Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Jan Albrecht
Content
Outotec in a nutshell
06/12/13
89%
of the order
intake,
Environmental
Goods and
Services,
OECD
06/12/13
2010
2006
OUTOKUMPU TECHNOLOGY
2001
BOLIDEN CONTECH
NORDBERG GRINDING MILLS
KHD ALUMINIUM
AISCO, SUPAFLO
WENMEC
1990
1970
OUTOKUMPU
AUSMELT
LURGI
METALLURGIE
LAROX
1950
1900
06/12/13
ENERGY
PRODUCTS
OF IDAHO
"
"
"
"
"
Worlds largest
pellet plant
(7.5 million tpy)
Samarco; Brazil
"
"
Sales
EUR million
2200
2087
2000
1800
1600
"
"
06/12/13
1386
1218
1200
1000
1000
878
740
800
556
600
400
200
0
366
426
970
Basic engineering
Detail engineering
Supply of process and plant
equipment
Operability & maintainability
optimization
Spare parts
Plant construction
Equipment installation
Start-up and ramp-up services
Training
R&D services
Modeling & simulation
Testwork
Feasibility studies
September 2013
Decommissioning
Refurbishment of equipment
for re-use
Plant decommissioning
Permanent shutdown of the plant
Land reclamation
Plant operation
Spare parts
Preventive maintenance
Auditing
Testwork
Shutdown services
Equipment life assessment
Upgrades
Process optimization
Modernizations
Training
Environmental requirements
- lower emissions
Production requirements
- increased capacity
- reduction of OPEX
- changed feed stock (e.g. Changes in ore contents for metallurgical acid plants)
- additional products
(e.g. Oleum, SO3, liquid SO2, ultrapure acid, heat, electrical energy)
Reliability problems
- replacement of damaged equipment
- increased availability (less unplanned downtime, increased travel time)
- decoupling of connected operations
- operational aspects (training and responsiveness of staff)
06/12/13
Capacity-Increase
Identical Design
More Throughput
Add-on Tailgas
Scrubbing and / or add.
Catalyst Beds
Change of Gas-Source
e.g.: Pyrites Sulphur
Conversion to
Double Catalysis
06/12/13
Reduction of
Environmental Impact
Scheduling aspects
- targeted start and end date
- milestones and fixed periods/steps (e.g. staged revamp during shut downs)
Other aspects
- surrounding infrastructure and accessibility
- established supplier and contractor network, availability of sufficient cranage
10
06/12/13
Audits and
Inspections
Trouble shooting
Installation / Commissioning support
Training
Research & analysis
services
11
November
2013
Process upgrades
Equipment upgrades
Plant upgrades
Plant modernisations
Upgrade installation
and start-up services
Spare parts
Wear parts
OEM components
Component repair
service
Stock planning
consultation
Process evaluation
Process modifications
Equipment inspection in terms of
wear and consumption levels
Increasing capacity
Engineering services
Process engineering
Plant and mechanical engineering
Civil and steel structural engineering
Construction engineering
12
06/12/13
Collection of plant operating data (DCS) and plant documents with comparison to
design process data including analysis of deviations
Inspection of plant with client with identification of equipment status
Preliminary identification of bottlenecks and potential of the plant
13
06/12/13
14
06/12/13
Fact finding:
as a basis for project
identification
Clients
trigger
event
Evaluate options:
Project execution
Inspection or Audit
Feasibility study
Engineering...
Project implementation
15
06/12/13
16
06/12/13
17
06/12/13
Expert Services
q Training
q Remote Diagnostic Services
q Audits and Studies
q Shut down and operational
Support
q Refractory Services
q Spare Part Supply Services
18
06/12/13
Capacity
q LUREC
q Debottlenecking Capacity
Revamp
q LURO2TM Burner Revamp
q Wet ESP Revamp
Quality / Diversification
q Gas cleaning revamps:
q Wet ESP Revamp
q Mercury removal
q NOx removal
Environment / Safety
q Single to Double Absorption
Revamp
q PERACIDOX
q LUREC
q Wet ESP Revamp
Energy Efficiency
q HEROS
q LUREC
CORDTM Heat
exchanger
Vertical wire
mesh
SX Solutions
HEROSTM
Heat recovery
PORS
Sulphur
Melter
PORS
OK
PORS
ALARM
19
06/12/13
20
06/12/13
2011
06/12/13
22
4 bed-converter (prefabricated)
One internal heat exchanger
Material of construction: 304H
Outside diameter: 11,2 m
06/12/13
23
06/12/13
24
06/12/13
06/12/13
Installation of prefabricated
new drying tower
including brick lining
Installation of prefabricated
new converter
06/12/13
27
06/12/13
28
06/12/13
420 C
635 C
Drying
Tower
Final
Absorber
29
06/12/13
445 C
550 C
435 C
489 C
410 C
Inter
Absorber
460 C
410 C
412 C
18 vol.-% SO2
13 vol.-% O2
141.000 Nm/h
17,6 %-vol. SO2
O2/SO2: 0,8
205.000 Nm/h
12 %-vol. SO2
O2/SO2: 1.3
125.000 Nm/h
12 %-vol. SO2
O2/SO2: 1.1
30
06/12/13
119,000 Nm/h
8,8 %-vol. SO2
O2/SO2: 1,3
102.300 Nm/h
1611 tpd
c_SO2: 160 ppm
108.000 Nm/h
2688 tpd
c_SO2: <100ppm
plant equipment
(lower gas flow, lower SO2-content,
favourable O2/SO2-ratio,
less thermal cycles)
Minimised interactions to the
operation of the existing plant
High flexibility to fluctuations
in the SO2-content
No interference during
construction with the operating
of the existing plant
31
06/12/13
Quench
32
06/12/13
Conturi
Cooling
Tower
Wet ESP
to
Acid
Plant
(virtually stoichiometric)
High reliability
Low investment cost
High flexibility with respect to
various SO2 contents of the gas
33
06/12/13
atmosphere
HP STEAM GENERATION
High Level
Heat Recovery
sulfur
combustion
furnace
air
waste heat
boiler
drying tower
superheater
evaporator
34
06/12/13
economizer
converter
intermediate
heat
exchanger
Low Level
Heat Recovery
stack
product acid
intermediate
absorption
tower
final
absorption
tower
35
06/12/13
06/12/13
06/12/13
References:
Evonik Marl (IAT)
Kayalekera
38
06/12/13
Noracid
Pequiven
Ravensdown (FAT)
Cajamarquilla (IAT)
Aventis
(Hchst AG)
Frankfurt / Germany
Exchange of a converter
during a shut-down period
of 17 days:
The picture shows the installation
of the completely prefabricated
new converter inclusive insulation!
39
06/12/13
"
Worms / Germany
40
06/12/13
"
"
"
"
06/12/13
Sustainable use
of Earth's
natural resources.
42
06/12/13