rio Colca.
El siguiente cuadro presenta las distancias entre las principales localidades aledaas
al proyecto.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

11

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 1 Distancia en kilmetros entre las principales localidades cercanas al


proyecto

Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco, 2015

1.4
1.4.1

CARACTERISTICAS CLIMATOLGICAS
Caracterizacin climtica
La cuenca del Ro Molloco se ubica en la regin sierra del Per. La regin ocupa
391.880 km2, que representa el 30.5% de la superficie del pas; presenta, en
general, un clima frio y seco.
La cuenca del Ro Molloco se ubica en la regin sierra. Segn la clasificacin
internacional de Keppen la regin presenta cuatro de los 11 tipos principales de
clima, por lo que presenta las siguientes variabilidades climticas:
Clima templado subhmedo (estepa y valles interandinos bajos):
temperatura promedia es 20C, con lluvias estacionales. Este clima se
presenta en la zona andina y fundamentalmente se da en los valles
interandinos ubicados entre los 1.000 y 3.000 m.s.n.m.
Clima fro o boreal (valles mesoandinos): temperatura promedia es 12C,
veranos lluviosos e inviernos secos con fuertes heladas. Este clima
corresponde a la zona andina entre los 3.000 y 4.000 m.s.n.m.
Clima frgido (tundra): temperatura promedia es 6C, con veranos muy
fros y secos. Este clima corresponde a la zona andina entre los 4.000 y
5.000 m.s.n.m.
Clima de nieve (glido): temperatura promedio es 0C o menores. Este
clima corresponde a la zona andina desde los 5.000 m.s.n.m. a ms.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

12

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Para la siguiente informacin climatolgica de la regin de estudio se utilizaron


estaciones climatolgicas cercanas a la regin: Sibayo,Chivay, Angostura,
Condorama Reservorio y Pane. (Estudio Hidrometereolgico de la CH Molloco,
2015) La ubicacin de dichas estaciones se presenta en la siguiente grfico:

Grfico N4 Ubicacin de las estaciones climatolgicas y cuenca del Ro Molloco

Asimismo, el siguiente cuadro presenta las informaciones existentes en cada estacin


climatolgica utilizadas.
Cuadro N 2 Caractersticas de las estaciones climatolgicas utilizadas

Fuente: Estudio hidrometereologico de la central hidroelectrica Molloco, 2015.


1.4.2

Temperaturas Ambientales

La temperatura en esta regin presenta un compartamiento tpico durante el ao. En el


mes de julio se presente el menor registro de temperatura, y entre los meses de enero
a marzo, el mayor.
La altitud est directamente relacionada con la temperatura. Por ello, en la estacin
ms alta, la de Condorama Reservorio, se presenta una temperatura anual de 5,1C;
esta estacion retrata el clima frgido de las regiones mayor a 4 000 m.s.n.m. Las
estaciones de Chivay y Sibayo presentan temperaturas medias anuales de 9,8C y
8,2C, respectivamente, estas estaciones retratan el clima frio de las regiones mayor a
3 000 m.s.n.m.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

13

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

El siguiente cuadro presenta las temperaturas caractersticas de las 3 estaciones


mencionadas para cada mes del ao.
Cuadro N 3 Valores de temperatura para las estaciones de Chivay, Sibayo y
Condorama

Fuente: Estudio hidrometereologico de la CH Molloco, 2015.

Asimismo, el siguiente grafico se muestra los valores medio mensuales de cada


estacin.

Grfico N5 Valores medio mensuales para las estaciones de Chivay, Sibayo y


Condorama
1.4.3

Humedad

Debido a la altitud y la conformacin geogrfica climtica de la regin, la humedad


relativa no tiene muchas variaciones durante el ao. En las tres estaciones con datos
disponibles de esa variable, se tiene una humedad media anual de 56% en Angostura
y de 59% en Chivay y Sibayo. Se encontraran valores mnimos de 31%, 28% y 32%
(en el invierno), y mximos de 80%, 72% y 90% (en el verano) en las estaciones de
Angostura, Chivay y Sibayo, respectivamente.
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

14

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

El siguiente cuadro presenta los valores caractersticos de humedad relativa.


Cuadro N 4 Valores de humedad relativa para las estaciones de Angostura Chivay,
Sibayo.

Fuente: Estudio hidrometereologico de la CH Molloco, 2015

Asimismo, el siguiente grafico presenta la distribucin temporal de la humedad media


a lo largo del ao para las tres estaciones.

Grfico N 5 Valores promedio de humedad relativa para las estaciones de


Angostura Chivay, Sibayo.

1.4.4

Velocidad del viento

Segn el Atlas Elico del Per para el departamento de Arequipa, desarrollado por el
Ministerio de Energa y Minas, el viento medio anual, medido a 50, 80 y 100 m del
suelo, asume valores entre 2 a 6 m/s en la regin en estudio, sin muchas variaciones
de esa intensidad a lo largo del ao.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

15

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Los vientos dominantes en Arequipa son alisios de Sureste y depende de la circulacin


Anticiclnica del Pacifico Sur; presentan una direccin caracterstica en el sentido
Noreste.
En el siguiente cuadro se presentan los valores caractersticos de la intensidad del
viento de las estaciones Angostura y Sibayo.
Cuadro N 5 Valores caractersticos de intensidad del viento para las estaciones de
Angostura y Sibayo.

Fuente: Estudio hidrometereologico de la CH Molloco, 2015

1.4.5

Precipitaciones

En la regin del estudio no hay estaciones pluviomtricas, as se utiliz una correlacin


entre precipitacin x altitud con las estaciones seleccionadas para una evaluacin de
la cuantidad media de lluvia en la regin estudiada. Se sabe que la precipitacin, as
como la temperatura, es una variable ntimamente relacionada con la altitud.
El siguiente cuadro presenta la precipitacin mensual y total anual para las 15
estaciones utilizadas.
Cuadro N 6 Precipitacin mensual y total anual (mm) para las estaciones
pluviomtricas

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

16

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Fuente: Estudio hidrometereologico de la CH Molloco, 2015

A partir de la relacin obtenida, y teniendo en cuenta que la cuenca en estudio y los


sitios de inters presentan una altitud media de 4.730 m.s.n.m., se estima una
precipitacin media del orden de poco ms de 800 mm/ao.
1.4.6

Evaporacin en los embalses

La evaporacin neta en los embalses es el balance entre evaporacin de la superficie


liquida en el embalse (evaporacin real multiplicada por el coeficiente tanque) y la
evapotranspiracin real en la cuenca, pudiendo resultar en un valor positivo o
negativo. Un valor positivo significa que despus de la implantacin del embalse en el
sitio, la evaporacin real es mayor que la evapotranspiracin real que exista antes de
la implantacin de ese embalse.
En el siguiente cuadro se presentan los valores caractersticos de evaporacin real,
evapotranspiracin real y evaporacin neta para los embalses.
Cuadro N 7 Evaporacin real, evapotranspiracin real y evaporacin neta para los
embalses

Fuente: Estudio hidrometereologico de la CH Molloco, 2015

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

17

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1.5

CARACTERSTICAS TOPOGRAFICA Y DE RELIEVE

El estudio geomorfolgico del Estudio de Impacto Ambiental de la Central


Hidroelctrica Molloco descrbela superficie de la zona en estudio, donde se ha
conjugado informacin de los cambios climticos, litolgicos y estructurales.
El relieve actual de la zona es producto de los factores anteriormente indicados, y en
cuanto al relieve que presenta se han encontrado las siguientes caractersticas:

Presencia de cadenas montaosas. Refiere a las partes altas de la cuenca del


rio Molloco, est comprendida de montaas, crestas aguas divididas por
sistemas de drenaje, modelado sobre unidades geolgicas de origen volcnico.
Se encuentran a ms de 5 000 m.s.n.m.

La cuenca alta del rio Molloco est conformada por un relieve semi ondulado
con formas de lagunas alargadas, lomas bajas de cumbres aplanadas con
bofedales.

La cuenca media del rio Molloco est conformada por un relieve semi plano,
limitado pro escarpes hacia el cauce del rio Molloco y quebradas que confluyen
en el cauce principal.

El valle fluvioglaciar est conformado por un relieve bajo conformas de laderas


suaves y terrazas semi planas con bordes escarpados.

El relieve Can est formado por el rio Huaruro y rio colca. Alcanza
profundidades de ms de 1 km con un ancho promedio del cauce que vara
entre 50 a 100 metros.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

18

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

2
1.6

CAPTULO 2: DEMANDA DE AGUA POTABLE


REA DE INFLUENCIA

El rea de la cuenca de Molloco comprende una extencion de 665 km2 y es una


subcuenca del rio Camana que se encuentra en el distrito Chivay, provincia de
Caylloma en el departamento de Arequipa. Asimismo, comprende los distritos de de
Canlayocmayo, Llactatuyo, Illigua, Huaytamayopela, Silque, Huauro los cuales
comprenden el rea directa. demas, colinda con Cabanaconde, Maca, Achoma,
Chivay y Yanque que son las que colindan.
Sub Distrito de Riego Regulado que se ubica directamente en Cmana, ya que la
cuenca de Cmana se beneficia directamente de los recursos hidricos de la zona.
Asimismo, el Proyecto Molloco con un total de
70 000 hectarias de riego
aproximadamente lo cual beneficiara a 200 000 pobladores de las zonas de Cmana,
Castilla y Caylloma.

Cuenca
de
Cmana

Grfico N 7 Cuencas de Arequipa indicando la Cuenca de Cmana

Grfico N 8 Cuenca de ro Molloco


PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

19

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Sub distritos de riego no regulado, que comprende los territorios del embalse de
Machucocha. Distritos como la provincia de Caylloma y Orcopampa.
1.7

ESTIMACIN DE LA POBLACIN TOTAL

Departamento de Arequipa

P o b lac i n c e s ad a t o t al
14000
12000
10000
8000
6000
4000
2000
0

1940 1961 1972 1981 1993 2007 2012


Poblacin Total

Tasa Poblacional

Cuadro N 8 Poblacin total de Arequipa

Los mtodos ms conocidos para la estimacin del crecimiento de la poblacin


(estimacin de la poblacin futura) utilizados:

Mtodo Grfico
Mtodo del Crecimiento Artimtico
Mtodo del Crecimiento Geomtrico

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

20

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Mtodo grfico:
CAYLLOMA

Fuente: INEI
CASTILLA

Fuente: INEI
CMANA

FUENTE: INEI

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

21

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Mtodo del crecimiento aritmtico y geomtrico:


Para este mtodo se utiliz las siguientes formulas
Aritmtico

Pt = Po + Ka t
Pt = poblacin futura despus de t aos
Po = poblacin presente
t = periodo de proyeccin

Geomtrico

Se tomaron los datos del INEI y sus proyecciones que se tomaron en cuenta
para tener ms datos.
A continuacin se muestran las tablas con las proyecciones al 2025, para las
influyentes de la cuenca de Caman.

CAYLLOMA
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

22

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 9 proyeccin al 2025 Caylloma

Fuente: Elaboracin propia


CASTILLA
Cuadro N 10 proyeccin al 2025 Castilla

Fuente: Elaboracin propia

CMANA
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

23

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 11 proyeccin al 2025 Caman

Fuente: Elaboracin propia

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

24

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1.8

ESTIMACIN DE LA POBLACIN TOTAL URBANA Y RURAL


La poblacin se clasific en sector urbano y rural y se calcul de la misma manera
la poblacin futura (2025), con la ayuda del INEI. Censos del 2007 y 1993. A
continuacin, la tabla utilizada para la cantidad de habitantes en el sector rural y
urbano.
CAMANA
Rural
Cuadro N 12 proyeccin de la poblacin rural al 2025 - Caman

Fuente: Elaboracin propia

Urbana
Cuadro N 13 proyeccin de la poblacin urbana al 2025 - Caman

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

25

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Fuente: Elaboracin propia

CASTILLA

Rural
Cuadro N 14 proyeccin de la poblacin rural al 2025 - Castilla

Fuente: Elaboracin propia

Urbana

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

26

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 15 proyeccin de la poblacin urbana al 2025 - Castilla

Fuente: Elaboracin propia

CAYLLOMA
Rural
Cuadro N 16 proyeccin de la poblacin rural al 2025 - Caylloma

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

27

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Fuente: Elaboracin propia

Urbana
Cuadro N 17 proyeccin de la poblacin urbana al 2025 - Caylloma

Fuente: Elaboracin propia

1.9

DEMANDA DE AGUA POTABLE, PROYECCION A 9 AOS


Para determinar la demanda de agua se clasifico en sectores urbanos y rurales y
como cantidad de agua (lts/hab/dia) se recurri al uso de una boleta de agua para
saber aproximadamente la cantidad de agua establecida promedio (250 para
urbano y 120 para rural), la cual para determinar en los siguientes meses del ao
se multiplico por un factor proporcional al consumo de agua por mes de un
ciudadano tanto para rural como urbano. (https://www.osinergmin.gob.pe)
CAYLLOMA

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

28

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 18 Tabla del procesamiento de datos - Caylloma

Cuadro N 7 Tabla del procesamiento de datos Demanda Caylloma

Grfico N 9 Demanda de Caylloma

CASTILLA
Cuadro N 20 Tabla del procesamiento de datos - Castilla

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

29

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 10 Demanda de Castilla

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

30

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

CAMANA
Cuadro N 21 Tabla del procesamiento de datos - Caman

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

31

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 11 Demanda de Caman

CAPTULO 3: DEMANDA AGRCOLA

1.10
PRODUCCIN AGROPECUARIA
La produccin agrcola del lugar aguas abajo es a base de los cultivos de arroz, caa
de azcar, maz, menestras, hortalizas, yuca, camote, pastos,legunbres , son los que
ocupan mayores reas, llegando a cultivarse en arroz hasta 17 575 ha y de papa 10
360ha fuente de la Gerencia General de Agricultura de Arequipa. Tomando de punto el
rea efectiva que es Caman.
El uso de las aguas con fines agrarios es a travs de las asignaciones de agua a los
usuarios, sea bajo el rgimen de licencias o permisos, otorgados por la Administracin
Tcnica del Distrito de Riego y se considerara una eficiencia del 85%.
1.11
TEMPERATURA MEDIA DE IRRIGACIN
Las temperatura se obtuvieron de las estaciones pertinentes y se tomaron las medidas
de los lugares de Caman, ya que es el rea efectiva y la cual es ms incidente. Las
reas de cultivo se obtuvieron con las proporciones de cultivo ms altas.
Cuadro N 22 Tabla de la temperatura por estaciones

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

32

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Fuente: SENAMHI

1.12
HORAS DE LUZ
A continuacin se muestra el porcentaje de horas de sol diario para el proyecto.
Cuadro N 23 Tabla de horas luz

Fuente: SENAMHI

1.13

USO CONSUNTIVO

3.4.1
Coeficientes consuntivos
Los coeficientes consuntivos sern para el arroz de 1.2 y para la papa de 0.65.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

33

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 24 Coeficientes de uso consuntivo

FUENTE: Ven te Chow

3.4.2

Estimacin del uso consuntivo


PRIMER METODO: Mtodo Blaney Criddle

SEGUNDO METODO: Mtodo Blaney Criddle modificado por Phelan

3.4.3 Precipitacin
Estos datos fueron extrados del Informe hidrometereolgico de la central
hidroelctrica Molloco, del cual de las siguientes estaciones se obtuvieron las
precipitaciones.
Cuadro N 25 Tabla de precipitaciones efectivas a partir de las precipitaciones promedio
mensual
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

34

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

pp (mm)

Pe (mm)

193.70
184.30
146.10
51.60
11.10
4.60
3.90
10.20
19.80
30.70
50.70
118.10

129.96
122.44
91.88
20.96
0.00
0.00
0.00
0.00
1.88
8.42
20.42
69.48

Fuente: Elaboracion propia


La precipitacin efectiva se tom de una relacin encontrada en un portal de internet
de la ingeniera agroforestal.

1.14
3.5.1

TIPOS DE CULTIVO
Cultivo de arroz

CULTIVO DE ARROZ
Primer mtodo
Cuadro N 26 Uso consuntivo del arroz- primer mtodo

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

35

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Fuente: Elaboracin propia

Segundo mtodo
Cuadro N 27 Uso consuntivo del arroz- segundo mtodo

Fuente: Elaboracin propia

CULTIVO DE PAPA
Primer mtodo
Cuadro N 28 Uso consuntivo de papa- primer mtodo

Fuente: Elaboracin propia

Segundo mtodo
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

36

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 29 Uso consuntivo de papa- segundo mtodo

Fuente: Elaboracin propia

1.15

DEMANDA DE RIEGO

Cuadro N 30 Demanda de riego primer mtodo

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

37

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Fuente: Elaboracin propia

Cuadro N 31 Demanda de riego segundo mtodo

Fuente: Elaboracin propia

CAPTULO 4: OFERTA HDRICA

En este captulo se calcula la oferta hdrica del ro Molloco, el cual ser derivado para
satisfacer la demanda hdrica calculada en el captulo anterior.
Para poder conocer la oferta que proporcionar el ro, tenemos que medir el caudal
que presenta. Y para eso se pueden utilizar los siguientes mtodos:

Mtodos Directos: los cuales se realizan utilizando flotadores, correntmetros,

trazadores, etc.
Mtodos Indirectos: se realiza utilizando la relacin nivel-caudal.

1.16

OBJETIVO

El objetivo del presente capitulo es calcular la oferta de agua que se necesita para
poder generar energa a travs de la Central Hidroelctrica y tambin para suministrar
a la poblacin en las temporadas de escasez, cuya demanda incluye aquella necesaria
para los cultivos y para sus necesidades bsicas.
1.17

ESTIMACIN DE CAUDALES

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

38

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Para poder estimar los caudales de una corriente se utilizan dos tcnicas: Informacin
Histrica e Informacin Futura.

Informacin Histrica, se basa en:


Anlisis de Hidrogramas.
Correlacin con informacin meteorolgica.
Correlacin con informacin hidrolgica de reas similares.
Informacin Futura, se basa en:
Generaciones de series hidrolgicas. Se tiene que determinar en
cunto va a aumentar la oferta a travs del tiempo.

Para poder realizar un anlisis, es necesario realizar un Histograma de Caudales y


una curva de duracin de los mismos con la finalidad de tener un historial de las
crecidas del caudal del ro.
Para nuestro proyecto, Central Hidroelctrica Molloco, hemos obtenido informacin de
los caudales (en m3/s) desde el ao 1965 hasta el 2007.

Cuadro N 32 Caudales mensuales (m3/s), 1965 - 2007

Mnimo
Media
Mximo

3.12
12.88
19.42

Fuente: Senamhi

A partir de esta informacin se obtienen los Hidrogramas de caudales:

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

39

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Hidrograma de caudales anuales m3/s


100.00
80.00
60.00

Caudal (m3/s)

40.00
20.00
07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

0.00

Ao

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

40

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 12 Hidrograma de caudales anuales (m3/s)


Fuente: Elaboracin propia

El anlisis de caudales obtenido refleja el comportamiento y la tendencia de los


mismos, se puede analizar que desde el ao 1965 donde se inicia la recoleccin de
datos (rio Molloco), en adelante, hay una disminucin del caudal bastante coherente,
producto quiz del uso que se le dio al recurso hdrico del rio, luego se aprecia un
aumento del caudal en al 1983, producto de algn fenmeno meteorolgico siendo la
opcin ms probable, lo curioso es que en ese ao se registr un fenmeno del nio lo
cual significa para la zona estudiada sequias. La tendencia luego del ao 1984 hasta
el ao 1991 es decreciente, siendo una tendencia bastante significativa. Luego la
tendencia se incrementa por dos aos para luego decrecer y repetirse el ciclo. Los
datos con los que se realiz el hidrograma fueron tomados en campo y se confa en su
validez, siendo esta la nica fuente de informacin para la realizacin del proyecto,
pero se espera siempre algn margen de error. El caso es que analizando las
tendencias se puede observar el ciclo repetitivo de la tendencia en cuanto al
incremento y decremento de caudales.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

41

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Y con esta informacin obtenemos las curvas por cada mes del ao.
ENERO:
Limite Sup.
67.80
58.40
49.00
39.60
30.20
20.80
11.40

Limite Inf
58.40
49.00
39.60
30.20
20.80
11.40
2.00

Frecuencia
1.00
2.00
5.00
8.00
7.00
11.00
9.00
43.00

Frec. Acum.
1.00
3.00
8.00
16.00
23.00
34.00
43.00

%
2%
7%
19%
37%
53%
79%
100%

Enero
80.00
60.00

Caudal (m3/s) 40.00


20.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 13 Curva de persistencia, Enero
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =
Q75 =

4.62
13.45

m3/s
m3/s

A continuacin se presenta el Histograma de Caudales

ENERO

07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

19

74

71

19

68

19

19

19

65

80
70
60
50
40
30
20
10
0

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

42

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 14 Histograma de caudales, Enero


Fuente: Elaboracin propia

FEBRERO
Limite Sup.
Limite Inf
63.86(dato
correlacionado
)
56.30
56.30
48.74
48.74
41.18
41.18
33.62
33.62
26.06
26.06
18.50
18.50
10.94
10.94
3.38

Frecuencia

Frec. Acum. %

1.0
18.00
9.00
4.00
2.00
4.00
2.00
4.00
43.00

1
18.00
27.00
31.00
33.00
37.00
39.00
43.00

2%
42%
63%
72%
77%
86%
91%
100%

Febrero
15.00
10.00

Caudal (m3/s)

5.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia

Grfico N 15 Curva de persistencia, Febrero


Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

8.08

m3/s

Q75 =

29.62

m3/s

A continuacin se presenta el Histograma de Caudales

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

43

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

FEBRERO
60
50
40
30
20
10
07

04

20

01

20

98

20

95

19

19

92

89

19

86

19

83

19

80

19

19

77

74

19

19

71

68

19

19

19

65

Grfico N 16 Histograma de caudales, Febrero


Fuente: Elaboracin propia

MARZO
Limite Sup.
81.80
70.60
59.40
48.20
37.00
25.80
14.60

Limite Inf
70.60
59.40
48.20
37.00
25.80
14.60
3.40

Frecuencia
5.00
6.00
11.00
9.00
4.00
5.00
3.00
43.00

Frec. Acum.
5.00
11.00
22.00
31.00
35.00
40.00
43.00

%
12%
26%
51%
72%
81%
93%
100%

Marzo
80.00
70.00
60.00
50.00

Caudal (m3/s) 40.00


30.00
20.00
10.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 17 Curva de persistencia, Marzo
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

11.19

m3/s

Q75 =

33.49

m3/s

A continuacin se presenta el Histograma de Caudales

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

44

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

MARZO

07

20

04

20

01

98

20

19

95

92

19

19

89

19

86

83

19

19

80

77

19

19

74

71

19

68

19

19

19

65

90
80
70
60
50
40
30
20
10
0

Grfico N 18 Histograma de caudales, Marzo


Fuente: Elaboracin propia

ABRIL
Limite Sup.
33.80
29.85
25.90
21.95
18.00
14.05
10.10

Limite Inf
29.85
25.90
21.95
18.00
14.05
10.10
6.15

Frecuencia
2.00
3.00
3.00
6.00
11.00
11.00
7.00
43.00

Frec. Acum.
2.00
5.00
8.00
14.00
25.00
36.00
43.00

%
5%
12%
19%
33%
58%
84%
100%

Abril
35.00
30.00
25.00
20.00

Caudal (m3/s) 15.00


10.00
5.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 19 Curva de persistencia, Abril
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

7.67

m3/s

Q75 =

11.83

m3/s

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

45

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

A continuacin se presenta el Histograma de Caudales

ABRIL

07

20

04

01

20

98

20

19

95

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

40
35
30
25
20
15
10
5
0

Grfico N 20 Histograma de caudales, Abril


Fuente: Elaboracin propia

MAYO
Limite Sup.
16.20
14.22
12.24
10.26
8.28
6.30
4.32

Limite Inf
14.22
12.24
10.26
8.28
6.30
4.32
2.34

Frecuencia
2.00
0.00
6.00
3.00
6.00
16.00
10.00
43.00

Frec. Acum.
2.00
2.00
8.00
11.00
17.00
33.00
43.00

%
5%
5%
19%
26%
40%
77%
100%

Mayo
15.00
10.00

Caudal (m3/s)
5.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 21 Curva de persistencia, Mayo
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

2.90

m3/s

Q75 =

4.27

m3/s

A continuacin se presenta el Histograma de Caudales

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

46

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

MAYO

07

04

20

01

20

20

98

95

19

19

92

89

19

86

19

83

19

80

19

19

77

74

19

19

71

68

19

19

19

65

18
16
14
12
10
8
6
4
2
0

Grfico N 22 Histograma de caudales, Mayo


Fuente: Elaboracin propia

JUNIO
Limite Sup.
6.30
5.71
5.12
4.53
3.94
3.35
2.76

Limite Inf
5.71
5.12
4.53
3.94
3.35
2.76
2.17

Frecuencia
4.00
1.00
5.00
7.00
14.00
5.00
7.00
43.00

Frec. Acum.
4.00
5.00
10.00
24.00
31.00
36.00
43.00

%
9%
12%
23%
56%
72%
84%
100%

Junio
6.00
4.00

Caudal (m3/s)

2.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 23 Curva de persistencia, Junio
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

2.27

m3/s

Q75 =

3.21

m3/s

A continuacin se presenta el Histograma de Caudales


PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

47

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

JUNIO
7
6
5
4
3
2
1
07

04

20

20

01

98

20

95

19

92

19

89

19

86

19

83

19

80

19

19

77

74

19

71

19

19

68

19

19

65

Grfico N 24 Histograma de caudales, Junio


Fuente: Elaboracin propia

JULIO
Limite Sup.
5.60
5.02
4.44
3.86
3.28
2.70
2.12

Limite Inf
5.02
4.44
3.86
3.28
2.70
2.12
1.54

Frecuencia
2.00
2.00
4.00
6.00
8.00
12.00
9.00
43.00

Frec. Acum.
2.00
4.00
8.00
14.00
22.00
34.00
43.00

%
5%
9%
19%
33%
51%
79%
100%

Julio
6.00
5.00
4.00

Caudal (m3/s) 3.00


2.00
1.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 25 Curva de persistencia, Julio
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

1.72

m3/s

Q75 =

2.24

m3/s

A continuacin se presenta el Histograma de Caudales


PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

48

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

JULIO
6
5
4
3
2
1

07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

Grfico N 26 Histograma de caudales, Julio


Fuente: Elaboracin propia

AGOSTO
Limite Sup.
3.90
3.43
2.96
2.49
2.02
1.55
1.08

Limite Inf
3.43
2.96
2.49
2.02
1.55
1.08
0.61

Frecuencia
4.00
5.00
7.00
6.00
8.00
9.00
4.00
43.00

Frec. Acum.
4.00
9.00
16.00
22.00
30.00
39.00
43.00

%
9%
21%
37%
51%
70%
91%
100%

Agosto
4.00
3.00

Caudal (m3/s) 2.00


1.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 27 Curva de persistencia, Agosto
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

0.84

m3/s

Q75 =

1.45

m3/s

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

49

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

A continuacin se presenta el Histograma de Caudales

AGOSTO

07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

4.5
4
3.5
3
2.5
2
1.5
1
0.5
0

Grfico N 28 Histograma de caudales, Agosto


Fuente: Elaboracin propia

SETIEMBRE
Limite Sup.
4.90
4.27
3.64
3.01
2.38
1.75
1.12

Limite Inf
4.27
3.64
3.01
2.38
1.75
1.12
0.49

Frecuencia
3.00
1.00
2.00
8.00
11.00
7.00
11.00
43.00

Frec. Acum.
3.00
4.00
6.00
14.00
25.00
32.00
43.00

%
7%
9%
14%
33%
58%
74%
100%

Septiembre
5.00
4.00
3.00

Caudal (m3/s) 2.00


1.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 29 Curva de persistencia, Setiembre
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

0.69

m3/s

Q75 =

1.29

m3/s

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

50

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

A continuacin se presenta el Histograma de Caudales

SETIEMBRE
6
5
4
3
2
1
07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

Grfico N 30 Histograma de caudales, Setiembre


Fuente: Elaboracin propia

OCTUBRE
Limite Sup.
4.00
3.48
2.96
2.44
1.92
1.40
0.88

Limite Inf
3.48
2.96
2.44
1.92
1.40
0.88
0.36

Frecuencia
3.00
3.00
5.00
8.00
5.00
9.00
10.00
43.00

Frec. Acum.
3.00
6.00
11.00
19.00
24.00
33.00
43.00

%
7%
14%
26%
44%
56%
77%
100%

Octubre
4.00
3.00

Caudal (m3/s) 2.00


1.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 31 Curva de persistencia, Octubre
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

0.47

m3/s

Q75 =

0.95

m3/s

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

51

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

A continuacin se presenta el Histograma de Caudales

OCTUBRE

07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

4.5
4
3.5
3
2.5
2
1.5
1
0.5
0

Grfico N 32 Histograma de caudales, Octubre


Fuente: Elaboracin propia

NOVIEMBRE
Limite Sup.
11.50
10.02
8.54
7.06
5.58
4.10
2.62

Limite Inf
10.02
8.54
7.06
5.58
4.10
2.62
1.14

Frecuencia
1.00
2.00
0.00
0.00
1.00
8.00
31.00
43.00

Frec. Acum.
1.00
3.00
3.00
3.00
4.00
12.00
43.00

%
2%
7%
7%
7%
9%
28%
100%

Noviembre
12.00
10.00
8.00

Caudal (m3/s)

6.00
4.00
2.00
0.00
0%

20%

40%

60%

80%

100%

Persistencia
Grfico N 33 Curva de persistencia, Noviembre
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

1.23

m3/s

Q75 =

1.43

m3/s

A continuacin se presenta el Histograma de Caudales


PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

52

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

NOVIEMBRE
14
12
10
8
6
4
2
07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

Grfico N 34 Histograma de caudales, Noviembre


Fuente: Elaboracin propia

DICIEMBRE
Limite Sup.
11.60
10.20
8.80
7.40
6.00
4.60
3.20

Limite Inf
10.20
8.80
7.40
6.00
4.60
3.20
1.80

Frecuencia
1.00
0.00
2.00
0.00
7.00
18.00
15.00
43.00

Frec. Acum.
1.00
1.00
3.00
3.00
10.00
28.00
43.00

%
2%
2%
7%
7%
23%
65%
100%

Diciembre
12.00
10.00
8.00

Caudal (m3/s)

6.00
4.00
2.00
0.00
0%

20%

40%

60%

80% 100%

Persistencia
Grfico N 35 Curva de persistencia, Diciembre
Fuente: Elaboracin propia

Caudales con probabilidad de ocurrencia de 95% y 75% respectivamente


Q95 =

2.00

m3/s

Q75 =

2.46

m3/s

A continuacin se presenta el Histograma de Caudales

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

53

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

DICIEMBRE
14
12
10
8
6
4
2
07

04

20

01

20

98

20

95

19

92

19

89

19

86

19

83

19

80

19

77

19

74

19

71

19

68

19

19

19

65

Grfico N 36 Histograma de caudales, Diciembre


Fuente: Elaboracin propia

Cuadro N 33 Resumen de probabilidades mensuales

Curva de duracin anual


Q75
Q95
Enero
13.45 4.62
Febrero
29.62 8.08
Marzo
33.49 11.19
Abril
11.83 7.67
Mayo
4.27
2.90
Junio
3.21
2.27
Julio
2.24
1.72
Agosto
1.45
0.84
Setiembre
1.29
0.69
Octubre
0.95
0.47
Noviembre
1.43
1.23
Diciembre
2.46
2.00

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

54

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Curvas de duracin mensual


60.00

Enero
Febrero

50.00

Marzo
ABRIL

40.00

Caudal [m3/S]

MAYO
JUNIO

30.00

JULIO
AGOSTO

20.00

SETIEMBRE
OCTUBRE

10.00

NOVIEMBRE
0.00
0.00%

50.00%

100.00%

DICIEMBRE

150.00%

Probabilidad [%]
Grfico N 37 Curvas de duracin mensual
Fuente: Elaboracin propia

CURVA DE VARIACIN ANUAL

N
ov
ie
m
br
e

m
br
e
Se

tie

Ju
lio

M
ay
o

95

zo

75

M
ar

En

er
o

Caudal [m3/s]

40.00
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00

Mes

Grfico N 38 Curvas de variacin anual


Fuente: Elaboracin propia

1.18

CAUDAL ECOLOGICO (Del rio Molloco)


Segn el ANA se deber cumplir con los siguientes trminos, copiado
literalmente.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

55

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

El otorgamiento, suspensin o modificacin de una licencia de uso de agua se


tramita conforme al procedimiento establecido en el Reglamento. Para ser
otorgada se requiere lo siguiente:
153.1. Se entender como caudal ecolgico al volumen de agua que se debe
mantener en las fuentes naturales de agua para la proteccin o conservacin
de los ecosistemas involucrados, la esttica del paisaje u otros aspectos de
inters cientfico o cultural.
153.2. En cumplimiento del principio de sostenibilidad, la Autoridad Nacional del
Agua, en coordinacin con el Ministerio del Ambiente, establecer los caudales
de agua necesarios que deban circular por los diferentes cursos de agua, as
como, los volmenes necesarios que deban encontrarse en los cuerpos de
agua, para asegurar la conservacin, preservacin y mantenimiento de los
ecosistemas acuticos estacionales y permanentes.
153.3. Los caudales ecolgicos se mantienen permanentemente en su fuente
natural, constituyendo una restriccin que se impone con carcter general a
todos los usuarios de la cuenca, quienes no podrn aprovecharlos bajo ninguna
modalidad para un uso consuntivo.
A. MTODO DEL 10% del caudal medio anual

QE RIO MOLLOCO=10 %x QMEDIO ANUAL


QMEDIO ANUAL =

12.88 m3/s

QE RIO MOLLOCO= 0.10 x 12.88 m3 /s


QE RIO MOLLOCO=

1.288 m3/3

B. APLICANDO EL MTODO DE RAFAEL HERAS


Es el 20% del caudal medio mensual de los tres meses ms crticos consecutivos.
Con este concepto, se tiene los siguientes caudales crticos.
Agosto
0.65
Setiembr
e
0.65
Octubre 0.72

m3/s

1983

m3/s
m3/s

Calculando el promedio de estos caudales crticos

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

56

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

0.67

0.65+ 0.65+0.72
Q prom mtodo Heras =
=
3
QE RIO MOLLOCO=

0.20 x 0.67 m 3/s


0.13 m3/s

QE RIO MOLLOCO=

Los mtodos anteriormente planteados resultan de la buena intencin y exigencia por


mantener el recurso hdrico, el cual repercute en ecosistemas, paisajismo, etc. Los
mtodos no tienen ningn asevero cientfico, pero si se puede decidir donde emplear
mtodo segn el criterio del proyectista y las condiciones ambientales del proyecto.

Caudal Ecolgico
7.00
6.00
5.00
4.00
Caudal
Mnimo
Caudal
(m3/s)

Mtodo del 10%

3.00

Mtodo Rafael Heras

2.00
1.00
0.00

Mes

Grfico N 38 Caudal ecolgico (m3/s)


Fuente: Elaboracin propia

QE RIO MOLLOCO=1.29 m /s
1.19

CURVA MASA
Cuadro N 34 Balance hdrico

MES

Qs
Qs Agua Qs
Qs
Qe(m3/
Agricultura Potable
Ecolgico Total
s)
(m3/s)
(m3/s)
(m3/s)
(m3/s)

Volum
en
entra
MMC

Volumen
BALANCE
sale
(MM3)
MMC

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

57

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1965

1966

1967

1968

1969

Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero

7.00
13.00
15.80
6.50
3.80
2.20
2.10
1.70

4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.40
2.00
2.30
3.00
2.00
9.80
26.40
8.20
3.90
2.50
1.60
0.83

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.90
0.67
2.30
4.00
8.00
43.50
78.30
27.90
11.30
6.30
5.60
3.40

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

3.70
4.00
3.30
4.30
37.90
40.20
57.40
18.70
6.50
4.60
3.80
2.90

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.90
3.20
11.50
11.60
12.50
52.60

15.58
16.74
15.88
11.04
4.50
2.99

0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

18.75
31.45
42.32
16.85
10.18
5.70
5.62
4.55

16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

6.22

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

5.36
5.96
8.04
5.36
23.71
70.71
21.25
10.45
6.48
4.29
2.22

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

2.33

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

1.79
5.96
10.71
21.43
105.24
209.72
72.32
30.27
16.33
15.00
9.11

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

9.59

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

10.71
8.55
11.52
101.51
97.25
153.74
48.47
17.41
11.92
10.18
7.77

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

7.52

44.57

0.35
0.36
0.37
0.41
0.42

1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69

8.57
29.81
31.07
33.48
127.25

49.21
45.42
34.01
16.59
11.35

2.16
20.09
16.37
-25.84
-38.03
-36.53
-38.63
-41.57
-38.35
-43.86
-39.46
-25.98
-11.24
12.35
44.76
-21.44
-37.76
-35.75
-39.97
-43.90
-42.23
-47.42
-39.46
-23.30
4.84
93.88
183.77
29.62
-17.94
-25.90
-29.26
-37.01
-34.98
-38.50
-36.87
-22.50
84.92
85.90
127.79
5.78
-30.80
-30.31
-34.08
-38.35
-37.05
-40.64
-15.61
-2.95
16.89
115.89

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

58

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1970

1971

1972

1973

Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril

41.60
16.10
4.40
3.00
2.60
2.00

8.01
14.80
16.40
14.69
14.92
15.59

2.00
1.60
2.80
5.90
48.60
53.30
40.30
18.60
10.00
5.70
4.60
3.30

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.80
2.80
3.00
4.20
16.80
48.40
37.80
10.00
5.50
3.80
2.40
1.90

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.60
1.40
1.20
4.20
50.60
49.80
72.30
11.90
3.00
6.30
4.20
1.30

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

4.40
3.80
1.60
8.00
45.20
51.80
59.10
29.10

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80

0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29

9.69
16.47
18.00
16.29
16.52
17.22

111.42
41.73
11.78
7.78
6.96
5.36

25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

5.18

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

4.29
7.26
15.80
130.17
128.94
107.94
48.21
26.78
14.77
12.32
8.84

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

7.26

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

7.50
7.78
11.25
45.00
117.09
101.24
25.92
14.73
9.85
6.43
5.09

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

4.15

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

3.75
3.11
11.25
135.53
120.48
193.65
30.84
8.04
16.33
11.25
3.48

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

11.40

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38

1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47

10.18
4.15
21.43
121.06
125.31
158.29
75.43

49.21
45.42
34.01
16.59
11.35
25.95
42.69

85.47
-0.96
-36.43
-34.46
-37.29
-40.76
-39.38
-44.93
-38.16
-18.21
113.58
117.59
81.99
5.52
-21.43
-27.46
-31.93
-37.28
-37.31
-41.71
-37.65
-22.77
28.41
105.73
75.29
-16.77
-33.48
-32.38
-37.83
-41.03
-40.42
-45.46
-42.31
-22.77
118.94
109.12
167.70
-11.85
-40.18
-25.90
-33.01
-42.64
-33.16
-39.03
-41.27
-12.59
104.47
113.96
132.34
32.74

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

59

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1974

1975

1976

1977

Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio

11.00
4.10
3.40
2.60

16.40
14.69
14.92
15.59

2.70
3.00
2.70
3.20
45.00
54.60
30.10
12.00
5.70
3.60
1.80
3.80

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

4.90
2.50
1.80
3.00
18.40
49.40
50.40
14.50
7.10
3.70
3.00
2.40

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.00
2.20
1.80
4.00
28.30
50.50
50.30
14.10
5.50
3.90
3.10
2.00

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

4.50
3.00
2.10
2.70
5.80
40.30
61.30
10.90
3.90
2.50

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69

0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29

18.00
16.29
16.52
17.22

29.46
10.63
9.11
6.96

48.21
42.23
44.25
46.12

0.33

1.29

17.19

7.00

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

8.04
7.00
8.57
120.53
132.09
80.62
31.10
15.27
9.33
4.82
10.18

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

12.70

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

6.70
4.67
8.04
49.28
119.51
134.99
37.58
19.02
9.59
8.04
6.43

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

5.18

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

5.89
4.67
10.71
75.80
122.17
134.72
36.55
14.73
10.11
8.30
5.36

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

11.66

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29

8.04
5.44
7.23
15.53
97.49
164.19
28.25
10.45
6.48

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23

-18.75
-31.61
-35.15
-39.15
-37.57
-41.18
-38.42
-25.44
103.94
120.73
54.67
-11.59
-32.94
-32.90
-39.43
-35.94
-31.87
-42.52
-40.76
-25.98
32.69
108.15
109.04
-5.11
-29.19
-32.64
-36.22
-39.69
-39.38
-43.32
-40.76
-23.30
59.21
110.81
108.77
-6.14
-33.48
-32.12
-35.95
-40.76
-32.90
-41.18
-39.98
-26.78
-1.06
86.14
138.24
-14.44
-37.76
-35.75

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

60

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1978

1979

1980

1981

Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto

1.80
1.30

14.92
15.59

1.20
0.94
2.90
2.10
36.90
33.00
13.80
15.90
5.80
3.80
2.50
1.80

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.70
1.40
2.20
5.00
15.10
16.10
50.60
11.80
4.70
3.40
2.40
1.50

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.82
0.87
1.90
2.80
10.60
9.70
59.60
11.60
4.40
3.10
2.30
0.89

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.76
0.90
1.70
2.90
67.80
56.30
23.90
14.60
6.20
3.80
2.70
3.00

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.32
0.34

1.29
1.29

16.52
17.22

4.82
3.48

44.25
46.12

0.33

1.29

17.19

3.11

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

2.52
7.52
5.62
98.83
79.83
36.96
41.21
15.53
9.85
6.70
4.82

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

4.41

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

3.75
5.70
13.39
40.44
38.95
135.53
30.59
12.59
8.81
6.43
4.02

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

2.13

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

2.33
4.92
7.50
28.39
23.47
159.63
30.07
11.78
8.04
6.16
2.38

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

1.97

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

2.41
4.41
7.77
181.60
136.20
64.01
37.84
16.61
9.85
7.23
8.04

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

-39.43
-42.64
-41.46
-46.69
-37.90
-28.39
82.24
68.48
11.01
-1.48
-32.68
-32.38
-37.56
-41.30
-40.16
-45.46
-39.72
-20.62
23.85
27.59
109.58
-12.11
-35.62
-33.42
-37.83
-42.10
-42.44
-46.88
-40.50
-26.52
11.80
12.11
133.68
-12.62
-36.43
-34.20
-38.09
-43.73
-42.60
-46.80
-41.01
-26.25
165.00
124.85
38.06
-4.85
-31.60
-32.38
-37.02
-38.08

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

61

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1982

1983

1984

1985

Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e

2.20
1.50
1.90
3.50
25.60
25.60
44.70
12.00
4.50
3.10
2.10
3.70

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

3.40
1.20
9.20
8.30
5.40
7.00
24.90
9.70
3.10
2.70
2.00
0.65

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.65
0.72
1.30
1.80
30.20
53.60
81.80
25.40
10.50
4.90
3.80
3.40

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.40
2.50
8.80
5.70
3.90
24.30
52.50
24.80
10.90
5.00
3.90
3.70
3.10

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59
15.58

0.33

1.29

17.19

5.70

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

4.02
4.92
9.37
68.57
61.93
119.72
31.10
12.05
8.04
5.62
9.91

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

8.81

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

3.21
23.85
22.23
14.46
16.93
66.69
25.14
8.30
7.00
5.36
1.74

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

1.68

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

1.93
3.37
4.82
80.89
129.67
219.09
65.84
28.12
12.70
10.18
9.11

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

6.22

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34
0.33

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22
17.19

6.70
22.81
15.27
10.45
58.79
140.62
64.28
29.19
12.96
10.45
9.91
8.04

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12
44.57

-38.86
-45.19
-40.50
-24.64
51.98
50.58
93.77
-11.59
-36.16
-34.20
-38.63
-36.21
-35.75
-46.00
-21.57
-11.78
-2.13
5.58
40.74
-17.55
-39.91
-35.23
-38.90
-44.38
-42.88
-47.28
-42.05
-29.19
64.30
118.31
193.14
23.14
-20.09
-29.53
-34.08
-37.01
-38.35
-42.52
-22.61
-18.75
-6.15
47.43
114.67
21.59
-19.02
-29.27
-33.81
-36.21
-36.53

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

62

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1986

1987

1988

1989

Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre

2.40
3.10
4.90
27.30
47.20
71.10
33.80
14.30
5.80
5.00
3.90

16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.90
2.40
2.30
3.60
32.40
21.50
14.30
7.40
2.90
2.50
1.80
1.40

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.99
2.20
2.20
4.40
17.70
44.10
61.20
26.00
10.60
5.00
4.00
2.90

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.10
2.80
2.30
3.50
23.50
46.80
42.60
13.53
5.20
3.50
2.40
2.30

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.90
2.10
2.40

15.58
16.74
15.88

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

6.43
8.04
13.12
73.12
114.19
190.43
87.61
38.30
15.03
13.39
10.45

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

7.52

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

6.43
5.96
9.64
86.78
52.01
38.30
19.18
7.77
6.48
4.82
3.75

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

2.57

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

5.89
5.70
11.78
47.41
106.69
163.92
67.39
28.39
12.96
10.71
7.77

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

5.44

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

7.50
5.96
9.37
62.94
113.22
114.10
35.07
13.93
9.07
6.43
6.16

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

4.92

44.57

0.35
0.36

1.29
1.29

18.37
17.52

5.62
6.22

49.21
45.42

-42.78
-37.39
-20.89
56.53
102.83
164.48
44.92
-9.91
-27.20
-30.86
-35.67
-37.05
-42.78
-39.46
-24.37
70.19
40.66
12.35
-23.51
-40.44
-35.75
-39.43
-42.37
-42.00
-43.32
-39.72
-22.23
30.82
95.33
137.97
24.70
-19.82
-29.27
-33.54
-38.35
-39.12
-41.71
-39.46
-24.64
46.35
101.86
88.15
-7.62
-34.28
-33.16
-37.83
-39.96
-39.64
-43.59
-39.20

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

63

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1990

1991

1992

1993

1994

Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero

5.30
20.20
27.30
24.50
9.10
3.10
2.70
1.80
1.20

11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.66
1.40
3.50
4.80
18.60
41.40
48.90
16.30
6.00
3.70
2.80
2.00

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.80
1.70
2.60
4.30
11.30
3.40
3.40
6.20
2.40
2.40
1.60
0.93

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.50
0.66
1.70
3.00
31.60
35.50
42.50
18.90
6.70
4.10
3.20
2.50

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.00
2.70
4.80
5.30
40.00

15.58
16.74
15.88
11.04
4.50

0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

14.20
54.10
66.04
65.62
23.59
8.30
7.00
4.82
3.21

34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

1.71

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

3.75
9.07
12.86
49.82
100.15
130.97
42.25
16.07
9.59
7.50
5.36

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

4.67

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

4.55
6.74
11.52
30.27
8.23
9.11
16.07
6.43
6.22
4.29
2.49

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

1.30

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

1.77
4.41
8.04
84.64
85.88
113.83
48.99
17.95
10.63
8.57
6.70

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

5.18

44.57

0.35
0.36
0.37
0.41

1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19

7.23
12.44
14.20
107.14

49.21
45.42
34.01
16.59

-19.82
37.51
54.69
39.67
-19.10
-39.91
-35.23
-39.43
-42.90
-42.86
-45.46
-36.35
-21.16
33.23
88.80
105.02
-0.44
-32.14
-32.64
-36.75
-40.76
-39.90
-44.66
-38.68
-22.50
13.67
-3.13
-16.84
-26.62
-41.78
-36.01
-39.97
-43.63
-43.27
-47.44
-41.01
-25.98
68.05
74.53
87.88
6.30
-30.27
-31.61
-35.68
-39.42
-39.38
-41.98
-32.98
-19.82
90.54

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

64

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1995

1996

1997

1998

Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo

54.70
29.60
13.20
5.60
3.60
2.60
2.10

2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.50
0.77
1.80
3.20
10.60
20.10
72.90
15.40
4.50
3.40
2.50
1.30

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.80
0.82
1.70
3.40
23.10
48.20
24.70
14.10
4.30
3.20
2.60
1.40

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.90
0.87
1.70
2.80
20.00
48.70
43.70
10.50
3.60
3.10
2.20
1.50

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.80
1.70
1.80
3.10
49.60
50.30
35.90

15.58
16.74
15.88
11.04
4.50
2.99
8.01

0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29

4.69
9.69
16.47
18.00
16.29
16.52
17.22

132.33
79.28
34.21
15.00
9.33
6.96
5.62

11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

3.89

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

2.06
4.67
8.57
28.39
48.63
195.26
39.92
12.05
8.81
6.70
3.48

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

2.07

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

2.20
4.41
9.11
61.87
116.61
66.16
36.55
11.52
8.29
6.96
3.75

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

2.33

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

2.33
4.41
7.50
53.57
117.82
117.05
27.22
9.64
8.04
5.89
4.02

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

4.67

44.57

0.35
0.36
0.37
0.41
0.42
0.39

1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69

4.55
4.67
8.30
132.85
121.69
96.15

49.21
45.42
34.01
16.59
11.35
25.95

120.98
53.33
-8.48
-33.21
-32.90
-37.29
-40.49
-40.68
-47.15
-40.76
-25.44
11.80
37.27
169.31
-2.78
-36.16
-33.42
-37.56
-42.64
-42.49
-47.02
-41.01
-24.91
45.28
105.25
40.21
-6.14
-36.69
-33.94
-37.29
-42.37
-42.23
-46.88
-41.01
-26.52
36.98
106.46
91.10
-15.48
-38.57
-34.20
-38.36
-42.10
-39.90
-44.66
-40.76
-25.71
116.26
110.33
70.20

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

65

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1999

2000

2001

2002

Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo

11.30
6.80
4.00
2.90
2.00

14.80
16.40
14.69
14.92
15.59

0.98
0.39
1.80
4.00
25.90
49.00
68.70
30.90
16.20
6.20
5.20
2.70

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.00
3.80
2.40
3.90
34.30
54.00
54.40
13.70
5.50
3.60
2.60
1.90

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.30
2.00
2.20
3.10
43.40
56.00
56.20
25.80
10.70
5.00
4.00
3.20

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.60
2.10
1.70
3.70
18.60
49.60
55.30
21.60
9.00

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40

0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29

16.47
18.00
16.29
16.52
17.22

29.29
18.21
10.37
7.77
5.36

42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

2.54

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

1.04
4.67
10.71
69.37
118.54
184.01
80.09
43.39
16.07
13.93
7.23

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

5.18

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

10.18
6.22
10.45
91.87
130.64
145.70
35.51
14.73
9.33
6.96
5.09

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

3.37

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

5.36
5.70
8.30
116.24
135.48
150.53
66.87
28.66
12.96
10.71
8.57

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

6.74

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00

5.62
4.41
9.91
49.82
119.99
148.12
55.99
24.11

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21

-13.40
-30.00
-31.87
-36.49
-40.76
-42.03
-48.17
-40.76
-23.30
52.78
107.19
158.06
37.40
-4.82
-26.16
-30.33
-38.89
-39.38
-39.03
-39.20
-23.57
75.28
119.28
119.75
-7.18
-33.48
-32.90
-37.29
-41.03
-41.20
-43.86
-39.72
-25.71
99.65
124.12
124.58
24.18
-19.55
-29.27
-33.54
-37.55
-37.83
-43.59
-41.01
-24.10
33.23
108.64
122.17
13.30
-24.10

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

66

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

2003

2004

2005

2006

Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio

4.50
3.50
2.70

14.69
14.92
15.59

2.40
1.80
2.90
4.20
37.30
51.30
65.00
20.70
8.00
4.50
3.50
2.50

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.70
0.77
1.60
2.90
32.50
51.00
43.00
17.20
6.70
4.00
3.10
2.40

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

2.10
1.20
1.60
3.50
14.10
42.70
48.80
17.50
5.30
3.80
2.90
1.20

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

0.72
0.40
1.30
2.60
36.10
50.50
60.40
19.10
8.30
4.40
3.30

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92

0.32
0.32
0.34

1.29
1.29
1.29

16.29
16.52
17.22

11.66
9.37
7.23

42.23
44.25
46.12

0.33

1.29

17.19

6.22

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

4.82
7.52
11.25
99.90
124.10
174.10
53.65
21.43
11.66
9.37
6.70

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

4.41

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

2.06
4.15
7.77
87.05
123.38
115.17
44.58
17.95
10.37
8.30
6.43

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

5.44

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

3.21
4.15
9.37
37.77
103.30
130.71
45.36
14.20
9.85
7.77
3.21

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

1.87

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52

1.07
3.37
6.96
96.69
122.17
161.78
49.51
22.23
11.40
8.84

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25

-30.57
-34.88
-38.89
-38.35
-44.39
-37.90
-22.77
83.31
112.75
148.15
10.96
-26.78
-30.57
-34.88
-39.42
-40.16
-47.15
-41.27
-26.25
70.46
112.02
89.22
1.89
-30.27
-31.87
-35.95
-39.69
-39.12
-46.00
-41.27
-24.64
21.17
91.94
104.76
2.67
-34.01
-32.38
-36.49
-42.90
-42.70
-48.14
-42.05
-27.05
80.10
110.81
135.83
6.82
-25.98
-30.83
-35.42

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

67

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

2007

Agosto
Septiembr
e
Octubre
Noviembre
Diciembre
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembr
e
Octubre
Noviembre
Diciembre

2.40

15.59

2.00
1.40
2.40
4.20
17.00
40.10
44.20
16.30
6.30
3.90
3.10
2.10

15.58
16.74
15.88
11.04
4.50
2.99
8.01
14.80
16.40
14.69
14.92
15.59

1.30
0.96
1.90
3.60

15.58
16.74
15.88
11.04

0.34

1.29

17.22

6.43

46.12

0.33

1.29

17.19

5.18

44.57

0.35
0.36
0.37
0.41
0.42
0.39
0.38
0.31
0.32
0.32
0.34

1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29
1.29

18.37
17.52
12.70
6.19
4.69
9.69
16.47
18.00
16.29
16.52
17.22

3.75
6.22
11.25
45.53
97.01
118.39
42.25
16.87
10.11
8.30
5.62

49.21
45.42
34.01
16.59
11.35
25.95
42.69
48.21
42.23
44.25
46.12

0.33

1.29

17.19

3.37

44.57

0.35
0.36
0.37

1.29
1.29
1.29

18.37
17.52
12.70

2.57
4.92
9.64

49.21
45.42
34.01

-39.69
-39.38
-45.46
-39.20
-22.77
28.94
85.65
92.44
-0.44
-31.34
-32.12
-35.95
-40.49
-41.20
-46.64
-40.50
-24.37

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

68

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Con la informacin obtenida del cuadro se ha podido realizar un grfico para comparar la oferta que tenemos versus la demanda requerida,
desde el ao 1965 hasta el ao 2007.

Curva masa
1965 - 2007
25000.00

20000.00

15000.00

Oferta acumulada

Volumen [MM3]

Demanda acumula
10000.00

5000.00

23

77
24 4
32
24 0
86
25 9
41
25 6
96
26 5
51
27 2
06
27 1
60
28 7
15
28 7
70
29 3
25
29 2
79
30 9
34
30 8
89
31 5
44
31 4
99
32 0
54
33 0
08
33 6
63
34 5
18
34 2
73
35 1
27
35 8
82
36 7
37
36 3
92
37 3
46
38 9
01
38 8
56
39 5
11
4

0.00

Tiempo

Grfico N 40 Curva masa 1965-2007


Fuente: Elaboracin propio
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

69

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

CAPITULO 5: INGENIERA DEL PROYECTO

Este captulo comprende los elementos de la ingeniera de la central hidroelctrica


Molloco, tales como obras de cabecera, obras de aduccin, conducto forzado, obras
de almacenamiento, obras hidrulicas, aliviaderos, entre otros.
Asimismo, tambin introduciremos en este captulo los elementos hidrulicos y
mecnicos del proyecto.
El siguiente grafico presenta de manera simplificada la ingeniera del proyecto, tema el
cual desarrollaremos a continuacin.

Grfico N 41 Diagrama del proyecto


Fuente: Proinversin

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

70

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1.20
5.1.1

OBRAS DE ALMACENAMIENTO
Embalse Machucocha

El embalse Machucocha es de regulacin. Se encontrar ubicada en la garganta de


salida de la laguna Machucocha, se realizar mediante una presa de tierra. Se
encontrar a 4 661.00 m.s.n.m. La capacidad til del embalse ser de 60 MMC.
A continuacin, en el siguiente cuadro se encuentran las caractersticas del embalse.

Cuadro N 35 Caractersticas del embalse Machucocha

Descripcin

caracterstica

rea de la cuenca regulada


Avenida de diseo (Tr= 10 000 aos)
Capacidad a nivel normal
Volumen til
rea a nivel normal
Caudal regulado por la toma
Nivel de agua mximo extraordinario
(NAME)
Nivel de agua mximo operativo (NAMO)
Nivel de agua mnimo operativo (NAME)

87 km2
120 m3/s
235.6 MMC
MMC
11.2 km2
0.84 m3/s
4 660.12 msnm
4 660.00 msnm
4 655.50 msnm

Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco


5.1.2

Embalse Molloco

El embalse Molloco es de regulacin. Se encontrara ubicada entre el embalse


Machucocha y Japo, se realizar mediante una presa CFRD. Se encontrar a 4 480.00
m.s.n.m. La capacidad til del embalse ser de 150 MMC.
A continuacin, en el siguiente cuadro se encuentran las caractersticas del embalse.

Cuadro N 36 Caractersticas del embalse Molloco

Descripcin

caracterstica

Avenida de diseo (Tr= 10 000 aos)


Volumen til
Nivel de agua mximo operativo (NAMO)
Nivel de agua mnimo operativo (NAME)

160 m3/s
150 MMC
4 480.00 msnm
4 481.16 msnm

Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

71

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

5.1.3

Embalse Japo

El embalse Japo se realizar mediante una presa mixta. Se encontrar a 4 224.00


m.s.n.m. La capacidad til del embalse ser de 90 MMC.
Este embalse se ha concebido para cumplir una triple funcin: afianzamiento del
caudal del ro, puesta en presin del sistema y retencin de sedimentos para las
dos centrales.
Cuadro N 37 Caractersticas del embalse Japo

Descripcin

caracterstica

Avenida de diseo (Tr= 10 000 aos)


Volumen til
Nivel de agua mximo operativo (NAMO)
Nivel de agua mnimo operativo (NAME)

150 m3/s
90 MMC
4 224.00 msnm
4 227.60 msnm

Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco

1.21
5.2.1

OBRAS DE CABECERA
Toma de la CH Soro
Las obras de toma de la central de Soro se encuentran en la cota de 3 285
m.s.n.m. en el rio Huauro. El caudal de diseo para la realizacin de la bocatoma
se toma en caudales naturales medios mensuales en el punto de inters. Tal
como muestra en los grficos N37 y N38, el histograma y curva de persistencia
para la bocatoma con los caudales que inciden en su clculo.

Grfico N 42 Histograma de caudales mensuales

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

72

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 43 Curva de duracin


Asimismo, el barraje en concreto tienen una altura 13.00 m y una longitud de
37.35 m. Estas dimensiones se miden a partir de la descarga y el tnel de
aduccin.
5.2.2

Presas
El proyecto presenta tres embalses, y en consecuencia, tres presas: Presa
Machucocha, presa Molloco y presa Japo.
Presa Machucocha
La presa Machucocha se ha planeado de tierra conformado por un ncleo
central homogneo de material impermeable, confinado por materiales
granulares para filtros y enrocado de proteccin.
El siguiente cuadro presenta las caractersticas de la presa Machucocha.

Cuadro N 38 Caractersticas de la presa Machucocha

Descripcin
Tipo

caractersticas
Homognea
4 662.05
Nivel de coronacin:
m.s.n.m.
Altura mxima
9.1 m.
Talud aguas abajo
2:1 (H:V)
Talud aguas arriba
2:1 (H:V)
Ancho de la cresta
6.0 m.
Longitud de coronamiento
94.5 m.
Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

73

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Presa Molloco
Para este embalse se ha planeado una presa de materiales de prstamo con
una pantalla de concreto de impermeabilizacin de talud (CFRD) de 0.5 m de
espesor promedio. El talud aguas abajo ser protegido con una capa de
enrocado de tamaos mayores a 30 cm.
El borde libre para las condiciones del paso de una mxima avenida de 10 000
aos de retorno ser de 2.00 m.
El siguiente cuadro presenta las caractersticas de la presa Molloco.

Cuadro N 39 Caractersticas de la presa Molloco

Descripcin
Tipo
Ancho de la corona

Caractersticas
CFRD
10 m.
4 483.50
Nivel de coronacin
m.s.n.m.
Talud aguas arriba
1,5:1 (H:V)
Talud aguas abajo
1,5:1 (H:V)
Ancho de la cresta
6.0 m.
4 480.00
NAMO
m.s.n.m.
4 481.16
NAME
m.s.n.m.
Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco

Presa Japo
La presa Japo se ha planeado como presa mixta de 62 m de altura y diques en
material suelto con 10 m de altura mxima, realizado con el fin de cumplir al
mismo tiempo las funciones de afianzamiento del caudal del ro, puesta en
presin del sistema y retencin de sedimentos para las dos centrales. Por ello se
ha diseado una presa mixta, donde su parte central es de concreto gravedad
(CG) y de materiales de prstamo con una pantalla de concreto de
impermeabilizacin (CFRD).
El NAMO se ha establecido con cota 4 224 m.s.n.m. considerando el NAME en
la cota 4 227.30 m.s.n.m.
El borde libre para las condiciones del paso de una mxima avenida de 10 000
aos de retorno ser de 2.40 m.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

74

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

El siguiente cuadro presenta las caractersticas de la presa Japo, tanto la CG


como CFRD.
Presa de concreto gravedad

Cuadro N 40 Caractersticas de la presa Japo - CG

Descripcin
Cota de la corona
Ancho de la corona
Talud aguas arriba
Talud aguas abajo

Caractersticas
4 229.70
m.s.n.m.
6.00 m.
vertical
0.75:1 (H:V)

Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco

Presa CFRD
Cuadro N 41 Caractersticas de la Japo - CFRD

Descripcin
Cota de la corona
Ancho de la corona
Talud aguas arriba
Talud aguas abajo

Caractersticas
4229.70 m.s.n.m

6.00 m
1.5:1 (H:V)
0.75:1 (H:V)

Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco

5.2.3

Desarenador
Un aspecto importante para el diseo hidrulico de las obras se refiere al control
de los slidos arrastrados por el agua. El Embalse Japo, por su capacidad
relativamente grande, eliminar casi por completo las partculas slidas del agua
a ser turbinada, resultando innecesario prever un desarenador en la toma de
agua arriba.1
Por lo que segn datos de estudio de la Empresa ELECTROPERU del ao 1986
en la siguiente tabla se muestra el volumen de slidos:

Cuadro N 42 Volumen de sedimentos

PRESA

JAPO*

AREA DE
CUENCA
(km2)

1,418.00

VOLUMEN ANUAL DE
SEDIMENTOS (m3)

CAUDAL
MEDIO
(m3/s) SUSPENSI
ARRASTRE
ON

11.64 56,000.0

150,000.

TOTAL

206,000.

VOLUMEN
DE
SEDIMENT
OS EN 50
AOS
(MM3)

10.30

1 Informe de Factilibidad Informe Final Vol I 1986: 173


PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

75

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

MOLLOC
O

674.00

0
11,000.0
6.49
0

00
26,000.0
0

00
37,000.0
0

1.85

Fuente: Estudio de Factibilidad Informe Final PRETOPERU (1986)


* El volumen que se muestra para el embalse de Japo no considera la construccin
del embalse de Molloco, situacin que corresponde a la segunda etapa del Proyecto.
Por lo tanto, en la segunda etapa el aporte de caudal solido en Japo se reducir en
aproximadamente 20%.

1.22
5.3.1

OBRAS DE ADUCCIN Y CONDUCCIN


Obras de aduccin y conducto forzado de la central Llatica
Obras de aduccin
La captacin es por la margen izquierda del embalse Japo, con una toma en dos
niveles destinada a captar, siempre que sea posible, las aguas ms libres de
transporte slido. Debido a la gran altura de salto de esta central: 1 030 m,
aproximadamente, es recomendable que el agua turbinada este lo ms libre
posible de sedimentos. Por ello conviene captar las aguas superficiales que el
embalse tenga en un determinado momento. Es as que se ha dispuesto dos
estructuras de captacin a distinto nivel.
La toma inferior capta el volumen til total del embalse. La toma alta permite
captar y controlar la mitad superior del embalse. De esta manera, por lo menos,
una parte del tiempo se tendr la opcin de captar aguas prcticamente libres de
sedimentos, alejadas de las corrientes de densidad que lleven sedimentos por
los bajos niveles de la masa embalsada.
Tnel de aduccin
El tnel est diseado para trabajar a presin con un caudal nominal de 16.4
m^3/s. El tnel, de 7948 m de longitud y 4.50 m de dimetro, se desarrolla a lo
largo de la ladera izquierda del can del ro Huaruro, con una ventana
aproximadamente a la mitad del recorrido.
El tnel tiene seccin de herradura y revestimiento de concreto donde sea
conveniente. Al final del tnel se encontrar la chimenea de equilibrio.
El acceso para la fase de excavacin y revestimiento se hacen a travs de dos
frentes: la primera es a travs de una ventana, ubicada en el tnel de aduccin y
la segunda, a travs de un tnel de acceso. Ver grfico N44.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

76

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 44 Vista en planta del tnel de aduccin de la CH Llatica

Grfic
o N 45 Vista del corte A

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

77

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 46 Vista del corte B

Grfico N 47 Vista del corte C


Chimenea de equilibrio
Como se mencion en el anterior punto, al final del tnel a presin se tiene
prevista una chimenea de equilibrio, la cual ser excavada en subterrneo y
revestida integralmente en concreto.
La chimenea consiste en un pozo vertical de 6.0 m de dimetro y una longitud
total de 71.0 m. Ver Grfico N48.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

78

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Grfico N 48 Dimensionamiento de la chimenea de equilibrio Llatica


Conducto forzado
El conducto forzado se desarrollar parte al exterior. Este conducto consta de
dos tramos; el primero la tubera estar instalada en la superficie, con una
longitud total de 1 214.0 m con dimetros de 2.60 m y 2.40 m; el segundo tramo
estar en caverna, con un pique de 448.13 m de altura y un tramo horizontal de
647.40 m hasta la casa de mquinas Llatica, todo este tramo tendr una tubera
de 2.0 m.
La longitud total de la tubera forzado es de 2 559.0 m, medidos desde el inicio
del blindaje del tnel hasta la casa de mquinas Llatica.
5.3.2

Obras de aduccin y conducto forzado de la central Soro


Tnel de aduccin
El tnel est diseado para trabajar a presin con mismo caudal nominal del
tnel de Llatica, es decir, 16.4 m^3/s. Adems, ser usado tambin como va de
acceso a la central Llatica. En el piso del tnel se instalar la tubera de aduccin
que permitir la alimentacin a la centra Soro.
La tubera de aduccin ser de acero y su longitud total desde la cmara de
carga hasta la chimenea de equilibrio es de 4 008.0 m. Su seccin ser de tipo

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

79

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

herradura, de dimetro de 8.0 m, con la intencin de permitir el trnsito a lo largo


del tnel aun cuando se est instalando la tubera.
Al igual que para el tnel de Llatica, se ha considerado secciones tpicas del
tnel de aduccin. Asimismo, al final del tnel se encuentra la chimenea de
equilibrio.
Chimenea de equilibrio
Como se mencion en el anterior punto, al final del tnel tiene prevista una
chimenea de equilibrio, la cual ser revestida integralmente en concreto.
La chimenea consiste en un pozo vertical de 6.0 m de dimetro y una longitud
total de 117.30 m. Ver Grfico N49.

Grfico N 49 Dimensionamiento de la chimenea de equilibrio Soro


Conducto forzado
El conducto forzado se desarrollar al exterior. Este conducto consta de dos
tramos; el primero la tubera estar instalada en la superficie, con una longitud
total de 1 099.0 m con dimetros de 2.60 m y 2.40 m; el segundo tramo estar
en caverna, con un pique de 479.50 m de altura y un tramo horizontal de 473.50
m hasta la casa de mquinas Soro, todo este tramo tendr una tubera de 2.0 m.
La longitud total de la tubera forzado es de 2 202.0 m, medidos desde el inicio
del blindaje del tnel hasta la casa de mquinas Soro.
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

80

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1.23

ALIVIADEROS

Presa Molloco
Los aliviaderos son estructuras hidrulicas destinadas a propiciar el pase, libre o
controlado del agua en los escurrimientos superficiales, con un objetivo en especial
evitar los posibles desbordes que podran causar serios daos, es decir controlar los
niveles de los tirantes de agua a lo largo de un canal.
Para el caso de la hidroelctrica Molloco tenemos segn el informe de impacto
ambiental el caudal de ingreso al embalse mximo para 1 000 aos de retorno, a un
valor de 250m3/segundos. Para lo cual se plante la construccin de un aliviadero de
dos ventanas de 12.50 m de ancho cada una, haciendo un total de 25 metros. El agua
descarga sobre un vertedero de cresta hidrodinmica discurrir por la superficie del
aliviadero con talud similar al de la presa, al final se ha proyectado un salto de Esqui
de tal manera que la disposicin se d por Chorro lanzado. Un esquema sencillo es
planteado a continuacin.

Grfico N 50 Seccin tpica de aliviadero

Caudal de avenida transitado o con laminacin


Cuadro N 43 Cuadro de clculo cargas

Q (m3/s)
L (m)
H (m)

16.3
5
1.50

42.3
15
1.35

62.5
25
1.25

100
50
1.10

Los valores anteriores fueron fcilmente obtenidos de acuerdo a la frmula de Francis


PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

81

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Q=CLh3 /2

Con un coeficiente C equivalente a 1.84

De los resultados obtenidos se puede concluir que las variaciones de carga no son
muy grandes (0.40); en cambio los caudales varan entre 16 y 100 m3/s. Escogiendo
el caudal de 42.3 m3/s, L=15m y H0 = 1.35m
La variacin de carga en relacin con un aliviadero de 100m3/s de caudal es 0.25m
que puede observarse por el borde libre asignado a la presa sin el criterio de diseo y
por consiguiente la altura de la presa.
Perfil hidrulico del aliviadero
2

H 0+ z 0=

vi
+di+hf
2g

Considerando una convergencia de las paredes de 10 y b1 = 5.0 m, la longitud de


transicin es

L=

15.0b 1
=28.35=30 m
2 tg 10

z0 = 0.276 x 30 = 8.28 metros

vi 2
1.35+8.28= + di+ hf
2g
di=0.65 metros
Energa entre 1 y 2

v 12
v 22
+ d 1 (
+ d 2)
2g
2g
L=
( SS 0)

L=12730=97 m ;

vi 2
+d 1=9.29 ; S0 = 0.276
2g

d 2=0.51 m ; v2 = 16m/s
Energa entre 2 y 3

v 22
v 32
+ d 2 (
+d 3)
2g
2g
L=
(SS 0)

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

82

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

d 3=0.72 m ; v3 = 11.75m/s

borde

libre

del

aliviadero

f =0.61+0.037 v 3 d
Cuadro N 44 perdidas de energa

Seccin

d (m)

0
1
2
3

v(m/s)

1.35
0.65
0.51
0.72

2.09
13.0
16.6
11.8

f(m)
0.69
1.03
1.12
1.00

H(m)

H adoptado

2.04
1.68
1.63
1.72

(m)
2.05
1.70
1.70
1.70

Radio de curvatura en trampoln


Radio de curvatura = R>= 10d = 10*0.72 = 7.20
Revisin

F 1=

11.80
=4.40
9.800.72

R
=11.5 F9.1F 4 5.1=5.80
d1

Radio de curvatura en la seccin

R 5 D 50.5=2.5 metros
Se adoptan radios de curvatura de 10 metros y de 5 metros para el trampoln y en la
seccin 2.
Presa Machucocha
El aliviadero correspondiente al embalse Japo tiene las siguientes solicitaciones de
acuerdo al estudio de impacto ambiental, en primera instancia se consider un
aliviadero superficial en su extremo derecho, esto a razn de una informacin
topogrfica en la cual daba una zona aplanada. Sin embargo en la actualidad se ha
encontrado que ese enchatamiento no existe, de tal forma que se consider luego una
aliviadero tipo Morning Glory. De tal forma que finalmente se asumi este aliviadero
conectado al tnel de desvi. El radio del aliviadero es de aproximadamente 10 m y da
un aliviadero efectivo con un ancho de 60 m.
La cresta del vertedero Morning Glory se encuentra en la cota 4480m.s.n.m, y con una
carga e agua de 1.16m que da un NAME en el nivel 4481.16 msnm.
Qdiseo= 46m3/s+5m3/s (Tr=1000aos)

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

83

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Q base = 5.0m3/s (Se considera un caudal de 5m3/s, que corresponde al promedio


mensual del periodo de avenidas y en ese momento se presenta la avenida de
1000aos)
Transitando el caudal de diseo en el reservorio el caudal de salida por el aliviadero se
transforma en 5.1m3/s. De acuerdo con las condiciones de la estructura de toma del
reservorio, se ha considerado la posibilidad de conectar el aliviadero a esta

Q=2.09LH 3 /2

Grfico N 51 Perfil de entrada del aliviadero

Perfil de entrada del aliviadero (Ref. Design of small dams)


Para Radio = 1.80m

6.281.80
=8.00
360
=256
Para

H 0 0.45
=
=0.25
R 0 1.80

Hs
=1.10
Ho
Hs
=1.100.25=0.28
R

Ps
=2
Rs
Para

P
=2
R

Hs
=0.28
R

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

84

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 45 Clculo de cargas

y
hs

0
0
-0.10
-0.06
-0.20
-0.10
-0.50
-0.28
-1.0
-0.55
-1.50
-0.87
-2.0
-1.10
Seccin del chorro a cada libre

R=

0.204Q
1/ 4
Ha

x
hs

0.45
0.66
0.79
1.09
1.44
1.70
1.89

0.27
0.36
0.43
0.60
0.79
0.94
1.04

1.73
1.64
1.57
1.40
1.21
1.06
0.96

1 /2

R (pies), Q(pies3/s)

Ha (pies medios a nivel de superficie libre de embalse)


Cuadro N 46 Radio con respecto a la profundidad

Ha
R1
y

0.50
1.46
0

1.0
1.23
0.55

1.5
1.11
1.05

2.0
1.03
1.85

Seleccionar un valor de R1 que se aproxime a R, segn esto tenemos


R1=1.05m,
1.24

=2.10 metros de dimetro del pozo

OBRAS HIDRAULICAS

La construccin de las presas involucra el desarrollo de otras, que estn destinadas a


cubrir y solucionar las necesidades del proyecto. Las principales obras previstas para
la construccin de las presas son: obras de desvo, diseo de obras de descarga y una
estructura de evacuacin de crecidas, o aliviadero.
Segn el estudio de impacto ambiental elaborado para el proyecto, la ejecucin de las
obras de desvo se ha programado durante el periodo de estiaje (mayo a noviembre),
poca en la cual el flujo superficial que atraviesa la seccin del eje de la presa es
escaso.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

85

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

5.5.1 Obras hidrulicas en la presa Machucocha


Como se mencion en el punto referido a presas, la presa Machucocha est
conformada por un ncleo central homogneo de material impermeable. En dicho
ncleo sea dispuesto un dren chimenea, que continua horizontalmente hacia el pie de
la presa aguas abajo, donde se instalara una tubera PVC con el fin de recolectar las
filtraciones.
Asimismo, debido a las condiciones hidrolgicas y al tamao del embalse, se ha
determinado que los caudales de toma y alivio sean descargados por una misma
estructura de conducto circula de 1.15 m de radio, 55 m. de longitud y 1% de
pendiente. Su funcionamiento es a descarga libre aguas debajo de la compuerta de
control.
Adems se han planeado las siguientes obras:

Construccin de atagua, la cual estar construida de enrocado de TM=5; esta


estructura tiene una plataforma que facilita el acceso a la zona de obra. As
mismo, se prev que la atagua conformara parte del cuerpo de la presa
posteriormente.
Zanja de fundacin para el ducto de descarga; la cual una vez que sea
excavada y la tubera de concreto este colocada en el sitio de la obra, pasar a
ser llenada con material morrnico ( material glaciar no estratificado) hasta cubrir
completamente el tubo desde el talud aguas abajo hasta el talud aguas arriba
de la presa.
Construccin del cuerpo de presa, que tendr una altura no menor de 3.00 m.
por encima de la cota ms baja del terreno, esto con el objetivo de garantizar la
continuidad de las obras en la poca de lluvias.

5.5.2 Obras hidrulicas en la presa Molloco


Inyecciones y Drenaje
Para este tipo de presas: CFRD, la pantalla de inyecciones se ejecutar por debajo del
Plinto (elemento de transicin que soporta a las losas de hormign) proporcionalmente a
la carga de agua en las secciones y caractersticas de Permeabilidad de la
cimentacin.
Las inyecciones se realizarn desde la superficie, por lo que se ejecutar tres hileras
de inyecciones hasta un nivel en donde la permeabilidad de la cimentacin tome
valores menores a 10-5 cm/s.
Estructura de Desvo
Se ha proyectado la construccin de un tnel de desvo en el margen derecho del
cauce de rio con el objetivo de poder construir las obras emplazadas en el cauce ro.
Dicho tnel tiene una longitud aproximada de 460 m. de longitud, con una seccin
transversal circular de 4.00m. de dimetro y una pendiente uniforme de S=0.007. El
tnel de desvo est provisto de una ranura para la colocacin de una compuerta de

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

86

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

4.00x4.00 m. de cierre, en el momento que se produzca el sellado del tnel de desvo


luego de cumplir su objetivo.
Para e diseo de las obras de desvo se ha considerado un caudal de 160 m3/s2. Con
la finalidad de garantizar el desvo de dicho caudal, se ha planteado la construccin de
una atagua de aproximadamente 12m. de altura, la cual presenta las caractersticas
especificadas en el siguiente cuadro.
Cuadro N 47 Caractersticas de la atagua Presa Molloco

Descripcin

Detalle

Cota de la cresta

4,451.00 msnm

Nivel de aguas de desvo

4,450.00 msnm

Altura mxima

12.00 m

Material del cuerpo

Material aluvial

Elemento de impermeabilizacin

Geomembrana

Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco


Estas caractersticas de la atagua garantizarn obtener la carga necesaria para
evacuar el caudal de diseo considerado para el periodo deconstruccin. Luego de la
culminacin de la etapa de construccin, se sellar el tnel de desvo mediante un
tapn de concreto y posteriormente se proceder a retirar la atagua.
Descarga de Fondo
El umbral de ingreso de la descarga de fondo se encuentra en la cota 4,450.50 msnm,
la cual tiene una longitud aproximada de 170 m. de longitud y una seccin transversal
circular de 2.50 m. de dimetro para descargar un caudal de diseo de 16.50 m3/s.
Esta conduccin estar totalmente revestida y blindada.
En el ingreso de la captacin se ha diseado una rejilla para retener en lo posible los
elementos flotantes, adems presenta de ranuras para la instalacin de ataguas. En
la parte final de la captacin se tiene la cmara de Vlvulas cuya funcin ser regular
el caudal de diseo. En esta cmara de vlvulas se instalarn dos compuertas de
resguardo tipo Ring Follower y dos vlvulas principales de regulacin tipo Howell
Bunger, ambas de 1.00m de dimetro.
5.5.3 Obras hidrulicas en la presa Japo
Inyecciones y Drenaje
Debido al material que forma la cimentacin de la presa: roca permeablesemipermeable, es importante considerar la estabilidad de dicha cimentacin a los
problemas de filtracin, por lo que se prev tener un sistema de impermeabilizacin de
inyecciones y sistema de drenaje.
Por debajo de la presa de concreto se ha considerado pantallas de inyeccin de 40m
de profundidad. Estas inyecciones en la cimentacin se realizarn desde dos galeras
ubicadas en las cotas 4,183.73 msnm y 4,151 msnm.
2 Cfr EIA Central Hidroelctrica Molloco 2008: 186
PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

87

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Por otro lado, en el diseo de la presa tambin se considera la presencia de drenes


verticales cerca de su parmetro aguas arriba con la finalidad de colectar la filtracin
que se da a travs del paramente y evacuarlo a las galeras y de aqu hacia aguas
abajo.
Estructura de Desvo
Se ha proyectado la construccin de un tnel de desvo en el margen izquierdo del
cauce de ro con el fin de construir las obras emplazadas en cauce del ro. Dicho tnel
tiene una longitud aproximada de 170.00 m. de longitud, con una seccin transversal
circular de 4.60 m. de dimetro y pendiente uniforme de S= 0. 015. El tnel de desvo
est provisto de una ranura para la colocacin de una compuerta de 4.60x3.18 m. de
cierre, en el momento que se produzca el sellado del tnel de desvo luego de cumplir
su objetivo.
Para e diseo de las obras de desvo se ha considerado un caudal de 150 m3/s3. Con
la finalidad de garantizar el desvo de dicho caudal, se ha planteado la construccin de
una atagua de aproximadamente 15 m. de altura, la cual tiene las caractersticas
especificadas en el siguiente cuadro.
Cuadro N 48 Caractersticas de la atagua Presa Japo

Descripcin
Detalle
Cota de la cresta
4,193.54 msnm
Nivel de aguas de desvo
4,192.04 msnm
Altura mxima
15.00 m
Material del cuerpo
Material aluvial
Elemento de impermeabilizacin Geomembrana
Fuente: Estudio de Impacto Ambiental de la Central Hidroelctrica Molloco
Luego de la culminacin de la etapa de construccin, se sellar el tnel de desvo
mediante un tapo de concreto y posteriormente se proceder a retirar la atagua.
Descarga de Fondo
En la presa se ha considerado una descarga de Fondo, el fin eventual ser la
alimentar a la Central Hidroelctrica de Soro cuando, por alguna, circunstancia se
paralice la operacin de la Central Llatica.
Esta descarga de fondo tiene el umbral de su captacin en la cota 4,186 msnm, cuya
seccin transversal es circular con un dimetro de 2.00 m., con la finalidad de
descargar 50m3/s. Para controlar este ducto se ha considerado una compuerta
principal plana de 2.00x2.00m y otra de emergencia.

3 Cfr EIA Central Hidroelctrica Molloco 2008: 189


PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

88

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

1.25

TRANSPORTE DE SEDIMENTOS

Para los fines del proyecto interesa conocer el volumen de sedimentos que podra
depositarse en los embalses proyectados. Adems es necesario definir las
caractersticas fsicas y mineralgicas del material transportado en suspensin, a fin
de evaluar os problemas de abrasin y mantenimiento del equipo hidromecnico de
las centrales hidroelctricas.
El transporte de sedimentos contiene 2 componentes importantes: El transporte de
slidos en suspensin y el transporte de slidos de fondo. Para el primer componente
la relacin entre el caudal lquido y el caudal slido se ha elaborado con los datos del
puente colgante sobre el ro Molloco. La relacin aqu obtenida es aplicable a la
seccin de Japo. A continuacin se presenta dicha relacin en el grfico N52.

Grfico N 52 Relacin caudal solido-caudal lquido en puente Huaruro


6

Ts=6.734 x 10 x Q
r=0.95

3.496

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

89

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Donde:
Ts

:
Q
R

Caudal slido en suspenin (Kg/s)


:
Caudal lquido (m3/s)
:
Coeficiente de correlacin

De donde se obtiene que el volumen de sedimentos en suspensin en el embalse de


Molloco es de 9900 m3 para el periodo de avenidas. Si se considera que el volumen
de sedimentos transportados en avenidas es el 90% del volumen total anual, tenemos
que el transporte anual es de 11000 m3. En el caso de Japo se ha estimado, en forma
similar, un volumen anual de 56000 m3.
El transporte de slidos de fondo se estim a partir de las ecuaciones de Meyer-PeterMuller y Einstein. Para este clculo se consider un peso especfico del materia de 1.4
t/m3. A continuacin se presenta el cuadro N49 donde se resumen del volumen total
de sedimentos en las presas Molloco y Japo.

Cuadro N 49 Volumen de sedimentos

PRESA

JAPO*
MOLLOC
O

AREA DE
CUENCA
(km2)

CAUSAL
MEDIO
(m3/s)

VOLUMEN ANUAL DE SEDIMENTOS


(m3)
SUSPENSIO
ARRASTRE
N

1,418.00

11.64

56,000.00

674.00

6.49

11,000.00

150,000.
00
26,000.0
0

TOTAL

206,000.
00
37,000.0
0

VOLUMEN
DE
SEDIMENT
OS EN 50
AOS
(MM3)

10.30
1.85

Fuente: Estudio de Factibilidad Informe Final ELECTROPERU (1986)


* El volumen que se muestra para el embalse de Japo no considera la construccin
del embalse de Molloco, situacin que corresponde a la segunda etapa del Proyecto.
Por lo tanto, en la segunda etapa el aporte de caudal solido en Japo se reducir en
aproximadamente 20%.
Una vez determinado el volumen, se procede a presentar el cuadro N49 donde se
muestran los resultados del anlisis mineralgico realizado por ELECTROPER en la
seccin Japo.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

90

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Cuadro N 50 Estudio mineralgico.

MINERAL

TAMAO
(mm)

FORMA

% EN
PESO

DUREZA
()

Cuarzo

0.15 0.35

Angulosa

17.09

Hornblen
da

0.15 0.85

Angulosa

9.63

6.5

Plagioclas
a

0.15 0.35

Angulosa

9.23

Frag.
liticos

0.35

Angulosa

29.08

5.5

Vidrio
volcnico

0.15
-0.35

Angulosa

16.7

5.5

Opacos

0.07 0.20

Angulosa

5.7

Biotita

0.15 0.70

1.97

2.5

Frag.
liticos
arcillosos

0.15 0.35

10.6

1.5

Angulosa a
redondeada
Subangulosa
a
subredondea
da

Fuente: Estudio de Factibilidad Informe Final ELECTROPERU (1986)

Casi el 36% del material est constituido por partculas de dureza alta, de forma
angulosa y de tamaos entre 0.15 y 0.85mm. El 82% del material slido tiene una
dureza igual o mayor que 5.5. Si bien estas caractersticas no son favorables, el efecto
negativo que esto pudiera ocasionar se minimizar debido a que los embalses
propuestos actuarn como grandes sedimentadores y de este modo se disminuir
considerablemente la concentracin de agua turbinada.
Debido a las caractersticas geomorfolgicas de la cuenca, cobertura vegetal, elevada
altitud en que se encuentran los embalses, y la poca pendiente de los cursos
principales, se prev que el transporte de slidos ser relativamente bajo.
1.26

EQUIPO HIDRAULICO

5.7.1. Equipo Hidraulico de la CH Llatica

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

91

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

En la CH Llatica el caudal total ser de 16.4 m3/s se instalarn dos turbinas tipo
Pelton, de eje vertical y seis (6) inyectores por rodete, cuyas caractersticas principales
de cada turbina sern las siguientes:
Salto neto 1 002 m

Tipo Pelton

Inyectores 6

Caudal de diseo 8 m3/s

Potencia nominal 80 MW

Velocidad 720 rpm

Velocidad de empalamiento 1 250 rpm

El control y regulacin de la velocidad deber ser supervisado por un sistema


automatizado de ltima generacin.
Cada turbina contar con un cojinete gua ubicado entre el generador y la turbina.

5.7.2. Equipo Hidraulico de la CH Soro

En la CH Soro el caudal total ser de 16.4 m3/s se instalarn dos turbinas tipo Pelton,
de eje vertical y seis (6) inyectores por rodete, cuyas caractersticas principales de
cada turbina sern las siguientes:

Salto neto 1 120 m

Tipo Pelton
Inyectores 6
Caudal de diseo 8 m3/s
Potencia nominal 80 MW
Velocidad 720 rpm
Velocidad de embalsamiento 1 250 rpm

El control y regulacin de la velocidad deber ser supervisado por un sistema


automatizado de ltima generacin.
Cada turbina contar con un cojinete gua ubicado entre el generador y la turbina.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

92

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

CONCLUSIONES
El estudio presentado muestra los datos tomados del INEI, SENAMHI, ANA y
expedientes tcnicos encontrados en la web y el informe hidrometereolgico
elaborado para la central hidroelctrica Molloco. Los datos obtenidos se
procesaron y dieron las distintas conclusiones:

Se planea ubicar el embalse el cauce del Ro Molloco para aprovechar la


topografa de la zona.

No se presenta estaciones en la cuenca del ro Molloco.

La CH inyectar energa al sistema elctrico interconectado nacional (SEIN),


por lo que se infiere que es un proyecto muy importante.

Dentro de la zona se encuentra varias lagunas, por lo que se concluye es un


lugar perfecto para construir una CH, ya que en poca de estiaje se garantiza
que habr agua.

La demanda potable de los departamentos de Caman, Castilla y Caylloma,


fueron 2.95 m3/s; 1.34 m3/s y 4.3 m3/s. Lo cual nos bridan caudales pequeos
de demanda teniendo en cuenta las zonas rurales y urbanas. En este caso,
utilizaremos el de Caman, ya que es el de nuestra rea de influencia.

La demanda agraria para la zona de Caman se tom teniendo en cuenta los


cultivos ms representativos segn la Gerencia Agraria de Arequipa los cuales
fueron la papa y el arroz camanejo propiamente de la zona. Los cuales nos
brindaron unos caudales anuales de 122.82 m3/s con el mtodo Blaney Criddle
Modificado y Blaney Criddle 151.22 m3/s. Tomando una consideracin de
prdida del 3% y una eficiencia de riego del 85%.
El volumen de la central hidroelctrica Molloco es 209 MM3.
La comparacin de la curva masa del Ro Molloco no regulado con la curva de
demanda acumulada demuestra que existen periodos amplios de ms de un
ao donde se presentan dficits de agua, por lo que es preciso construir un
embalse.
Los embalses tienen una capacidad media 60,150 y 90 hectmetros y tal como
lo mencionado estan ubicadas en Machucocha, Molloco y Japo
respectivamente. Asimismo, esto se debe a la ubicacin donde se encuentran,
ya que tienen una gran altura, pero mediano volumen de almacenamiento.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

93

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Para el diseo de las tomas se tomaron en cuenta los datos mensuales de los
caudales. Asimismo, presenta un barraje de dimensiones de 13 metros de
altura y 37 metros de longitud.

Las tres presas son de material conglomerado con concreto para no permitir
filtrar el fluido aguas abajo.

El desarenador de la obra hidrulica no se detalla, ya que los la latitud donde


se encuentra el proyecto presentan pocos sedimentos por la latitud.
El tnel de aduccin fue correctamente calculado para soportar la presin que
generara el fluido. Asimismo, la seccin es la ms ptima en cuestin de
economa y eficiencia.

El tnel est diseado para trabajar a presin con mismo caudal nominal del
tnel de Llatica, es decir, 16.4 m^3/s.

Se utiliz chimenea para controlar las crecidas y mantenimientos de la presa.


Asimismo, por la envergadura del proyecto se construirn ataguas.

Los vertederos fueron calculados teniendo en cuenta el trnsito de avenidas y


un caudal de retorno de 1000 aos. Debido a que sirve como filtro y parte
fundamental para posibles crecidas.

Para el clculo de los sedimentos se tiene en cuenta los slidos de suspensin


y fondo.

RECOMENDACIONES
Debera implementarse estaciones dentro de la cuenca del ro Molloco.

Para el clculo de las precipitaciones efectivas se calcularon con funcin a la


precipitacin mensual. Sin embargo, esta relacin se sac una formula del
portal de Ingeniera Agroforestal, lo cual puede que no se cumpla en la zona,
ya que se cumplen otras condiciones. Calibrar el modelo para datos ms
exactos.

Las horas luz se sacaron del libro de Ven Te Chow tomando en cuenta la zona.
Sin embargo, estos parmetros pueden ser calibrados para modelos de la
zona.

El uso consuntivo se puede de la papa y del arroz se pueden obtener otros


valores de tal modo de calibrar el modelo segn la variedad de cada producto.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

94

UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS


Laureate International Universities

Para el clculo de las estructuras hidrulicas se deben tomar caudales diarios


para su clculo.

El clculo del desarenador debe ser detallado, pese a que el proyecto est en
la latitud donde se encuentra.

Las la presa y aliviadero deben tener detallado su proceso constructivo en los


informes, ya que de esta manera facilitaran el trabajo del constructor.

PROYECTO CENTRAL HIDROELECTRICA MOLLOCO

95