Está en la página 1de 11

Achieve Data Sheet Unit # 5 --2013-2014

Sr. No.

Objectives

Achiev

Target

Maximise Plant Load Factor as


per MERC

> 70.89 %

Operating GUHR

2686.42
KCAL/KWH

Reduction in Auxiliary Power


Consumption

< 9.09 %

Maximise Generation

> 3105.17 Mus

Loss of Generation due to O&M


problems

< 10 %

Forced Outage factor

< 3.0 %

Station (Unit) Availability

> 80.56%

Total number of tripping

<6

Total number of tripping due to


BTL

<2

Monthly
Progressive
Monthly
Progressive
Monthly
Progressive
Monthly
Progressive
Monthly
Progressive
Monthly
Progressive
Monthly
Progressive
Monthly
Progressive
Monthly
Progressive

Apr
65.79
65.79
11.58
11.58
8.02
8.02
236.843
236.843
26.40
26.40
21.54
21.54
78.46
78.46
2
2
2
2

May
84.24
75.17
-37.42
-16.33
7.06
7.47
313.368
550.211
5.40
15.90
0.00
10.77
100.00
89.23
0.00
2
0
2

June
53.01
67.86
78.58
8.11
10.46
8.24
190.819
741.030
17.60
16.47
0.00
7.18
89.83
89.43
1.00
3.00
1
3

July
18.27
55.26
33.58
10.25
15.55
8.86
67.968
808.998
14.23
15.91
0.00
5.39
77.45
86.44
0.00
3.00
0.00
3

Aug
0.00
44.06
Err:512
10.25
Err:512
8.99
0.000
808.998
100.00
32.73
100.00
24.31
0.00
69.15
0.00
3.00
0.00
3.00

-2014
Achievements
Sept
Oct
0.00
0.00
36.84
31.50
Err:512
Err:512
10.25
10.25
Err:512
Err:512
9.25
9.51
0.000
0.000
808.998
808.998
100.00
100.00
43.94
51.95
100.00
100.00
36.92
100.00
0.00
0.00
57.62
49.39
0.00
0.00
3.00
3.00
0.00
0.00
3.00
3.00

Nov
0.00
27.63
Err:512
10.25
Err:512
10.02
0.000
808.998
100.00
57.95
100.00
100.00
0.00
43.22
0.00
3.00
0.00
3.00

Dec
0.00
24.52
Err:512
10.25
Err:512
10.53
0.000
808.998
100.00
67.15
100.00
0.00
0.00
33.41
0.00
3.00
0.00
3.00

Jan
0.00
22.03
Err:512
10.25
Err:512
10.73
0.000
808.998
100.00
78.98
100.00
100.00
0.00
20.91
0.00
3.00
0.00
3.00

Feb
23.09
22.12
2800.00
19.29
13.34
10.96
77.592
886.590
70.80
85.63
6.23
53.12
32.57
13.75
2.00
5.00
1.00
4.00

Mar
76.28
26.72
-2800.00
-636.76
6.17
9.80
283.777
1170.367
0.00
83.85
8.29
7.26
91.71
15.54
0.00
5.00
0.00
4.00

Achieve Data Sheet Unit # 5 --2012-2013


Sr. No.
Objectives
Target
Maximise Plant Load Factor
1 as per MERC
> 75.24 %

Monthly
Progressive
Monthly
Progressive

2 Operating GUHR

2684 KCAL/KWH

Reduction in Auxiliary
3 Power Consumption

< 8.71 %

4 Maximise Generation

> 3295.39 Mus

Loss of Generation due to


5 O&M problems

< 6.50 %

6 Forced Outage factor

< 3.03 %

7 Station (Unit) Availability

> 88.78%

Monthly
Progressive

8 Total number of tripping

<6

Monthly
Progressive

Total number of tripping


9 due to BTL

<2

Monthly
Progressive

Monthly
Progressive
Monthly
Progressive
Monthly
Progressive
Monthly
Progressive

Achievements
Apr
May

June

July

Aug

Sept

Oct

Nov

83.64444 89.76747 67.76944 66.40054 59.00806 51.71944 54.85188 79.49861


83.64444 86.75615 80.49679 76.91496 73.28676 69.75114 67.59283 69.05666
-67
-26
13
198
68
-96
-134
44
-67 -80.67174 -80.4853 -36.94505 -0.574158 10.43558 4.036441 3.465115
8.449455 7.973408 9.684387 10.36626 11.67833 12.67877 9.379218 7.354356
8.449455 8.199132 8.611359 8.996319 9.433858 9.828293 9.775502 9.432808
301.12 333.935
243.97
247.01
219.51
186.19 204.049 286.195
301.12 635.055 879.025 1126.035 1345.545 1531.735 1735.784 2021.979
11.2
11.2
7.08
7.08

4.85
17.1
8.025
11.05
0
10.49
3.54 5.856667

8.7
10.4625
3.14
5.1775

10.4
7.1
24
2.2
10.45 9.891667 11.90714 10.69375
4.05
0.78
19.87
0
4.952 4.256667 6.487143 5.67625

92.92
92.92

100
89.51
96.46 94.14333

96.86
94.8225

95.95
99.22
80.13
100
95.048 95.74333 93.51286 94.32375

1
1

0
1

3
4

1
5

1
6

1
7

2
9

0
9

1
1

0
1

1
2

1
3

0
3

0
3

1
4

0
4

Dec

Jan

Feb

Mar

83.51075 81.4422 81.1375 80.71048


70.68603 71.77571 72.56053 73.25272
106
-48
-4
-19
17.12067 21.81979 24.83641 25.78751
7.242001 7.89583 7.735693 8.932831
9.141037
8.9979 8.879578 8.884561
310.66 302.965 272.622 300.243
2332.639 2635.604 2908.226 3208.469
0.2
9.31875
0
4.79125

0.1
8.725
0
4.79125

6.1
7.35
0
3.48

6.2
7.0375
0
3.0875

100
100
95.20875 95.20875

100
96.52

100
96.9125

0
9

0
9

0
9

0
9

0
4

0
4

0
4

0
4

Achieve Data Sheet Unit # 5 --2013-2014


First Qtr April 13 to
Sept 2014
Sr. No.

Objectives

Maximise Plant Load


Factor as per MERC

Target
Actual
70.89

i.51.85

Operating GUHR

ii.89.22
2686.42 KCAL/KWH

44.06
2696.67

Reduction in Auxiliary
Power Consumption

Maximise Generation

< 9.09 %

9.25
> 3105.17 Mus
I 1180
ii 1921.195
808.998

Loss of Generation due


to O&M problems

< 6.50 %

Forced Outage factor

< 3.03 %

43.94

36.92

Station (Unit) Availability

> 88.78%
57.62

Total number of tripping

<6
3

Total number of tripping


due to BTL

<2
3

10

Specific Oil Consumption

<2 ml/kwh

11

Specific DM consumption

71.82

1.14

123.55

12

Specific Soft water


Consumption

2374.44

3098.26

# 5 --2013-2014
Second Qtr Oct13 to
Mar 2014

Target achieved unto 44.06%, Due poor coal quality, Poor


vaccum,wet coal problem in rainy season. , CHP problem, Also
Unit wirhdrawn on 13th july for annual O/H but not sychonised
on target date 14/08/2013 due to condenser tube failure

26.72

Target Achieved 99%

2698.27

Target Achieved

10.05

Target achieved upto 89% due to TDBFP 5B on partial load ,


Also during low load opeartion in rainy season MDBFP kept in
service.

Target achieved upto 44.06%, Due poor coal quality, Poor


vaccum,wet coal problem in rainy season. , CHP problem, Also
Unit wirhdrawn on 13th july for annual O/H but not sychonised
on target date 14/08/2013 due to condenser tube failure
Target not achieved Unit wirhdrawn on 13th july for annual
O/H but not sychonised on target date 14/08/2013 due to
condenser tube failure

861.369

88.35
53.01

Target not achieved . Unit wirhdrawn on 13th july for annual


O/H but not sychonised on target date 14/08/2013 due to
condenser tube failure
Target not achieved . Unit wirhdrawn on 13th july for annual
O/H but not sychonised on target date 14/08/2013 due to
condenser tube failure

39.17

Target Achieved

Target Achieved Due poor coal quality, Wet coal problem in


rainy season.

100% Target Achieved

2.04

Target not achieved due to S/H drain, Master Drain , PRDS


drain valve passing, Also MS strainer Leakages. Also excess
DM consumed during condenser tube leakages checking work.

136.9

Target not achieved due to soft water leakges on line from


WTP to AHP Pump House.

2965.51

Unit was under prolonged O/H


from 13 July upto 18th feb
2014 for condenser tube
replacement work. As during
unit O/H condenser tube
found leakges which was not
arrested after tube plugging
and other all possible means

Unit was under prolonged O/H


from 13 July upto 18th feb
2014 for condenser tube
replacement work. As during
unit O/H condenser tube
found leakges which was not
arrested after tube plugging
and other all possible means