Documentos de Académico
Documentos de Profesional
Documentos de Cultura
JGJ 1062003
2003 Beijing
This Code shall be published and distributed by China Architecture Industry Press organized
by the Standard Norm Research Institute of the Ministry of Construction.
Foreword
This Code is laid down the Code Compilation Team according to document (JB[2000]No.284)
issued by the Ministry of Construction after this team has carried out universal investigation
and research, has summed up practical experience and scientific research results of the testing
of foundation piles of domestic and international pipe foundation job, and has collected
universal opinions.
Main technical contents of this Code are as follows: general provisions, terms and symbols,
basic regulations, vertical compression resistance static test of single pile, single pile, vertical
uplift static test & horizontal static test of single pile, core drilling, low
testing , high strain
dynamic
testing , crosshole
sonic
strain
integrity
logging, etc.
The Ministry of Construction shall be responsible for management of this Code and
explanation of mandatory clauses, the compilation institutions shall be responsible for
explanation of technical contents.
Prepared by:
Chen Fan
Xu Tianping
Zhu Guangyu
Zhong Dongbo
Liu Minggui
Liu Jinli
Ye Wanling
Teng Yanjing
Li Dazhan
Liu Yanling
Guan Lijun
Li Rongqiang
Wang Minquan
Chen Jiuzhao
Zhao Haisheng
Liu Chun
Ji Cangjiang
Table of Contents
1. General Provisions .................................................................................................................7
2. Terms and Symbols ................................................................................................................8
2.1 Terms ............................................................................................................................8
2.2 Symbols...................................................................................................................10
3. Basic Regulations.................................................................................................................14
3.1. Testing Methods & Contents .....................................................................................14
3.2 Testing Procedures ..................................................................................................16
3.3 Testing Quantity ......................................................................................................18
3.4 Verification and Expansion of Testing.....................................................................22
3.5 Testing Results Evaluation And Testing Report ......................................................23
3.6 Testing Institution & Testing Personnel ..................................................................24
4. Static Test of Vertical Compression Resistance of Single Pile .............................................25
4.1 Scope of Application ...............................................................................................25
4.2
Instrumentations and Installation ..........................................................................25
4.3 On-the Spot Testing.................................................................................................29
4.4 Analysis and Determination of Testing Data...........................................................31
5. Vertical Uplift Static Test of Single Pile...............................................................................34
5.1 Scope of Application ...............................................................................................34
5.2 Instrumentations and Installation ............................................................................34
5.3 On-the-spot Testing .................................................................................................35
5.4 Analysis and Determination of Testing Data...........................................................36
6. Horizontal Static Load Test of Single Pile ...........................................................................39
6.1 Scope of Application ...............................................................................................39
6.2 Instrumentation and Installation ..............................................................................39
6.3 On-the-Spot Inspection............................................................................................41
6.4 Analysis and Determination of Measured Data.......................................................42
7. Core Drilling ........................................................................................................................47
7.1 Scope of Application ...............................................................................................47
7. 2 Equipment ..............................................................................................................47
7.3 On-the-Spot Operation ............................................................................................48
7 .4 Sampling and Processing of Core Sample..............................................................50
7. 5 Compressive Strength Test of Core Sample Test Piece ..........................................51
7. 6 Analysis and Determination of Measured Data......................................................52
8. Low Strain Integrity Testing.................................................................................................56
5
1. General Provisions
1.0.1
In order to ensure work quality of testing of foundation piles, unify the testing of
foundation piles, provide reliable reference for design and construction acceptance,
make quality testing of foundation piles meet requirements of safe, applicable,
advanced in technique, exact data and correct assessment, this Code is hereby drafted.
1.0.2
This Code is applicable for testing and assessment of the bearing capacity and the pile
integrity of foundation piles of construction projects.
1.0.3
Method for testing of foundation piles shall make reasonable selection and allocation
after considering such factors geologic condition, pile type and reliability of
construction quality, requirement for use according to features and applicable scopes
of all kinds of testing methods.
Quality testing of foundation piles of construction projects shall execute this Code and
shall meet regulations of the states existing relevant compulsory standards.
2.1 Terms
2.1.1
Foundation Pile
Individual pile in pile foundation.
2.1.2
Pi1e Integrity
It reflects relative change of overall stationarity indices of shaft section size,
compactness of shaft material and continuity.
2.1.3
Pile Defects
a general designation of some phenomena such as shaft break, split, ;necking effect ,
slurry clampsundries, hollow hole, honeycomb, unconsolidation, which can
deteriorate shaft integrality and cause reduction of shaft structure strength and
durability.
2.1.4
2.1.5
2.1.7
2.1.8
2.2
2.2.1
Symbols
F hammer force;
H horizontal force acting on the ground in horizontal static test of single pile;
p failure load measured from compression resistance test of core sample;
10
Q Vertical load and shaft axis in static test of vertical compression resistance of
single pile;
s reinforcement stress.
2.2.3
Geometric Parameter
l clear distance of outer wall of both sound logging pipes of each testing section;
Llength of lower pile at survey point;
xdistance between sensor installation point and shaft defect;
zdepth of survey point
2.2.4
Calculation coefficient
11
Other
s x standard deviation;
T signal cycle;
t corrected value of sound logging pipe and coupling the sound time of water layer;
t c sound time;
t i measured value of time and sound time;
t r ascending time of hammer force;
12
T time difference among the first peak of velocity wave and echo wave peak of
pile toe;
t x time difference between the first peak of velocity wave and defect echo wave
peak.
13
3. Basic Regulations
Bearing capacity& shaft integrity sampling testing of single pile shall be carried
out on engineering piles.
3.1.2
Testing methods for foundation pile shall be chosen according to 3.1.2. on the basis of
testing aim.
Form 3.1.2
Testing Method
Testing Aim
Vertical compression
resistance static test
of single pile
Core drilling
14
Testing shaft defect and its position, determine shaft integrity type
Crosshole sonic
logging
Test the shaft defect of cast-in-place pile and its position, determine
shaft integrity type.
3.1.3
Shaft integrity testing shall adopts two kinds or many kinds of proper testing method.
3.1.4
Foundation pile testing shall be executed before and after construction, and shall meet
testing method in this Code or other testing method in processional acceptance code,
testing shall be done during pile foundation construction process, quality control of
construction process shall be strengthened.
15
3.2
Testing Procedures
Investigation
Data collection
Prepare testing
scheme
Preparation in earlier
stage
Verification of
instrumentations
On-the-spot
Inspection
Testing report
Fig. 3.2.1
3.2.2
1
16
process.
2
3.2.3 According to investigation results and determined testing aim , operator shall choose
testing method, lay down testing scheme. Testing scheme shall contain the following
contents: job summary, standard for testing method and its reference, sampling scheme,
machines or labor needed, test cycle.
3.2.4
3.2.5
verification.
3.2.6
1
strain integrity
concrete strength of testing pile shall amount to at least 70% of design strength, and
shall not be less than 15MPa.
2
When core drilling testing is adopted, concrete age of the testing pile shall be 28d or
strength of preset curing sample under same conditions shall meet the designed
strength.
Quiescent time of the bearing capacity testing shall meet concrete strength stipulated in
the above Clause 2, if no mature local experience, time shall not be less than the time in
Form 3.2.6.
17
quiescent timed
Sandy soil
Silty soil
10
Non-saturated
15
Saturated
25
Glutinous soil
Note: for mortar-wall cast-in-place pile, quiescent time shall be delayed properly.
3.2.7
After construction, shaft integrity testing of job pile shall be done firstly, then bearing
capacity testing shall be followed. When foundation buried depth is bigger, shaft
integrity testing shall be done at the time of excavation of foundation pit up to
elevation of base.
3.2.8
Testing on site shall follow this Code and stipulations of safe production of the state. If
operational environment on site is not in conformity with requirements for use of
instrumentations, effective protection measures shall be taken.
3.2.9
When abnormal testing data are found, reasons shall be searched for re-testing .
3.2.10 Further verification or testing shall be confirmed by authorities concerned and shall be
executed according to Clause 3.4.1-3.4.7 of this Code.
3.3
3.3.1
Testing Quantity
If required by design, or in case of one of the following conditions, static test shall be
adopted before construction for confirmation of bearing capacity characteristic value of
vertical compression resistance of single pile:
18
3.3.2
If driven prefabricated pile meets one of the following conditions, high strain dynamic
testing shall be adopted for the purpose of process monitoring of trial piling:
3.3.3
The testing pile selection for single pile bearing capacity and shaft integrity
acceptance sampling testing shall meet the following regulations:
Besides the aforesaid regulations, pile of the same type shall be distributed uniformly
at random.
3.3.4
Selective examination quantity of shaft integrity testing of concrete pile shall meet the
19
following regulations:
1
Pile quantity for selective examination of pile cap of three piles under column or
below the three pipes shall not be less than one piece.
Note: 1.For end-support-type big-diameter cast-in-place pile, operator shall choose core
drilling or crosshole sonic logging within the scope of aforesaid selective
examination pile quantity to carry out shaft integrity testing on some testing piles.
Selective examination quantity shall not be less than 10% of total pile quantity.
2. For piles with artificially excavated bores on pile end bearing layer above
groundwater level and after telotremata, which have been examined and verified,
and, for single section of concrete-prefabricated pile, selective examination quantity
can be reduced properly, but it shall not be less than 10% of total pile quantity, shall
not be less than 10 pieces.
3. When pile quantity meeting stipulation of paragraph 1-4 of Clause 3.3.3 is more, or
in order to understand shaft integrity situation of the whole job foundation pile,
selective examination quantity shall be increased properly.
3.3.5
If job pile within unit job and under same condition meets one of the following
conditions,
20
3.3.6
For prefabricated pile out of Clause 3.3.5 and for cast-in-place pile which meets
applicable testing scope of high strain dynamic testing, high strain dynamic testing can
be adopted for the purpose of acceptance testing of vertical compression resistance
bearing capacity of single pile. When compared verification data under similar
conditions in local region are available, high strain dynamic testing can also become a
supplementation acceptance testing of vertical compression resistance bearing capacity
of single pile, as stipulated in Clause 3.3.5.Selective examination quantity shall not be
less than 5% of total pile quantity and shall not be less than 5 pieces.
3.3.7 For end-support-type big-diameter cast-in-place pile, when vertical compression
resistance bearing capacity of single pile fails to be tested due to limit by instrument or
site condition,, core drilling can be adopted for determination of dreg thickness at pile toe,
and core sample of pile end bearing layer can be drilled and taken for the purpose of
examination of pile end bearing layer. Selective examination quantity shall not be less
than 10% of total pile quantity and shall not be less than 10 pieces.
3.3.8 For pipe foundation that bears bigger pulling force and horizontal force, vertical
anti-pulling and horizontal bearing capacity testing of single pile shall be done. Testing
quantity shall not be less than l% of total pile quantity, and shall not be less than 3 pieces.
21
3.4
3.4.1
3.4.2
3.4.3
Prefabricated pile with crack in shaft or joint can be verified by high strain dynamic
testing.
3.4.4
Concrete quality problem of shaft is found in core-drilling testing in single bore, the
drilled bore shall be verified in same foundation pile.
3.4.5
For pile or type- pile whose integrity type cannot be explicated in low strain
integrity testing, methods suitable for static load testing, core drilling, high strain
dynamic testing, and excavation can be adopted for verification testing according to
actual situation
3.4.6
When bearing capacity of single pile or core drilling selective examination results do
not meet design, reasons shall be analyzed and selective examination shall be enlarged
after confirmation.
3.4.7
When sum of type and type piles found in selective examination on shaft
integrity by means of low
testing
and crosshole
sonic
strain
integrity
testing, high
strain
dynamic
sonic
logging can be
22
3.5
3.5.1 Appraisal of shaft integrity testing results shall provide shaft integrity type of every
piece of testing pile. Classification of shaft integrity shall meet Form 3.5.1 and shall be
classified according to technical contents stipulated in Chapter 7-10 of this Code.
Type-I pile
Shaft in complete
Type-II pile
Slight defect exists in shaft, which will not affect normal function
of shaft structure bearing capacity.
Type- pile
Type- pile
3.5.2
3.5.3
bearing capacity for each piece of testing pile, and give results whether bearing
capacity characteristic value of single pile of unit job under same condition design
meets requirement.
3.5.4
Testing report shall contain exact results and standard words and expresses.
3.5.5
1. Name of the entrusting party, name of job, place, construction, survey, design,
supervising unit and construction unit, foundation, structure type, quantity of layer,
23
design requirement, testing aim, testing reference, testing quantity, testing date;
2. Description of geographical conditions;
3. Pile serial number, pile position and relevant construction records of testing pile;
4. Statement of testing method, testing instrumentations, testing process;
5. Testing data, measurement and calculation/analysis curve, form and summary result of
testing pile;
6. Testing results relating to testing contents.
3.6
3.6.1
3.6.2
Testing personnel shall be qualified after being trained and have relevant qualification.
24
4.1
4.1.1
Scope of Application
testing pile.
4.1.2
If sensor or displacement pole for measurement of shaft stress, strain, pile toe
counterforce is embedded, layered side resistance and end resistance of pile or
displacement of shaft section can be measured.
4.1.3
If test pile is provided as a reference for the design, the pile shall be loaded until being
destroyed; bearing capacity of pile is controlled by shaft strength, the loading volume
required in the design shall be applicable.
4.1.4
When job pile sample is tested, loading volume shall not be less than design the
required bearing capacity characteristic value of single pile by 2.0 times.
4.2
4.2.1
Test loading shall adopt oil jack. When two and more sets of jacks are used for loading,
parallel connection and synchronous work are required, and the following regulations
shall be met.
25
1.
2.
4.2.2
1. Counterforce that can be provided by the loading counterforce device shall not be less
than maximum loading volume by 1.2 times.
2. Operator shall carry out a strength and deformation calculation on all members of
loading counterforce device.
3. Operator shall calculate anchor pile anti-pulling force foundation soil, uplift
reinforcement, pile joint; when job pile is used as anchor pile, anchor pile quantity
shall not be less than 4 pieces, and shall monitor uplift volume of anchor pile.
4. Mould weight shall be enough before testing and shall be placed on platform stably .
5. Stress of mould weight exerted on substrate shall not bigger than 1.5 times of bearing
capacity characteristic value of substrate, if applicable, job pile shall be used as stacking
pivot.
4.2.3 Load measurement can be determined directly by load sensor which is put on the jack;
or pressure meter or pressure sensor which is in parallel connection with jack oilway
shall be adopted to determine oil pressure, curve conversion load shall be determined
according to jack rate. Measurement error of sensor shall not be more than 1%,
accuracy of pressure meter shall be superior or equal level 0.4. Pressure of pressure
meter, oil pump, oil tube used for test in case of maximum loading shall not exceed
80% of specified working pressure.
4.2.4 Sedimentation measurement shall adopt displacement sensor or wide range dial
26
27
Form 4.2.5
Distance
counterforce
device
Anchor pile
4D and 2.0m
4(3)D and2.0m
4D and 2.0m
4D and 2.0m
4D and 2.0m
crossbeam
Mould weight
platform
earth anchor device
Note: 1. D is testing pile, anchor pile or design diameter or margin of earth anchor, the larger value is bigger.
2. In case of testing pile or cap-shape guttate or multiple tray decoration, center distance of testing pile and
anchor pile shall not be less than 2 times of expanded end diameter.
3. Values in bracket can be used for such circumstance that designed pile center distance of several rows of piles
is less than 4D in case of job pile acceptance testing
4. For soft soil stockyard, when weight is enlarged, distance between support pier side and datum pile center and
testing pile center shall be increased, vertical displacement of datum pile shall be observed in experiment
process.
4.2.6
When testing of pile side resistance and pile end resistance is required, sensor
embedded in shaft shall be executed in Annex A of this Code.
28
4.3
4.3.1
Piling technology and quality control standard of testing pile shall be consistent with
that of job pile.
4.3.2
Pile top shall be higher than bottom surface of the testing pit, bottom surface of the
testing pit shall be consistent with elevation of pile cap. Concrete pile head shall be
consolidated according to Annex B of this Code.
4.3.3
Cast-in-place pile used as anchor pile and the prefabricated concrete pile with joint, its
shaft integrity shall be tested before testing.
4.3.4
1. Loading shall be executed stage by stage, loading shall be executed in equal volume
stage by stage; the grading load shall be maximum loading volume or 1/10 of estimated
limit bearing capacity, in which the first level shall be 2 times of grading load.
2. Unloading shall be carried out stage by stage, unloading volume of each level shall be 2
times of grading load in case of loading, unloading shall be executed in equal volume
stage by stage;
3. In case of loading/unloading, load shall be transferred uniformly and continuously,
change range of load of every level during maintenance of process shall not exceed
10% of the grading load.
4.3.5
4.3.6
Steps for low-speed maintenance load testing test shall meet the following regulations:
1. After load of every level is exerted, operator shall measure and read sedimentation
volume of pile top according to 5, 15, 30, 45, 60 minutes respectively, and shall
29
30
2. Under load action of a certain level, if sedimentation volume of pile top is more than 2
times of sedimentation volume under load action of previous level, and has not reached
relatively stable standard after 24 hours.
3. It has reached maximum loading volume required by design.
4. When job pile is used as a anchor pile, uplift volume of anchor pile has reached
allowable value.
5. When load sedimentation curve presents a slow change shape, it can be loaded till total
sedimentation volume of pile top reaches 6080mm; under special circumstance, it
can be loaded according to detailed demands until the accumulated sedimentation
volume of pile top is more than 80mm.
4.3.9
Testing data shall be recorded according to format of Form C.0.1 of Annex c of this
Code.
4.3.10
When testing the pile side resistance and pile end resistance, measuring and reading
time of the testing data shall meet Clause 4.3.6.
4.4
4.4.1
31
record form of relevant data, and draw shaft axis distribution diagram according to
Annex A of this Code, and calculate layered side friction resistance and end resistance
value of different soil layer.
4.4.2
4. For slowly changed Q-s curve, operator shall load value corresponding to S40mm
according to sedimentation volume; when pile length is more than 40m, elastic
compression of shaft shall be considered; For pile with diameter more than or equal to
800mm, load value corresponding to s=0.05DD is pile end diametershall be taken.
Note: when vertical compression resistance bearing capacity which is used for determining the pile
according to the aforesaid Clause IV does not reach limit, maximum test load value shall be taken
for limit bearing capacity of vertical compression resistance of pile.
4.4.3
The counting value limit bearing capacity of vertical compression resistance of single
pile
1. For the testing pile results participating in counting, when its range does not exceed
30% of average value, average value shall be taken as limit bearing capacity of vertical
32
4.4.5 The testing report shall include contents of Clause 3.5.5 of this Code and shall include:
1. Geologic log corresponding to pile position of testing pile;
2. Size of testing pile and anchor pile, material strength, anchor pile quantity,
reinforcement arrangement;
3. The loading counterforce type and stacking method shall indicate stacking weight,
anchor pile testing method shall have counterforce beam layout;
4. Load/download method, load grading;
5. Curve and relevant data form; and curve and data for determining the bearing capacity,
required by this Code 4.4.1
6. Reference for determining the bearing capacity;
7. In case of testing the hierarchical friction resistance, sensor type installation position,
axis calculation method, change curve of shaft axis under all levels of loads, pile side
limit friction resistance and pile end resistance of each soil layer shall be available,
33
5.1
Scope of Application
5.1.1
This method is applicable for testing the vertical uplift bearing capacity of single pile.
5.1.2
When sensor for measuring shaft stress and strain is embedded, or displacement
measurement pole is embedded at pile end, uplift friction resistance of pile side or
uplift volume of pile end can be measured directly,.
5.1.3
Test pile provided for reference of design shall be loaded until pile side soil is
destructed or shaft material is up to design strength; In case of sampling testing of job
pile, maximum loading volume can be determined according to design.
5.2
5.2.1
Loading device for uplift pile test shall adopt oil jack, loading mode shall meet Clause
4.2.1 of this Code.
5.2.2
Test counterforce device shall adopt counterforce pileor job pileto provide pedestal
counterforce, and shall adopt natural substrate according to site condition to provide
pedestal counterforce. Counterforce rack system shall have 1.2 times of safety factor
and meet the following regulations:
5.2.4
Technical requirement uplift volume measurement of pile top and its apparatus shall
meet Clause 4.2.4 of this Code.
Note: Observation point of uplift volume of pile top can be fixed on shaft concrete of pile top
surface.
5.2.5
Center distance among test pile, pedestal and datum pile shall meet Form 4.2.5.
5.2.6
When uplift friction resistance distribution of pile side or uplift displacement of pile
end is required to be tested, sensor embedded in shaft or displacement pole embedded
at pile end
5.3
5.3.1
On-the-spot Testing
For concrete cast-in-place pile and prefabricated pile with joint, low
strain
integrity testing shall be adopted for testing the shaft integrity of pile before uplift test.
When construction of uplift cast-in-place pile which is provided as a reference of
design shall be subject to pore forming quality testing, if pile with obvious hole
enlargement is found in middle or lower part of shaft shall not used as uplift test pile;
for prefabricated pile with joint, joint strength shall be calculated.
5.3.2
Low-speed maintenance load testing shall be applicable for vertical uplift static test of
35
single pile. If necessary, multiple cycle load/unload testing method can also be adopted.
Load/unload classification of low-speed maintenance load testing method, test method
and stability standard shall be executed according to Clause 4.3.4 and 4.3.6 of this
Code, crack of shaft concrete shall be observed carefully.
5.3.3
1. Under action of load at a certain level, uplift volume of pile top is bigger than uplift
volume under uplift load action of the previous level by 5 times.
2. If it is controlled according to uplift volume of pile top, when accumulated uplift
volume of pile top is more than 100mm.
3. If it is controlled according to reinforcement tensile strength, when uplift load of pile
top is up to 0.9 times of reinforcement strength standard value.
4. For job pile of acceptance sampling testing, when it is up to maximum uplift load value
required by design.
5.3.4
Testing data shall be recorded according to Format C.0.1 in Annex C of this Code .
5.3.5
Side uplift resistance of the testing pile or uplift displacement of pile end, measuring
and reading time of data shall meet regulations of Clause 4.3.6 of the Code.
5.4
5.4.1
For clear up data, operator shall draw uplift load vs uplift volume ( U )of pile top
relation curve and uplift volume of pile top-logarithm of time( s lg t )relation curve.
5.4.2
Vertical anti-uplift limit bearing capacity of single pile can be determine according to
the following method:
36
1. It is determined according to characteristics that uplift volume changes along with load:
For rapid-rise U curve, load value corresponding to the starting/ending point for
rapid rise;
2. It is determined according to characteristics that uplift volume changes along with time:
operator shall take load value of previous level of obvious bend curve tail or obvious
rapid rise of slope of s lg t curve.
3. When uplift reinforcement breaks under load at a certain level, operator shall take load
value of previous level.
5.4.3 Determinations of counting value of vertical uplift limit bearing capacity of single pile
shall comply with Clause 4.4.3 of the Code.
5.4.4 When testing pile used as acceptance sampling testing under maximum uplift load
action, if paragraph 3 listed in Clause 5.4.2 of this Code does not occur, the value can
be determined according to design.
5.4.5 Value of vertical uplift bearing capacity characteristic value of single pile of unit job
under same condition shall be taken according to one second (0.5 times) of counting
value of vertical uplift limit bearing capacity of single pile.
Note: when job pile does not allow crack in job, load at the previous level of shaft crack as vertical uplift
bearing capacity characteristic value of single pile is taken. Compared with bearing capacity
characteristic value determined according to one second (0.5 times) of limit load value, smaller
value shall be taken.
5.4.6 The testing report shall include contents of Clause 3.5.5 of this Code and also include:
1. Geologic log corresponding to testing pile position;
2. Testing pile sizecast-in-place pile shall indicate aperture curveand reinforcement
fixing situation;
3. Load/download method, load grading;
37
38
6.1
6.1.1
Scope of Application
This method is applicable for Single pile horizontal static load test when pile top is
free; please refer to horizontal static load tests in other forms.
6.1.2
This method is applicable for testing horizontal bearing capacity of single pile, so as to
conclude proportion factor of foundation soil reaction coefficient.
6.1.3
Sensor for measuring shaft strain has been embedded, shaft stress under the
corresponding horizontal load action can be measured, and hence bending moment
of shaft shall be calculated.
6.1.4
Test pile provided as an reference for design shall be loaded until larger horizontal
displacement or shaft structure occurring in pile top; for sampling testing of
engineering pile, loading can be controlled according to horizontal displacement
allowable value required by design.
6.2
6.2.1 Oil jack shall be used in loading device with horizontal thrust, loading capacity shall not
be less than 1.2 times of maximum test load.
6.2.2 Counterforce of horizontal thrust can be provided by neighboring pile; when
counterforce structure is designed exclusively, its bearing capacity and rigidity shall be
1.2 times of that of test pile.
39
6.2.3 Technical requirements of load measurement and its instrumentations shall meet Clause
4.2.3 of this Code; horizontal force action point shall be consistent with actual
engineering elevation of bottom surface of pile cap of pile foundation; jack and test pile
contact surface shall be equipped with spherical bearing, acting force of jack shall pass
through shaft axes horizontally; contact surface between jack and test pile shall be
bolstered up.
6.2.4 Technical requirements for horizontal displacement measurement of pile and its
instrumentations shall meet Clause 4.2.4 of this Code. On both sides of test pile of
action plane of horizontal force shall be provided with two symmetrical displacement
meter installation; when measuring pile is needed to extrude outer corner, two
displacement meters shall also be installed symmetrically on both sides test pile, which
is 50cm above horizontal force action surface.
6.2.5 Datum mark of displacement measurement shall be set without any influence by test and
other factors, datum mark shall be set on the side of test pile which is opposite to
displacement direction and is vertical with acting force direction, clear distance between
datum mark and test pile shall not be less than of pile diameter by 1 time.
6.2.6 In case of measurement of shaft stress or strain, measurement sensor of each testing
section shall be arranged symmetrically, along stress direction, on tensioned and
pressed main reinforcement which is far away neutral axis; inclination between
longitudinal section of the embedded sensor and stress direction shall not more than 10
. Test section of main underground stress part with 10 times of pile diameterpile
widthshall be thickened, clearance between sections shall not more than pile diameter
by one time; if the clearance is more than this depth, clearance of test section can be
enlarged properly. Sensor shall be embedded in shaft according to Annex A of this
Code.
40
6.3
On-the-Spot Inspection
6.3.1 Loading method shall be unilateral multi-cycle loading method or low-speed maintained
load method stipulated in Chapter Four of this Code according to actual stress
characteristics of
according to design requirements. Test pile which needs measurement of shaft stress or
strain shall adopt maintenance load method.
6.3.2 Test load/unload mode and horizontal displacement measurement shall meet the
following regulations:
1. Grading load of unilateral multi-cycle loading method shall less than estimated 1/10 of
bearing capacity of horizontal limit or maximum test load. After applying load at every
level, operator shall measure and read horizontal displacement after executing dead load
for 4 minutes, and then unload to zero, stop for 2 minutes, measure and read remaining
horizontal displacement, thus a load/unload cycle can be completed, execute this cycle
for 5 times. Displacement observation of grade-I load shall be completed. Test shall not
be paused.
2. Load/unload grading, test method and stabilization standard of low-speed maintenance
load method shall be executed according to Clause 4.3.4 and 4.3.6 of this Code.
6.3.3 In case of one of the following circumstances, loading can be stopped:
1. Shaft breaks off;
2. Horizontal displacement is more than 3040mm40mm for soft soil;
3. Horizontal displacement meets allowable value of horizontal displacement required by
design.
6.3.4
Measured Data shall be record as per format provided in enclosed form c.0.2 of Annex
41
C of this Code.
6.3.5
6.4
6.4.1
curve,
horizontal
force vs
displacement
42
m=
(v y .H )
b0Y
5
3
5
3
( EI )
6.4.1-1
2
3
mb 5
a= 0
EI
6.4.1-2
Where:
m Proportion factor of horizontal reaction coefficient on subgradekN/m4;
a Horizontal deformation coefficientm-1of pile;
y =2.441;
H Horizontal forcekNacting on the ground;
b0
calculation width of shaftm; for annular pile: when pile diameter D1m,
b=0.91.5D+0.5; when pile diameter
D1m, b0 = 0.9D+1. For rectangular pile: when margin B1m, b0 =1.5B+0.5;
when margin B1m, b0 B+1.
6.4.2 The following curves shall be drawn for test embedded stress or strain measurement
sensor, and the corresponding data shall be listed in forms:
1. Distribution graph of bending moment of shaft under action of horizontal force at each
level;
43
2. Pulling/stress
reinforcement.
6.4.3
Horizontal critical load of single pile can be determined according to the following
methods:
Take
horizontal
load
value
corresponds
to
the
first
inflexion
on
H Y0 / H curve or lg H lg Y0 curve.
3. Take horizontal load value corresponds to the first inflexion on H s curve.
6.4.4
4. Horizontal load value of previous level shall be taken when shaft breaks or tensioned
44
reinforcement yields.
6.4.5
Horizontal ultimate bearing capacity and counting value of horizontal critical load of
single pile shall meet Clause 4.4.3 of this Code.
6.4.6
6.4.7
Besides Clause 6.4.6 of this Code, when horizontal bearing capacity is controlled
according to horizontal allowable displacement required by the design, horizontal load
corresponding to horizontal allowable displacement required by the design can be
taken as horizontal bearing capacity characteristic value of single pile, but the value
shall meet anti-crack
6.4.8
The testing report shall include contents of Clause 3.5.5 in this Code, and shall also
include:
When reinforcement stress testing is carried out, and shaft bending moment is hence
calculated, sensor type, installation position, method for calculation of internal force,
45
and curve and its relevant data form required to be drawn by Clause 6.4.2 shall be
available. .
46
7. Core Drilling
7.1
Scope of Application
7.1.1 This method is applicable for testing the pile length, shaft concrete strength, dreg
thickness of pile toe and shaft integrity of concrete filling pile, for the purpose of
determination or identification of rock and soil character of end bearing layer of pile.
7. 2
Equipment
7.2.1 Drilling machine operated by hydraulic pressure shall be used for taking core sample.
Instrument parameters of drilling machine shall meet the following regulations:
1. Rated maximum rotating speed is not lower than 790 r / min .
2. Scope for adjustment of rotating speed is less than 4 tier.
3. Rated working pressure shall not less than 1.5MPa.
7.2.2
Driller shall be equipped with single-action dual-duct driller and relevant orifice pipe,
underreamer, snap spring, posing stabilizer and driller than can take soft and loose
dregs out. Drilling pole shall smooth and straight, diameter shall be 50mm.
7.2.3 Drilling bit shall be diamond with proper granularity, concentration and matrix hardness
according to concrete design strength grade, and outer diameter shall not be less than
100 mm. Matrix of the drilling bit shall not have visual cracks, wany edge, corner
47
Water discharge of water pump shall be 50160 L / min , pump pressure shall be
1.0-2.0 Mp a .
7.2.5
Saw used for sawing and cutting core sample shall have device for cooling the system
and for tightening the core sample, the matched diamond circular saw blade shall have
enough rigidity.
7.2.6
Screeder and planishing machine used for end surface of core sample shall meet
requirement for making the core sample .
7.3
On-the-Spot Operation
7.3.1 Core-drilling bore counts and core drilling position of each piece of the testing pile shall
meet the following regulations:
1. Pile with a pile diameter of less than 1.2m shall be drilled one bore, pile with pile
diameter of 1.2-1.6m shall be drilled two bores, pile with pile diameter of more
than1.6m shall be drilled three bores.
2. In case of one core-drilling bore, the bore shall be opened in a position 10-15 cm away
from pile center; In case of two or above core-drilling bores, the bore shall be opened
uniformly and symmetrically in a position 0.15-0.25D cm away from pile center
0.15-0.25D.
3. For drilling of end bearing layer of pile, each piece of the testing pile shall not be less
than one bore, and drilling depth shall meet design requirement.
7.3.2
Drilling instrument shall be installed correctly and firmly, pedestal shall be horizontal.
48
Vertical shaft center of driller, head sheave centerpoint of tangency of front edge of
overhead craneand orifice center must be on same plumb line. Operator shall ensure
that no inclination, displacement of driller will occur in core-drilling process,
deviation of verticality of core-drilling bore shall not be more than 0.5%.
7.3.3
When distance between pile top surface and driller pedestal is bigger, orifice pipe shall
be installed vertically and firmly.
7.3.4
In drilling process, circulating water flow in drilling bore shall not be interrupted,
drilling velocity shall be adjusted according to sand content and color of return water.
7.3.5
When core sample is taken by pulling out way, drilling bit and underreamer shall be
screwed and unloaded, core shall not be unloaded by hammering.
7.3.6
Round trip meterage shall be controlled within 1.5m; when drilling to pile toe, dreg
shall be drilled and taken by using suitable core-drilling method and technology, and
then dreg thickness shall be determined, rock and soil character of end bearing layer of
pile shall be identified by suitable method.
7.3.7
sequence from up to down , core sample with round trip quantity, block number, total
block quantity of this round trip shall be clearly indicated on side surface, and the
drilling situation and drilling abnormal situation shall be recorded timely according to
format of Form D.0.1-1 of Annex D of this Code, preliminary description shall be
made on core sample quality.
7.3.8
During core-drilling process, concrete of core sample, dreg of pile toe and end-bearing
layer of pile shall be recorded in details as per format of Form D.0.1-2 of Annex D of
this Code.
7.3.9 After core-drilling operation is finished, photos of core sample and marking board
marked with engineering name, pile number, core-drilling bore number, sampling
49
position for core sample, pile length, bore depth, testing unit name shall be shot.
7.3.10
when quality appraisal of single pile meets the design, 0.51.0 Mp a pressure shall
be adopted, re-inject grout upwards from core-drilling bore bottom and seal off it;
otherwise, shall core-drilling bore shall be sealed off for treatment.
7 .4
7.4.1
Concrete compression resistance core sample shall be taken according to the following
regulations:
1. When pile length is 10-30m, 3 groups of core samples shall be taken; when pile length
is less than 10m, 2 groups can be taken, when pile length is more than30m, not less
than 4 groups.
2. Distance between the upper core sample position and the designed elevation of pile top
shall not be more than one time of pile diameter or 1m, distance between the lower
core sample position and pile toe shall not be more than one time of pile diameter or
1m, middle core sample shall be taken in equal clearance.
3. When samples can be taken in defect position, a group of core samples shall be taken
for concrete compression resistance test.
4. When core-drilling bore quantity of same foundation pile is more than one, in which, if
one bore has defect at a certain depth, core sample shall be taken at this depth of other
bores
7.4.2
When pile end-bearing layer is middle weak weathering terrane and core can be made
into a test piece, a group of rock core samples shall be taken from nearby pile toe;
50
Three core samples for compression resistance shall be made in each group of core
sample . Core sample shall be processed and measured according to Annex E of this
Code.
7. 5
7.5.1
7.5.2
7.5.3 After compressive strength test, if average diameter of core sample is founded to be
less than 2 times of maximum grain diameter of concrete coarse aggregate in the test
piece, and if strength value is abnormal, strength value of this test piece shall not
participate in counting the average value.
7.5.4
f cu =
4p
d 2
7.5.4
51
Monaxial compressive strength test of drill core of pile toe can be executed according
to current national standard---Construction Subgrade Foundation Design Code
(GB500072002 Annex J).
7. 6
7.6.1
7.6.2
7.6.3
For end bearing layer character of pile, rock and soil characteristics of pile end bearing
layer of pile shall be determined according to characteristics of core sample,
52
monoaxial compressive strength test of rock core sample, dynamic sound logging or
standard penetration test results ,
7.6.4 Shaft integrity type shall be determined according to core-drilling bore counts,
characteristics of concrete core sample on site, monoaxial compressive strength test
results of core sample, according to characteristics specified in Form 3.5.1 and Form
7.6.4 of this Code.
7.6.5
Appraisal of piling quality shall be executed according to single pile. In case of the
following circumstances, operator shall determine whether the following testing piles
are not meet design requirement:
1.
2.
3.
Pile whose pile length and dreg thickness of pile toe do not meet design or this Code.
4.
Pile whose soil characterstrengthor thickness of end bearing layer of pile does not
meet design or this Code.
53
Characteristics
Concrete core sample is continue, complete, smooth in surface, in good cementation, uniform
in aggregate distribution, in long column shape, anastomosing fracture, a small quantity of air
vents can be seen on side of core sample.
Concrete core sample is continue, complete, in good cementation, uniform in aggregate
7.6.6
If core-drilling bore deviates pile, appraisal shall be only made on part which is used
for drilling the core sample.
7.6.7
Testing report shall include contents of Clause 3.5.5 of this Code, and shall include:
1.
Core-drilling instrument;
2.
Testing pile quantity, quantity of drilled bore, overhead, concrete core footage,
footage of drill core, total footage, group count of concrete test piece, group count of
rock test piece, dynamic sound logging or standard penetration test results ;
3.
Histogram of each hole shall be drawn according to format in From D.0.1-3 of Annex
54
D of this Code;
4.
5.
6.
55
8.1
8.1.1
Scope of Application
This method is applicable for testing the shaft integrity of concrete pile so as to
determine degree and position of shaft defect.
8.1.2
Effective testing pile length scope of this method shall be determined by on-the-spot
test.
8.2
8.2.1
Instrumentations
Main technical performance index of the testing instrumentations shall meet the
current industrial standard Dynamic Testing Instruments of Foundation Pile (JG/T3055)
and shall have functions of signal display, storage, treatment and analysis.
8.2.2
Transient state excitation instrument shall include hammer and pallet that can excite
broad pulse and spike pulse ; hammer can load force sensor; transient state excitation
instrument shall include electromagnetic steady state excitation with swept frequency
range of 102000 Hz and adjustable excitation force.
56
8.3
8.3.1
On-the-Spot Inspection
1.
2.
For material of pile head, strength, section size shall be approximately same with
shaft.
3.
Pile top surface shall flat, smooth, dense, and shall be approximately vertical with pile
axes.
8.3.2
1.
2.
The preset pile length shall be length from survey point of pile top to construction pile
of pile toe, the preset shaft section area shall be construction section area.
3.
Shaft wave velocity can be set preliminarily according to testing value of same type
of pile in local region.
4.
The sampling time interval or sampling frequency shall be set according to pile length,
shaft wave velocity and frequency domain resolution shall be chosen reasonably;
sampling point of time domain signal shall not be less than 1024 points.
5.
8.3.3
1.
Installation of sensor shall be vertical with pile top surface; and the sensor shall have
enough binding strength if sensor is bound by using couplant.
57
2.
Excitation point position of solid pile shall be chosen at pile center, measurement
sensor installation position shall be 2/3 of radius of pile center; excitation point of
hollow pile and installation position of measuring sensor shall be on same horizontal
surface, inclination between this surface and the connecting line of pile center shall be
90, excitation point and installation position of the measuring sensor shall be 1/2 of
thickness of pile wall.
3.
Excitation point and installation position of the measuring sensor shall be free of
influence of main reinforcement of reinforcement cage.
4.
5.
Transient state excitation shall be subject to on-the-spot tap test, operator shall choose
excitation hammer and pallet with proper weight, and shall obtain pile toe or defect
echo signal at lower part of shaft by using broad pulse, and shall obtain defect echo
signal at higher part of shaft by using spike pulse.
6.
For excitation of steady state, operator shall obtain stable response signal under each
preset frequency, and shall adjust excitation force according to pile diameter, pile
length and pile soil restrain.
8.3.4
1. According to pile diameter, 2-4 testing points shall be arranged at pile center
symmetrically; valid signal counts recorded by each testing point shall not be less than
3.
2. Check and judge whether the actually-measured signals have reflected shaft integrity
characteristics.
3. Consistency between different testing points and time domain signal measured after
many times is poorer, operator shall analyze reason and increase testing point quantity.
4. Distortion and null shift of signal shall be avoided, signal value shall not be more than
58
8.4
8.4.1
Determination of average value of wave velocity of shaft shall meet the following
regulations:
1.
When pile length has been known and echo signal of pile toe is explicated, in
foundation pile with same geographical conditions, design pile type and piling
technology, operator shall choose shaft wave velocity value of type-I pile of not less
than 5 pieces, its average value shall be calculated according to the following formula:
cm =
1 n
ci c
n i =1
8.4.1-1
ci =
200 L
T
8.4.1-2
ci = 2 L f
8.4.1-3
ci shaft wave velocity valuem/sof No. i piece of the testing pile, and
ci c m / c m 5%
59
When the value cannot be determined according to the aforesaid clause, average value
of wave velocity can be determined according to actually-measured value of same pile
type and piling technology in local region in other pile foundation works with the
same pile type and piling technology in local region, and according to aggregate
variety and strength grade of shaft concrete.
8.4.2
x=
1
t x c
2000
x=
8.4.2-1
1 c
2 f /
8.4.2-2
t x time differencembetween the first peak of velocity wave and defect echo
wave peak;
c shaft wave velocitym/s) of the testing pile can be substituted by c value if the
value cannot be determined.
For shaft integrity type, attenuation characteristic of signal, designed pile type, piling
technology, geographical conditions, construction circumstance shall be tested
according to depth of defect, and shall be analyzed and determined according to
actually measured time domain or amplitude frequency signal characteristics
stipulated in Clause 3.5.1 and Form 8.4.3 of this Code.
60
f c / 2 L
Before the time of 2 L / c , slight defect echo wave occurs, and pile
c / 2 L , frequency
peak
f / f c / 2 L
With obvious defect echo wave, other characteristics are between typeand .
neighboring
shall be as
follows f
frequency difference
f c / 2 L ,there is no pile
Note: For foundation pile with same site, similar geographical conditions, pile type and piling technology, when no pile toe
echo wave occurs in actually measured signal due to impedance of shaft and impedance of bearing stratum of pile end, shaft
integrity type with pile toe echo wave can be determined according to other piles with actually-measured signals under same
conditions of this site.
61
8.4.4
For concrete filling pile, when time domain signal is used for analysis, after shaft
section change gradually, it restores to primary echo at sudden change position of
impedance of the original pile diameter, or secondary echo at sudden change position
of diameter expansion, determine integrity type of the testing pile according to
analysis
piling
technology
and
geographical
conditions.
If
necessary,
For rock-socketed pile, when time domain echo signal of pile toe is single echo wave
and has same direction with hammering impulse signal, other methods shall be
adopted for verification of rock-socketed situation of pile end.
8.4.6
Actually measured signals are complicated and has no rule, so exact appraisal on it
cannot be available..
2
8.4.7
Concrete filling pile with gradual or frequent large changes of shaft section.
Low strain testing report shall provide actually measured signal curve of shaft
integrity testing.
8.4.8
The testing report shall include Clause 3.5.5 of this Code and shall also include the
following:
1
62
9.2 Equipments
9.2.1 The major technical index of the test machine is not be lower than that of 2 grade in
JG/T 3055 of the dynamic test machine of the foundation pile. And saving and
displaying the measured force and speed signal and signal processing and analysis
function are also required.
9.2.2 The hammering equipment should have stable guide device, and pile driving machine
and similar devices can all be used.
9.2.3 The heavy hammer used in the dynamic high strain measurement should be symmetric
and have a smooth bottom. And it is to be made of cast-iron or cast-steel with a ratio of
63
height and width no less than 1. The hammer is required to be cast as an integral one
when the hammering force is measured by acceleration sensor. And it ratio of height
and width should be within 1.01.5.
9.2.4 Upon the dynamic high strain measurement, the weight of the hammer should be over
1.0%1.5% of the estimated maximum bearing capacity of a single pile. When the
diameter of the concrete pile is over 600mm or its length over 30m, the high value will
be adopted.
9.2.5
Penetration of the pile can be measured by apparatus as the precise level gauge.
The time effect of the pre-cast pile bearing capacity will be determined by re-tapping.
The top of the pile must be even and smooth, and it height is able to meet the
requirement of the hammering equipment. The gravity center of the hammer is to be
right above the top of the pile, and the frame of the hammering equipment should be
erected vertically.
Pile head unable to bear the force of hammering should be strengthened. The head of
concrete pile is to conform to appendix B of the code.
A cushion is required for the top of pile, which is to be made of 1030mm wooden
board, plywood or similar material.
The interval of the sampling is better to be 50200s, and the sampling points no
64
The set value of the sensor is based upon the metrological verification result.
When the force is measured by acceleration sensor, the set value of the forced is
determined by sensor set value multiplied by the mass of the heavy hammer.
The cross-section at the measuring point, the wave speed, mass density and the elastic
ratio are all to be determined according to the real situation.
Data from the design documents and construction records can be used as the set value
for pile length and cross-section below the measuring point.
The mass density of pile material should be in accordance with table 9.3.2.
Table 9.3.2
concrete
steel pile
centrifugal pile
cast-in-place pile
7.85
2.452.50
2.552.60
2.40
The wave speed of the pile can be set according the local experience or the measured
average wave speed of similar type on the same site, which is to be adjusted after the
site measurement in accordance with article 9.4.3.
The elastic modulus of the pile material is to be calculated according to the following
formula:
E = p c2
Eelastic modulus of the pile materialkPa
cpropagation velocity of the pile stress wavem/s
pmass density of the pile materialt/m3
65
9.3.2 .
When the crack at the Sensor Installation Place or serious plastic deformation makes
66
9.4.4 When the set wave speed of the test point changes with the adjusted wave speed of the
pile, adjustment of elastic modulus of pile material and signal amplitude of hammering
force should meet the following stipulations:
1 The elastic modulus of pile material is to be re-calculated according the code9.3.2.
2 When strain sensor is applied in measurement of force, the original measured force
should be corrected accordingly.
9.4.5 When miss ratio is found between the measured high stain force and the first peak of the
67
The material of the pile should be even, and the cross-section smooth.
The damp coefficient J c is to be verified through static loading test under the same
condition, or to be determined by fitting of the measured curve upon available relative
reliable material under similar conditions. Upon fitting, the number of piles should be
less than 30% of the total piles and should be over 3.
68
The extreme difference of the value should not be more than 30% of the average under
the same site, of the same geological condition and of similar piles and similar
cross-sections.
9.4.9 The formula for calculation of bearing capacity of a single pile with CASE method lies
as follows:
When the earth resistance is clearly later or earlier than the time t1+2L/c, and
results in strong rebound of the middle upper part of the pile, the following method is
69
when necessary.
3 Under the same conditions, the characteristic number Ra of the bearing capacity of a
single pile of a unit project should be half of the statistic number of the bearing
capacity of a single pile as acquired through this method.
9.4.12 The integrity of the pile can be determined by the following methods:
1. With fitting of the measured curve, the pile-earth parameter required should meet the
requirement of clause 2 of the code 9.4.10. According to different pile technology, the
fitting could be that of pile resistance or that of pile crack (including joint crack of
pre-cast concrete pile).
2. It can be determined according to table 9.4.12 and experience for piles of the same
cross-sections. The integrity coefficient of pile and the defect position x will be
calculated respectively according to the following formula.
R x The estimated value of the earth resistance above the defect is equal to the
force in the start point of the defect reflection wave minus the velocity
multiplied by the dynamic resistance of the pile cross-section. For the method,
see table 9.4.12.
71
Type
value
Type
value
=1.0
0.60.8
0.81.0
0.6
9.4.13 Upon any of the following situations, the pile integrity is to be determined
comprehensively according to the geological condition and construction technology of
the project combined with fitting of the measured curve or other test method.
1
Cast-in-place concrete pile with cross-section of gradual change or pile with varied
cross-section.
72
9.4.14 The maximum hammering tension and compression stress of the pile and the actual
power transferred to the pile are to be calculated according to relative formula in
appendix G of the code.
9.4.15 The curve of the measured force and rate signal should be provided in the dynamic
high-strain test report.
9.4.16 Apart from what listed in 3.5.5 of the code, the following is also to be included in the
test report:
1 The actual wave speed of the pile and J c in calculation;
2 Model parameter of each unit pile-earth, fitting curve and distribution of earth
resistance along the pile as selected in the fitting of the measured curve;
3 The measured penetration;
4 Size of hammer, type of hammer cushion and also times of hammering, static
resistance at both side and end of the pile, tension and compression hammering stress
of the pile, the integrity of pile as well as change of power transfer ratio along with
change of depth of earth penetration.
73
10.1
Scope of Apllication
10.1.1 The method is applicable to test of integrity of cast-in-place concrete pile with built-in
pipe and to determination of degree of defect and its position.
10.2
Equipments
10.2.1 The energy converter of sending and receiving sound wave should be able to meet the
following requirements:
1 Cylindrical radial vibration with no radial directivity;
2 The outer diameter must be smaller than the inner diameter of the sound logging pipe
and the axis length of the effective working surface should not be over 150mm;
3 The harmonic frequency is better to be 3050kHz;
4 No water penetration under water pressure of 1MPa.
10.2.2 Requirements for sound wave test device:
1 It should have the function of real-time display and record of temporal curve of the
received signals, of frequency measurement and frequency spectrum analysis.
2 The resolution of phonation time measurement should be no worse than 0.5 s , the
relative error of the sound wave amplitude small than 5%, the frequency width of the
system 1200kHz and the maximum dynamic scope of the system not smaller than
74
100dB.
3 The transmitted pulse of the sound wave should be that of phase step or rectangle with
a volt amplitude of 2001000V.
10.3.1 The sound logging pipe should be set according to appendix H of the code.
10.3.2 Requirements for preparations before the site test:
1 The delay time of the system and apparatus is to be fixed through standardization.
2 To calculate the modified value of the sound logging pipe and the phonation time of the
coupling water layer.
3 To measure the net distance of the sound logging pipe on the top of the pile.
4 To fill the pipe with water to see whether it is unblocked and to make sure that the
energy converter and rise and fall unblocked completely.
10.3.3 The site test is to meet is following stipulations:
1 The passing depth of the transmitting and receiving sound wave energy converters are
to be marked at the test points of the two sound logging pipes.
2 The transmitting and receiving sound wave energy converters should be of the same
height markChart 10.3.3aor maintain the fixed height differenceChart 10.3.3b),
and the distance between the test points is better not over 250mm.
75
Chart 10.3.3 Plane test, oblique test and sector-shaped scanning test
aplane test boblique test csector-shaped scanning test
Real-time display and record of the temporal curve of the receiving signal. The
frequency spectrum curve and the value of the dominant frequency should be
displayed at the same time upon reading the phonation time, peak value of the head
wave and the periodic value.
Each two pipes are to be combined to form a test section among all the pipes, and all
the test sections should be tested.
Around test points in pile of doubtable quality, more points should be chosen. Or the
method of oblique test or sector-shaped scanning test may be applied for
re-examination to determine the position and scope of the pile defect.
During test of various sections of the same pile, the transmitting voltage of the sound
wave and the set parameter of the device will maintain the same.
10.4.1 The phonation time t c , sound speed t c , wave amplitude A p and the dominant
76
frequency f are all test data from the site and are to be calculated according to the
following formula. The sound speed-depth v z )curve, the wave amplitude, and the
depth A p z )curve will be drawn, so will the supplementing dominant-depth
f z
l the net distance between the outer walls of the two sound logging pipes of each
test sectionmm
77
f i the dominant frequency of test point i kHz, which can also be acquired from
signal frequency spectrum
v1 v 2 vi vn k vn 1 vn k=012
10.4.2-1
78
Table 10.4.2
value
nk
20
22
24
26
28
30
32
34
36
38
1.64
1.69
1.73
1.77
1.80
1.83
1.86
1.89
1.91
1.94
nk
40
42
44
46
48
50
52
54
56
58
1.96
1.98
2.00
2.02
2.04
2.05
2.07
2.09
2.10
2.11
nk
60
62
64
66
68
70
72
74
76
78
2.13
2.14
2.15
2.17
2.18
2.19
2.20
2.21
2.22
2.23
nk
80
82
84
86
88
90
92
94
96
98
2.24
2.25
2.26
2.27
2.28
2.29
2.29
2.30
2.31
2.32
nk
100
105
110
115
120
125
130
135
140
145
2.33
2.34
2.36
2.38
2.39
2.41
2.42
2.43
2.45
2.46
nk
150
160
170
180
190
200
220
240
260
280
2.47
2.50
2.52
2.54
2.56
2.58
2.61
2.64
2.67
2.69
vn k and its following data are abnormal, which should therefored be taken out. The
calculation precedure with application of v1 vn k 1 in formula 10.4.2-2
79
10.4.2-4will be repeated until the remaining data in sequence vi meet the follwing
requirement:
vi v 0
10.4.2-5 .
And then, v0 is the critical abnormal determination value of the sound speed vc .
4
The basis for determination of critical value of abnormal sound speed is:
vi v c
10.4.2-6
vi v L
10.4.3
81
82
type
feature
All the acoustic parameters of all the test sections are normal, and
no sound speed is found below the lower limit.
The acoustic parameters of one or two test points of a certain
section are abnormal, but no sound speed is found below the lower
limit.
The acoustic parameters of many test points of a certain section is
abnormal are abnormal;
83
84
Strain Sensor
Size
Big
Relatively small
Creeping
Relatively
small,
fit
for
prolonged observation
Relatively
big,
Technique
needs
Making
to
be
enhanced
Measuring Sensiblility
Relatively low
Influence
When
of
Temperature Change
temperature
big
Relatively high
change
in
occurs,
Self-compensation is possible.
modification is necessitated.
Influence of a Long
Wire
modification
in
the
Self-compensation
Weak
Self-compensation of bending
or torsion
Requirement
on
Not so high
High
Weak
Good
Insulation
Dynamic Response
A.0.4 As for the installation place and number of sensors, operators should conform to the
following rules:
1. The sensors should be implanted at the boundary of two layers of different soils to test
the frictional resistance applied to the pile, which penetrates several layers of soils. A
cross-section for measurement should be found on or above the ground as the
standardized one. The distances between the cross-section and the pile top & the pile
end should be larger than one time the pile diameter.
2. to 4 sensors can be installed at the same cross-section. When the pile diameter is
comparative big or the test requires a larger one, take the larger value.
A.0.5 Strain sensor can be made through different fabricating methods according to the
following situations:
85
86
product.
A.0.6 Strain sensor can be made by means of full bridge or half bridge, but full bridge shall be
adopted firstly. The measuring slice and compensating slice of sensor shall be product
with same specification and batch number, and shall be stick exactly on same section of
reinforcement axially and laterally. Connection of measuring point shall adopt
screening cable, ground insulation resistance value of lead shall be above 500 M;
Before using, operator shall soak the whole cable coil (except both ends) into water for
one hour, so as to measure insulation of core and water; screened cable shall be
insulated from reinforcement; length and wire size of the connecting cables used for
measurement and compensation shall be the same.
A.0.7
Resistance strain gauge and its connecting cable shall be provided with reliable
anti-damp insulation measures; before normal test, system insulation resistance of
resistance strain gauge and cable shall not be lower than 200M.
A.0.8 While sticking resistance strain gauge with different material characters, operator shall
use different adhesion pastes. While choosing resistance strain gauge, adhesion paste
and lead, operator shall consider ambient conditions of testing pile in fabricating, curing
and construction process. For concrete prefabricated pile that adopts steam curing or
high pressure curing, operator shall choose resistance strain gauge, adhesion paste and
lead with high temperature resistance.
A.0.9 Resistance strain gauge used for measurement of resistance strain shall have a function
of multipoint automatic measurement, resolution of gauge shall be superior or equal to
1 , and shall have storage and printing function.
A.0.10 Wired re-bar stress meter shall be chosen according to diameter of main reinforcement.
measurable frequency scope of instrument shall be more than 1.2 times of frequency in
case of maximum loading of pile. Before using, operator shall demarcate re-bar stress
87
meter one by one, and obtain relation between pressuretensile forceand frequency.
A.0.11 Wired re-bar stress meter with connecting long pole can be welded on main
reinforcement; threaded connection shall not be adopted.
A.0.12 Wired re-bar stress meter shall be measured through the matching frequency gauge,
resolution of frequency gauge shall be superior or equal to 1Hz.
A.0.13 When displacement and measurement of shaft are conducted at the same time, shaft
internal force of and displacement test shall be conducted synchronously.
A.0.14 Testing data shall be cleared up according to the following regulations:
1. In case of strain sensor measurement, lead resistance of actually measured strain value
shall be corrected according to the following formula:
2r
(A.0.14-2)
R
(A.0.14-1)
r lead resistance ;
R resistance of strain gauge.
2. In case of wired sensor measurement, operator can convert measured frequency of
re-bar stress meter into force through calibration factor, and then calculate it into
reinforcement strain volume which is equal to concrete strain at the section of re-bar
stress meter.
3. During clearing up data, operator shall delete the measuring points with big null shift
and no change rule, and shall calculate out average strain value of effective
measuring point of same section, and calculate axis force of shaft at this section:
88
Qi = i Ei Ai
A.0.14-3
demarcated section;
q si =
Qi Qi +1
u li
A.0.14-4
qp =
Qn
A0
A.0.14-5
89
si = E s si
A.0.14-6
Falling rod shall include internal and external pipes, in which, the external pipe shall
be fixed on shaft, the lower end of internal pipe shall be fixed on the testing section,
top shall be higher than external pipe by 100-200 mm, and can displace with the
fixed section synchronously.
A.0.16
Falling rod shall have a certain rigidity; difference between outer diameter of the
falling rod and internal diameter of external pipe shall not be less than 10mm, joint at
falling rod
A.0.17
shall be smooth.
requirement of Clause 4.2.4 of this Code. Measuring and reading the data shall be
synchronous with displacement measurement of pile top.
A.0.18 If internal force testing sensor is embedded in shaft at the fixed section on bottom end
of falling rod, axis force Qi and displacement S i in shaft at this section.
90
Appendix B
B.0.1 For concrete pile, the breaking layer and weak concrete of pile toe shall be chiseled
firstly.
B.0.2 Pile toe surface shall be flat, axle wire of pile toe shall superpose with axle wire at the
upper of shaft.
B.0.3 Main reinforcement of pile toe shall be stretched to concrete protective layer of pile top,
each main reinforcement shall be on same height.
B.0.4 Within pile diameter scope which is one time from pile top, 3-5m thick steel plate shall
be used for enclosure or stirrup shall be set up within pile diameter scope 1.5 times
from pile top,
91
Appendix C
C.0.1
On-the-spot testing data of vertical compression resistance static load test of single
pile shall be recorded according to format specified in Form C.0.1
C.0.2
On-the-spot testing data of horizontal static load test of single pile shall be recorded
according to format specified in Form C.0.2.
Form C.0.1 Record Form for Vertical Compression Resistance Static Load Test of Single Pile
Tested by:
Load
(kN)
Measuring
Time
Job Name
Loading Oil
Pressure
Level
(Mpa)
Pile No.
Reading of Displacement
Gauge
dial test indicator
1#
2#
3#
4#
Verified by:
Date
Sedimentation
this grade
(mm)
Recorded by:
92
of
Accumulated
Sedimentation
(mm)
Remark
Form C.0.2
Job Name
Oil
Pressure
(Mpa)
Pile No.
Load
(KN)
Observing
Time
Number
of
Cycles
Date
Load
Verified by:
Recorded by:
93
Unload
Tested by:
Lower
gauge
Load
Upper
gauge
Outer
Corner
Remark
Appendix D
D.0.1 On-site operation records of core extraction test and sample itemization should be made
in the same format with that of Table D.0.1-1 and Table D.0.1-2; the comprehensive bar
chart should be made in the same format with that of Table D.0.1-3.
Pile No.
Time
From
From
To
Total
Hole
Project
No.
Name
Sample
Sample
Residual
Preliminary
No.
Length
Sample
Description and
(m)
Records of
Abnormality
Testing Date
Operator-in-Chief: Record:
94
Page:
Project
Name
Pile
No./Sample
Hole No.
Project
Date
Pile Diameter
Stratification
(or section)
Depth (m)
Pile Body
Concrete
Dregginess
at Pile End
Supporting
Course
Tested byUnit
Sample Description
Recorded by:
95
Sampling No
and
Sampling
Depth
Designed
Concrete
Strength
Remarks
(Kinetic
contact or
penetration
condition in
the case of
strong
weathering )
Tested by: (Operator)
Pile
No./Hole
No.
Length of
Project
Pile
Layer No.
Remarks:
Height
Mark
of
Layer
Bottom
(m)
Designed
Concrete
Strength
Designed
Pile
Diameter
Depth of
Layer
Bottom (m)
Height
Mark of Pile
Top
Hole Depth
Layer
Thickne
ss (m)
Bar Chart of
Concrete/So
il Sample
(Scale)
Formulated by:
stands for sample extraction place
Description
of Pile Body
Concrete and
Supporting
Course
Hole
Drilling
Time
Hole
Completio
n Time
Serial No.:
Sample
Strength
and Depth
(m)
Checked By:
96
Remarks:
resistance test must not be carried out. The same applies to the following cases if the
deviation of sample size exceeds the following values:
1. When the length of the core sample is smaller than 0.95d or larger than 1.05d (d stands
for the average diameter of the core sample).
2. When the deviation between any diameter along the length of the core sample and the
average diameter is larger than 2mm.
3. When the unevenness (within 100mm) of the end surfaces exceeds 0.1mm.
4. When the non-perpendicularity between the end surfaces and the axis exceeds 2
degrees.
5. When the average diameter of the core sample is smaller than double the apparent
maximum granular diameter of the coarse aggregate of the concrete.
98
99
least 2D. D stands for the diameter of the trial pile or peripheral width); in the case of a
large diameter pile, the distance between the sensors and the pile block may be smaller
but larger than 1D. The texture and the sectional size of the installation place should be
the same with the original pile. The sensor must not be installed around the mutation of
the section.
Article Two of F.0.2 requires that the acceleration sensors which are installed on the
sides must be at least 0.4 Hr (Hr stands for the height of the hammer) or 1D away from
the pile block. Take the large value.
F.0.3 Article One of F.0.1 requires that the sensors must be installed within the purview of the
following provisions:
1. The center of the stress sensor and the center of the acceleration sensor must be on the
same horizontal line. The horizontal distance between the two sensors (which are
installed on the same side) must be at most 80mm. After installation, the central axis of
the sensors must be parallel to the central axis of the pile.
2. The installation surface for various sensors must be even and firm. And the surface
must be parallel to the axis of the pile. The operator can also grind it flat with a grinder.
3. The boring hole for the bolt must be vertical to the side surface of the pile. The installed
sensor must adhere to the surface of the pile closely. When the hammer is working, the
sensor shall not slide away. When installing a stress sensor, its initial stress value must
be monitored. The initial stress value of the installed sensors must meet the following
measurable axial direction deformation allowance requirements when hammering:
1) The stress value of a concrete pile should be larger than +-1000
2) The stress value of a steel pile should be larger than 1500
F.0.4 Before monitoring by continuous hammering, the connecting cable of the sensors must
be fixed securely.
100
G.1.1 When a trial pile driving is necessitated, the pile type, pile length and supporting course
of the pile top must meet the requirement of the following rules:
1. The position for the trial pile driving must be representative of geological conditions.
2. All layers of soil must be tested during the trial pile driving. If the supporting course is
relatively thick, numerous tests must be carried out in the same lay of soil.
G.1.2 To locate the right supporting course of the pile top, operators must take into
consideration the relation between the bearing capacity and the penetration depth and
the survey report of the geological conditions.
G.1.3 When estimating the bearing capacity of the trial pile, keep to the following rules:
1. The value of the estimated bearing capacity should be equal to or lower than the
multiplication of the sum of pile side resistance and pile top resistance and the time
effect coefficient of the buried pile. And the multiplication value must be checked
repeatedly.
2. The resting time from re-driving and the initial driving must meet the requirement of
Table 3.2.6.
101
t =
1
2L
2L
2L 2 x
2 L 2 x
Z V t1 +
F t1 +
Z V t1 +
F t1 +
c
c
c
c
2A
G.2.3
In the formula,
t stands for maximum value of pile body hammering tension stress (kPa);
Xstands for distance from the installation site of the sensors to reckoning point. (m);
A stands for sectional area of the pile body (m2)
102
G2.4 Maximum compression stress of the pile body hammering can be calculated with the
following formular:
p =
Fmax
A
G.2.4
In the formula,
G.3
G.3.1 The energy transmitted from the hammer to the pile should be calculated with the
following formula:
te
E n = E V dt
G.3.1
In the formula,
E n stands for the energy transmitted from the hammer to the pile (kJ);
t e stands for sampling termination time.
G.3.2 The maximum kinetic energy should be defined by measuring the maximum movement
velocity.
G.3.3 The hammer transmission ratio should be defined by the energy transmitted from the
hammer to the pile and the rated hammer energy. The hammer efficiency must be
defined by the maximum hammer kinetic energy and the rated hammer energy.
103
Appendix H
H.0.1 The internal diameter of the sound ranging pipe should be 50-60mm.
H.0.2 The lower end of the pipe should be closed, the upper end should be covered and there
must be no blockage in the pipe. The joints of the pipe should be smooth, and the pipe
orifice should be more than 100mm above the pile top. The orifices of all the sound
ranging pipes should be of the same height.
H.0.3 The sound ranging pipe should be fixed in a proper way. Make sure that they are
parallel to each other.
H.0.4 The number of buried sound ranging pipes should meet the following requirements:
1. D<=800mm. Two pipes.
2. 800mm<=D<=2000mm. Not less than 3 pipes
3. D>=2000mm. Not less than 4 pipes.
In the formula, D stands for diameter of the tested pile.
H.0.5 The sound ranging pipes should be arranged along the outer surface of the pile
cross-section in a symmetrical pattern. Then number them in the clockwise order in
accordance with Figure
104