What is HAZOP?
Commissioning manager
Plant manager
Project engineer
Process engineer
Control/Electrical engineer
Phases of hazop
Pre-meeting phase
Collection of data about facility viz. PFDs, P&IDs,
Plant layout, Chemical hazard data
Identification of team members
Meeting phase
Division of plant in sections or nodes
Deviations, causes, consequences & protective
systems are identified
Post-meeting phase
Discussions are recorded
Actions are followed-up & report is issued
HAZOP procedure
1.
3.
4.
2.
6.
7.
8.
9.
5.
10.
MEANING
COMMENTS
The complete
negation , ex. No
flow
MORE,
HIGHER,
GREATER
Quantitative
increase, ex. High
temp.
LESS, LOWER
Quantitative
decrease, ex. Low
temp.
AS WELL AS
Qualitative
increase
PART OF
Qualitative
decrease
GUIDE
WORDS
MEANING
COMMENTS
REVERSE
The logical
opposite of
OTHER THAN
Complete
substitution
SOONER THAN
LATER THAN
WHERE ELSE
In additional
locations
ADVANTAGES
DISADVANTAGES
HAZOP Worksheet
GUIDE
WORD
ELEMENT
DEVIATION
POSSIBLE
CAUSES
CONSEQUENCES
ACTIONS
REQUIRED
NO
Material A
No flow
MORE
Material A
More flow
Filling
of Tank will overflow Installation
of
tank
into bounded area
high-level alarm
when
insufficient
capacity
exists
LESS
Material A
Less flow