Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Temperature of the both the injected chemical and the line product:70degree centigrade (approx.)
S.N
O.
INSTAL
LATION
GAS
header
DIA
LAKWA
GGS-1
GELEKY
GCP
CHARA
LI GGS
12"
8-10
12"
13
480000
25
4"
10-13
40000
2.4
2
3
OPERATING FLOW
PRESSURE
M3/DAY
IN PIPELINE
(KG/CM2)
Total GCI
INJECTION
QTY
( Ltrs/day)
1000000 50
Mounting
: Flare weld
Pressure Rating
: 3600 PSI
Material
Should meet
: NACE MR 0175
The corrosion inhibitor injection is through T-type standard Access Fitting system consists of 2 NB with
standard height access fitting, Tee type, flare weld in carbon steel with solid plug assembly in AISI 316
SS fitted with injection tube open type, injection nut, nozzle, valve, nipple in AISI 316SS along with
protective cover, spare, service tools and equipment.
2.1
An Access Fitting body with a side Tee through which the fluid (Corrosion inhibitor) transfer takes
place The Tee may be flare welded.
2.2
A solid plug assembly inside the fitting body is used to carry an injection nut that has the injection
tube/nozzle assembly .
2.3
84
These open NPT injection tubes assemblies shall be Retractable type and installed in
Access Fitting on pipelines at specified locations for enabling injection of corrosion
inhibitor into main stream for uniform dispersion.
2.4
Nipples: Nipples are to be used with the TEE Access Fitting Assembly with the injection system
2.5
Shut Off Valves : Shut Off valves are required to cut off the injection flow and maintain
pressure integrity through the Tee when the Solid Plug Assembly is being removed or replaced.
They also used to be control the injection flow rate.
3.0
4.0
Retrieval Tool with service valve kit: Already Available with ONGC
85