Está en la página 1de 100

TITAN CB34

COMMERCIAL BIN
30 ROOF
ERECTION MANUAL
09-02-09

347865 - MANUAL CHIEF42 CB34 TITAN 30< ROOF

INDEX
Section 1 Grain Bin Specifications
Section 2 Bin Erection
Section 3 #34 Bin Roof
A.
B.
C.
D.
E.

Part Identification
Pre-Assembly
Roof Assembly
Roof Panel Assembly
Cap Flashing

Section 4 Typical Roof Accessories


A.
B.
C.
D.
E.

Top Lid
Manhole Lid
Working Ring
Roof Ladders
Roof Vents

Section 5 Temperature Cable Supports Installation


A. General Consideration
B. Temperature Cable Supports

Section 6 Sidewall and Stiffener Gauge Chart


Section 7 Sidewall Erection
A.
B.
C.
D.
E.
F.
G.

Sidewall Sheets and Stiffeners


Laminated Sheet Installation
Base Angle Detail
Titan One Ring Door
Bin Stiffener Anchor
Transition Stiffeners
Stiffener Upgrades for Goal Posts

Section 8 Wind Rings


Section 9 Miscellaneous
A. Maintenance Instructions
B. Comment Sheet

Page 1

MANUAL CHIEF42 CB34 TITAN

Manual Revisions
Date:
10-12-05
10-19-05
10-25-05
10-25-05
10-26-05
11-11-05
01-16-06
01-25-06
02-17-06
03-28-06
03-28-06
03-29-06
09-20-06
10-25-06
11-06-06
02-06-07
03-13-07
03-22-07
05-07-07
02-28-08
05-13-08
06-13-08
07-18-08
08-28-08
09-15-08
11-21-08
12-09-08
04-07-09
04-10-09
07-17-09
09-02-09

Revision Made
Dimension for blocking needed to compress stiffeners added
Changed that all rafters must be attached to a 2 ring top stiffener
Changed temperature cable bracket installation
Changed roof ring connector
Changed door installation instructions
Changed 3 Stiffened Bins have Roof Ring brackets at every stiffener
Changed to show holes added on horizontal seam of sidewall sheets between
stiffener holes
Updated gauge charts Removed all 20ga stiffeners
Changed peak heights 2 higher
Added Rafter Reinforcing Plates
Updated Temperature Cable Installation
Changed Rafters D & E Updated Manual
Changed Standoff to 2 parts Updated Manual
Updated Roof Weights
Changed Bins 25 rings and taller to show additional holes in roof panel ribs.
Changed Working Ring Brackets.
Changed Door
Added Section for Goal Post Upgrades
Added Additional Rafter Reinforcing Plate
Changed Wind Ring Couplers
Changed Anchor Bolt Radius and Chords
Changed Roof Rings to be Bolted to Eave Brackets
Added Rafter Splice Plates
Changed Roof Ladder to bolt together ladder
Changed to Seismic A
Changed Peak Ring Flashing
Changed top 2 ring stiffeners from 18ga to 16ga
Added wind ring placement for Baby Bubba Sidedraw systems.
Changed Temperature Cable Attachments
Changed Sidewall Gauges
Changed Sidewall Sheet Caulking Detail

MANUAL CHIEF42 CB34 TITAN

Page 2

Page 3

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 4

Page 5

MANUAL CHIEF42 CB34 TITAN

Section 1 Grain Bin Specifications

MANUAL CHIEF42 CB34 TITAN

Page 6

Page 7

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 8

Page 9

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 10

Page 11

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 12

Page 13

MANUAL CHIEF42 CB34 TITAN

Section 2 Bin Erection


Chief Industries, Inc. will not assume any responsibility for parts damaged due to faulty or
improper erection procedures.
Chief Industries, Inc. recommends that Bin Jacks be used for all bins taller than 8 rings
and all bins larger than 30 in diameter.
WARNING:
The allowable lifting capacity of the BIN JACKS must never be exceeded. Always check Bin
weight to insure a safe and trouble free erection.

Grain Bin Color Codes


Chief Grain Bins are color coded based on bin diameter. Components such as Roof Rafters,
Wind Rings, and Base Angle will be marked with the following Color Codes to help identify
them.
Bin Size
Color Code
Bin Size
Color Code
#12
Yellow/Black
#22
Blue
#13
Green/Black
#24
Brown
#14
Orange/Black
#26
Yellow
#16
Red
#30
Green
#18
Black
#34
Orange
#20
Pink

A. Suggested Erection Equipment


Impact Wrench & Sockets
Vise Grips
Level
Ladders

Wrenches
Alignment Punches
Drill and Drill Bits
Bin Jacks

Crescent Wrench
Rubber Mallet
Extension Cords
Screw Gun

7/16 bin bolts use 5/8 on the head of the bolt and 11/16 on the nut.
5/16 bin bolts use 1/2 on the head of the bolt and nut.
1/2 bolts in the roof structure use 3/4 on the head of the bolt and nut.
Bolt Buckets are Color Coded with a Dot as Shown Below.
Bolt Size
5/16
7/16
1/2
5/8

Color Code
Blue
Red
Green
Yellow

MANUAL CHIEF42 CB34 TITAN

Page 14

B. Checking Shipment
Check your shipment at the time of pickup and delivery against the packing list furnished
with the shipment. If a shortage exists or if any damaged material is evident, note such
shortage or damage on the freight bill before you sign for the shipment.
Claims of shortages will not be honored after thirty days from receipt of shipment.
Parts that are short or damaged are the responsibility of the delivering carrier, not the
manufacturer or dealer.
It is advisable to reorder damaged or missing parts immediately so that there will be no
delay in erecting the bin. After receiving the invoice for the reordered material, file a
claim with the delivering carrier at once.
The galvanized panels leave our plant in prime condition; store off the floor in a heated
room if possible. If stored outside, place panels down, off the ground. Upon arrival of
shipment if you are not certain whether or not moisture is present, store panels on edge or
on end allowing 1/4 air space between panels until dry. Exposure to trapped moisture
can cause white rust, which will void the warranty.

C. Stop and Study


Before beginning erection of the bin, take the time to thoroughly study the construction
methods in this manual. It will save you both time and money.
Important:
The peak load capacities listed under Auxiliary Roof Loads must not be exceeded. If your
application will exceed the listed values, contact Chief Industries for recommendations.
Chief Industries makes no warranty concerning parts, accessories or equipment not
manufactured by Chief Industries.

D. Site Selection
Choose a site that has good drainage away from the bin so that water will not stand around
the bin. The soil should be firm and preferably without fill. If fill is required, water and
compact the fill material to avoid uneven settlement. A field investigation of the soil
bearing conditions is recommended especially for larger grain bins where the foundation
loads and floor pressure become large. A licensed engineering firm should be employed to
take soil borings, determine the maximum allowable soil pressure and design the bin
foundations and floor slab accordingly.

Page 15

MANUAL CHIEF42 CB34 TITAN

E. Bin Jack Erection


Position the structure you provided to hold the Inner Ring at its approximate height,
centering the Inner Ring on the center of the Bin.
Use at least one Bin Jack per Sidewall Sheet. (For example, on the #18 Bin, use 18 Bin
Jacks, etc.)
The application of one bin jack per sidewall sheet will minimize sidewall distortion during
erection. Failure to use the proper quantity of jacks may result in inward-outward lay of the bin
sidewall or even permanent distortion of the bin sidewall sheets.
The recommendation of at least one Bin Jack per sidewall sheet is based on keeping the bin
round, refer to the warning below, and make sure the lifting capacity of the jack is
sufficient for the weight of the bin. Note that all jacks may not shift equally, Therefore
make sure the lifting capacity rating by the jack manufacturing is met.

WARNING:
If it is necessary to leave the construction site for any length of time before the Bin is
completed and anchored to the concrete, the Bin must be securely tied down.

MANUAL CHIEF42 CB34 TITAN

Page 16

F. Assembling Sidewall Sheets


All bolts are washer head bolts with sealing washers S.A.E. Grade 8, with whiz flange
nuts. Grade 8 bolts are marked with six radial lines on the bolt head as shown. If these
descriptions do not correspond with the bolts shipped with the bin, please contact the
customer service department immediately. Do not substitute any other Bolts.

Bin bolts must be TIGHT. The following table contains recommended minimum and
maximum torque values.
BOLT DIA.
(INCHES)
5/16"
7/16"

TORQUE
MINIMUM
22
60

FT. LBS
MAXIMUM
28
75

Tighten the bin bolts from the inside of the bin (nut end of the bolt) to eliminate spin
off of the sealing washer.
USE ONLY THOSE BOLTS SUPPLIED BY CHIEF INDUSTRIES.
THE SUBSTITUTION OF BOLTS FROM OTHER SOURCES IS NOT PERMITTED.

NOTE: Proper bolting sequence MUST be followed at all times.

Page 17

MANUAL CHIEF42 CB34 TITAN

The Titan Sign Sheet must be installed in the second ring as shown in figures below.

(Shown installed on a 2 stiffened bin)

(Shown installed on a 3 stiffened bin)


Install the Titan Sign Sheet by field drilling (6) six holes in the Titan Sign Sheet and
stiffeners as shown above. Bolt the Titan Sign Sheet to the stiffeners with (6) six 7/16 bolts.

MANUAL CHIEF42 CB34 TITAN

Page 18

Assembling top ring


Locate the proper gauge of sidewall sheets needed for the top ring from the gauge chart. Lap and
caulk sheets as shown below. Locate top stiffeners and install on top ring.
Note: Top Sheets have special punching on the top of the sheet at the stiffener holes for the
rafter to attach to. Leave bolts out of top (4) stiffener holes until eave brackets are
attached.

Wipe off the outside ends of all the Sidewall Sheets to remove excess oil so that the Strip
Caulking will adhere to the metal. Place the Strip Caulking as near to the vertical inside edge of
sheet at every vertical seam.
On Bins 12 gauge or heavier a horizontal strip of caulking is needed on the inside at the center
bottom of the Sidewall sheet located on the hill near to the bottom holes. This strip of caulking
should fit where the endlap of the next ring Sidewall Sheets bolts up to this location.

Page 19

MANUAL CHIEF42 CB34 TITAN

G. Roof Panel Location


The rafters need to be bolted directly behind a top 2 ring stiffener, the roof panel rib will line up
directly above the rafter from the peak to the eave. (There is 1 Rafter and 4 roof panels per
sidewall sheet.)

MANUAL CHIEF42 CB34 TITAN

Page 20

H. Crane and Jack Capacities


Crane Capacity:
The total roof dead load for each of the respective bin roof sizes is shown in the table below.
This weight includes the roof panels and all structural members (roof beams, compression rings,
bolts, ect.)
When determining the crane capacity necessary to erect the roof structure, the booming distance
must be considered. If the cane sizes available will not lift the roof structure (using one crane),
two cranes may be used, utilizing a spreader bar. The spreader bar must be adequately designed
to carry the entire roof dead weight.

Peak Heights
All peak heights listed below are to the bottom of the peak ring from the ground with (2) Titan
sidewall sheet rings installed. Deduct 42 1/2 from the peak heights when only one ring of
sidewall sheets are installed.
Model
CB18
CB20
CB22
CB24
CB26
CB30
CB34

Peak Height
20 - 8 7/8
22 6 5/16
24 3 3/4
26 1 1/8
27 10 9/16
31 5 7/16
35 0 5/16

WARNING!! OVERLOADING CRANE CAPCITY CAN RESULT IN


SUBSTANCIAL PROPERTY DAMAGE OR SEVERE PERSONAL INJURY.
ALWAYS CHECK CRANE CAPACITY PRIOR TO LIFTING ROOF
STRUCUTRE

Page 21

MANUAL CHIEF42 CB34 TITAN

Single Rafter
2 Rafter
3 Rafters
Total Roof w/o Roof Panels
Total Roof w/ Roof Panels

#34
660
1,450
2,300
31,250
50,000

MANUAL CHIEF42 CB34 TITAN

#30
550
1,200
1,825
23,650
38,400

Weight in Pounds (lbs.)


#26
#24
#22
400
300
250
850
700
600
1,350
1,075
950
15,350
11,925
9,900
26,600
21,000
17,500

#20
230
550
850
8,525
15,000

Page 22

#18
200
450
675
5,750
11,000

Section 3 - #34 Bin Roof


A. Part Identification

Page 23

MANUAL CHIEF42 CB34 TITAN

B. Pre-Assembly
After the top two rings of the bin are built and stiffeners are added, brackets need attached to the
sidewall and rafters, pre-assemble these brackets on the ground before raising the roof will speed
up erection time.
Top Angle
Attach top angle to inside of top ring as shown with 5/16 x 3/4 Bin Bolts.

Note: there is (1) piece of top angle per top sidewall sheet. Ex: CB34 = 34 top angle

MANUAL CHIEF42 CB34 TITAN

Page 24

Roof Ring Bracket


Attach roof ring brackets to inside of top sidewall sheet behind 1 ring top stiffeners with (4)
7/16 x 1-1/2 bin bolts. (Place bolts with heads on inside of bin.)

Page 25

MANUAL CHIEF42 CB34 TITAN

C. Roof Assembly
Pre-assemble rafter sections together as shown on flat surface. Rafter to rafter connections
should be tightened before raising rafters into place. Raise the peak ring to the correct height as
shown and begin attaching rafter to the peak ring and eave brackets with 1/2 x 1-1/2 bolt with
washers on the brackets. Attach 4 sets of rafters equally spaced around the bin and check to
insure peak ring is level, and then install all other beams. Leave all ring segment and strut bolts
loose in the structure until all rafters and ring segments and struts are installed.
Refer to the drawing below for sequence of beams.

Refer to the part identification page at the beginning of this section to determine proper rafters.

All rafter to rafter connections are 1/2 x 1-1/2 bolts.

MANUAL CHIEF42 CB34 TITAN

Page 26

Rafter Clips
Attach the long clips to every rafter as shown for ring segments; using 1/2 x 1-1/2 bolts.

Page 27

MANUAL CHIEF42 CB34 TITAN

Rafter Reinforcing Plates


Bolt reinforcing plates to rafters as shown with 1/2 x 1-1/2 bolts.

MANUAL CHIEF42 CB34 TITAN

Page 28

Detail at Peak

Page 29

MANUAL CHIEF42 CB34 TITAN

Detail at Eave

MANUAL CHIEF42 CB34 TITAN

Page 30

Cross Members
After all rafters are installed, begin installing cross members to the long clips that are bolted to
the rafters as shown. Install cross members with 1/2 x 1-1/2 bolts with washers against the
cross members.

Page 31

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 32

Roof Struts
Attach upper Roof Strut with 1/2 x 1-1/2 bolts between center set of holes on Rafters E as
shown. An Upper Roof Strut is placed between every rafter as shown below.

Attach Middle Roof Strut with 1/2 x 1-1/2 bolts to back side of upper ring segment and center
set of holes on Rafters D and E as shown. A Upper Roof Strut is placed on every upper ring
segment as shown below.

Page 33

MANUAL CHIEF42 CB34 TITAN

Attach Lower Roof Strut with 1/2 x 1-1/2 bolts to inside of lower ring segment and center set
of holes on Rafters D and C as shown. A lower roof strut is placed on every lower ring
segment as shown below.

MANUAL CHIEF42 CB34 TITAN

Page 34

Eave Brackets
Attach Left Hand and Right Hand Eave Brackets to the inside of the top sidewall sheet behind
the 2 ring top stiffener, with 7/16 x 1-1/2 bin bolts with bolt head inside the bin, as shown.
(Note: one L.H. and one R.H. Eave Bracket per sidewall sheet equally spaced around the bin)

Page 35

MANUAL CHIEF42 CB34 TITAN

Roof Ring
After all the structure is assembled, attach roof rings to eave brackets between every rafter.
Attach roof rings loosely to rafter clips with x 2 bolts, add shims between plates on roof ring
and eave brackets as needed, so roof rings are tight against rafters all around bin. When
tightening roof rings to rafters, check that rafters are being held straight. Add additional shims as
needed to keep rafters straight.

MANUAL CHIEF42 CB34 TITAN

Page 36

D. Roof Panel Assembly


Lower Roof Panel Assembly
Install bottom standoff angle centered on top side of ring segment as shown. Place row or strip
caulking on standoff angle where the lower roof sheets will be attached. Use 5/16 x 1-1/4 bin
bolts (heads on outside of bin) to attach upper end of lower sheets to bottom standoff angle and
ring segment. Align roof sheet so that rib is inline with rafter. Bolt wide end of lower roof panel
to top angle

Page 37

MANUAL CHIEF42 CB34 TITAN

Always working to the right around the bin, place strip caulking on right rib of the previously
installed roof panel (top only). Placing roof panel in a vertical position, lock the left rib of the
panel being installed over the right rib of the previously installed panel. Tip the roof panel down.
As each roof panel is set into place, insert a lining punch through the hole in the rib at the bottom
of each roof panel. Temporarily clamp the two roof panels together with vise grips so that the
punch can be removed and a 5/16 x 3/4 bolt inserted and hand tightened. Continued
installation of roof panels as described in preceding steps.

All bins are equipped with one manhole and a roof ladder as standard. Extra manholes should be
spaced evenly around the bin.
When the last roof panel is placed, it will have to be interlocked by using a rubber mallet.
Starting at the top and working down, tap the vertical rib until it is sealed to the other panel.
Align roof panel holes and insert 5/16 x 3/4 bolts in the same manner as previously described.

MANUAL CHIEF42 CB34 TITAN

Page 38

Upper Roof Panel Installation


Attach flashing clips to peak ring with 7/16 x 1-1/4 bin bolts. Place plastic foam around peak
ring under flashing clips.

Page 39

MANUAL CHIEF42 CB34 TITAN

Roof Panel flashing extensions


The extensions come in 4 equal pieces install clockwise around the peak and attach with 7/16 x
1-1/4 bin bolts. (Note: Flashing Extensions must be started as shown to properly align roof
panels, Center first extension on hole that is aligned with rafter and flashing hole in peak ring.

MANUAL CHIEF42 CB34 TITAN

Page 40

Place Foam on edge of extension to seal between extensions.

Page 41

MANUAL CHIEF42 CB34 TITAN

Roof Panel Installation


1. Install strip caulking between top end of roof panels and roof panel flashing. Use 5/16 x
3/4 bolts at top end of panel. Bolt roof panels standoff ring with 5/16 x 1-1/4 bin bolts.
Align upper roof panel so the rib is inline with the rafter.

MANUAL CHIEF42 CB34 TITAN

Page 42

Install top standoff angle to inside of bottom standoff angle and attach angles together with 5/16
x bin bolts as shown. Place strip caulking on top side of top standoff angle where upper
sheets will to attached to top standoff angle.

Place strip caulking around standoff splice and install to inside of top and bottom standoff angles
as shown. Attach to standoff with 5/16 x bin bolts.

Page 43

MANUAL CHIEF42 CB34 TITAN

Proceed by installing additional roof panels in the following manner: Always working to the
right around the bin, place strip caulking on right rib of the previously installed roof panel
(top only). Placing roof panel in a vertical position, lock the left rib of the panel being
installed over the right rib of the previously installed panel. Tip the roof panel down. As each
roof panel is set into place, insert a lining punch through the hole in the rib at the bottom of
each roof panel. Temporarily clamp the two roof panels together with vise grips so that the
punch can be removed and a 5/16 x 3/4 bolt inserted and hand tightened. Continued
installation of roof panels as described in preceding steps.
When the last roof panel is placed, it will have to be interlocked by using a rubber mallet.
Starting at the top and working down, tap the vertical rib until it is sealed to the other panel.
Align roof panel holes and insert 5/16 x 3/4 bolts in the same manner as previously
described.

MANUAL CHIEF42 CB34 TITAN

Page 44

Special Note:
Bins 25 rings and taller will have roof panels with additional holes in the roof sheet ribs. Field
drill hole in ribs using pre-punched hole on adjacent rib as template, Attached roof panels ribs
together with 5/16 x 3/4 bin bolts and washer as shown.

Roof Panels installation for bins 25 rings and taller

Page 45

MANUAL CHIEF42 CB34 TITAN

Attach the roof panels to the roof joist using two #12 x 1 self-drilling screws per panel as
shown. Do this to both the upper and lower roof panels.

MANUAL CHIEF42 CB34 TITAN

Page 46

E. Cap Flashing
The cap flashing comes in 8 equal pieces; install the cap flashing to the peak ring with the 7/16
x 1 bin bolts. After cap flashing pieces are attached to the peak ring drill screw cap flashing
together where it overlaps with #12 x 1-1/4 self-drilling screws.

Page 47

MANUAL CHIEF42 CB34 TITAN

Section 4 Typical Roof Accessories


A. Top Lid
(1) Apply strip caulking around the top of the peak ring.
(2) Install top lid using twenty 7/16 x 1 bolts (bolt heads on top). Securely tighten bolts.

B. Manhole Lid
(1) Install manhole lid as shown below. Note that manhole hinge should be installed toward
top of bin.

MANUAL CHIEF42 CB34 TITAN

Page 48

NOTE: Leaf to lid and hinge to roof panel bolts are to be installed with heads inside.

Page 49

MANUAL CHIEF42 CB34 TITAN

C. Working Ring
Field locate and Install the working ring to the roof panels as shown, with 5/16 x 3/4 Bin bolts.
The working ring clips are to be evenly spaces around the ring. Connect the working ring
segments together with the connectors as shown below. Expand the connector as needed.

MANUAL CHIEF42 CB34 TITAN

Page 50

D. Roof Ladder
The roof ladder should be located adjacent to the manhole and next to a roof beam.

Roof Ladder are shipped broke down, and need assembled on the roof panels.
Refer to Chart for rails needed for roof size.

CB12
CB13
CB14
CB16
CB18
CB20
CB22 UPR
CB22 LWR
CB24 UPR
CB24 LWR
CB26 UPR
CB26 LWR
CB30 UPR
CB30 LWR
CB34 UPR
CB34 LWR

Page 51

4.5' RAIL

6' RAIL

2
2

7.5' RAIL

2
2
2
2
2
4

4
2

2
2

4
2
2

9' RAIL
4
2
2
4
6
2

4
2
2
4
4
6
2

MANUAL CHIEF42 CB34 TITAN

Attached rails to roof panels by field drilling holes into roof panels and bolt rails to panels with
5/16 x bin bolt. Attached rungs to rails with 5/16 x bin bolts.

MANUAL CHIEF42 CB34 TITAN

Page 52

Overlap rails as shown and attach together with 5/16 x bin bolts.

Page 53

MANUAL CHIEF42 CB34 TITAN

E. Roof Vents
A. Goose Neck Vent Installation
1. Refer to the bulletin that comes with the vent for installation procedures
2. Locate Goose Neck Vent on the desired roof sheet. Typically slide Goose Neck Vent up the
roof sheet (Toward the small end) until the corners of the base intersect the roof sheet ribs.
3. Using the base as a template, mark and drill the 11/32 diameter mounting holes.
4. Apply (2) two beads of butyl sealant or mastic sealant as shown, between the Goose Neck
Vent base and roof sheet. Leave a 1 gap at the lower side of the outside bead.

5. Assemble Goose Neck Vent to roof sheet using 5/16 x 3/4 hex bin bolts and nuts. Tighten
all bolts and check sealant along upper end of Goose Neck vent base for any gaps or pockets.
Apply extra sealant as required.
6. Peen up edge on inside of Goose Neck Vent to make a water tight seal. The lip should be
approximately 1 all the way around.

7. Do Not Weld Goose neck vent to roof as rusting will result.

MANUAL CHIEF42 CB34 TITAN

Page 54

B. Low Profile Roof Vents


1. Install the Screen and clips on the roof vent body using 5/16 x 3/4 bin bolts, nuts and flat
washers as shown below. The bolt heads should be on the outside of the vent with the
washers and nuts on the inside (against the screen).

2. Locate the roof vent assembly on the roof panel (over the manhole) by aligning the holes in
the clips with the corresponding holes in the lower end of the roof panel.
3. Mark the outline of the roof vent with a marking pencil so that the vent can be returned to the
same position after the caulking is applied.
4. Remove the vent from the roof panel, turn upside down, and apply caulking to the mounting
surface of the sides and top.
5. At this time, install and tighten three 5/16 x 3/4 bin bolts and nuts in the holes directly
above and below the manhole (in the roof panel to prevent leakage).
6. Locate the roof vent on the roof panel in its original position and attach with the #14 x 3/4
self-drilling screws provided. If a screw gun is not available, use the holes in the vent as a
guide and drill 3/8 holes through the vent and roof panel, and attach with 5/16 x 3/4 bin
bolts and nuts.
7. Install 5/16 x 3/4 bin bolts and nuts in the clips and bottom of screen as shown in detail on
previous page.
8. Tighten all bolts securely.
NOTE: Roofs with structural beams may require field installation of angles between beams at
both top and bottom of manhole opening if 20 PSF or 30 PSF live loading is required.

Page 55

MANUAL CHIEF42 CB34 TITAN

C. Mushroom Vent Installation


1. Refer to the bulletin that comes with the vent for installation procedures
2. Mushroom vents are attached to pre-punched roof sheets with holes at the lower end of
the sheets.

MANUAL CHIEF42 CB34 TITAN

Page 56

Section 5 Temperature Cables


A. General Considerations
Follow temperature cable manufacturers recommendations for installation of temperature
cables. Be sure to allow adequate clearance for sweep augers or other internal equipment.
All temperature cables should be stabilized at floor level, to prevent cables from drifting out
towards the sidewall as bin is being filled. The use of light twine or monofilament line
double wrapped and secured to a recessed anchor, is a common practice.
Provide adequate sealant where temperature cable leads exit the bin.
Support of temperature cables by any means other than Chief Industries recommended
brackets may cause structural damage to the bin roof and will nullify the Chief Grain Bin
Warranty.
Note: Structured Roofs are designed for a maximum load of 2,000 lbs. per
temperature cable. If this load is exceeded, this may cause structural damage to
the bin roof and will nullify the Chief Grain Bin Warranty.

#34 Temperature Cables


Bin
Size

Total #
Temp.
Cables

Temp. Cables
#/Radius

Center Supp
HDS-1

#34

24

4/8'-10"
8/27'-2"
12/44'-3"

Page 57

MANUAL CHIEF42 CB34 TITAN

---

B. Temperature Cable Brackets (15 Rings and Shorter)


(1) Install temperature cable bracket as shown below. Do not install more than one
temperature cable per roof beam.
(2) Attach temperature cables to rafters per temperature cable manufactures instructions

MANUAL CHIEF42 CB34 TITAN

Page 58

#34 Bin Temperature Cable Layout (15 Rings and Shorter)

Page 59

MANUAL CHIEF42 CB34 TITAN

C. Temperature Cable Brackets (16 Rings and Taller)


(1) Install temperature cable brackets as shown below.
(2) Attach support beams to bottom of rafters
(3) Attach temperature cables to support beams per temperature cable manufactures
instructions

MANUAL CHIEF42 CB34 TITAN

Page 60

Page 61

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 62

Section 6 Sidewall Sheet and Stiffener Gauge Chart


Note: All Sidewall and Stiffener gauges in the charts below are for standard bins. If bins are
designed for High Load/Unload rates, concrete pits or Seismic Conditions, Contact Chief
Industries, Inc. for gauge chart needed.

Page 63

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 64

Page 65

MANUAL CHIEF42 CB34 TITAN

Section 7 Sidewall Erection


A. Sidewall Sheets and Stiffeners
NOTE: All sheets must be installed with color code right side down as shown below. Check the
edges of the sheet for traces of the shop color code. The shop color code is always located on the
bottom edge of the sheet. The color codes and their corresponding gauges are listed in the table
below.
Sidewall Sheet Gauge
Color
20
White
18
Orange
17
Light Blue
16
Green
14
Yellow
14 Transition
Yellow/Black
13
Brown
12
Dark Blue
11
Pink
10
Black
9
Light Green
8
Red
Note: Sidewall Sheets for Top Ring are also
color coded with GOLD

MANUAL CHIEF42 CB34 TITAN

Page 66

Page 67

MANUAL CHIEF42 CB34 TITAN

NOTE: Proper Bolting Sequence Must Be Followed At All Times.


(1) Tighten bolts in top 2 rings and top stiffeners.
(2) Select sheets of the proper gauge for the 3rd ring of the bin. Select proper gauge and
length of stiffeners.
(3) Install stiffener splice plates, to both ends of stiffeners with (2) 7/16 x 1-1/4 Bin
Bolts and whiz flange nuts per splice before securing the stiffener to the bin. Note: On
top stiffeners, splice plate is only required on the bottom end of the stiffener.
(3) Wipe excess oil from ends of the sheets and apply caulking as shown below

(4) Loosely assemble 3rd ring


(5) Loosely install stiffeners of the proper gauge to the exterior of the bin with 7/16 bin
bolts. Stiffener bolts are always placed with heads inside the bin. Using large
alignment punch, force stiffener up so that splices are tightly compressed. Tighten (4)
four bolts in 3rd ring to keep stiffeners compressed. Loosely install the (2) 7/16 x 11/4 bolts connecting the stiffener splices to the stiffener splice plate above.
Note:
Blocks may be used to place under the stiffener splices to compress the stiffener splices.
Note:
Install bolts on sidewall sheets seam that are in the center of stiffener holes before installing
next stiffener.
MANUAL CHIEF42 CB34 TITAN

Page 68

(6) Lower the bin on to the foundation. This will force the 2 ring stiffeners in 2nd and 3rd
ring up to splices.
(7) Tighten stiffeners to sheets and stiffener splice to stiffener splice bolts.
(8) Tighten bolts in vertical seams in 3nd ring.
(9) Tighten bolts in horizontal seams between 2nd and 3rd ring beginning at center of sheet
and working both ways.
(10) Add ladder sections as required (See separate Ladder Manual)
(11) Repeat steps 1 thru 10 to add 4th ring and each additional ring. Proper bolting
sequence must be followed at all times to assure proper assembly.
NOTE: Use 7/16x1 1/4 bin bolts at bottom sidelap of transition sheets. Use 5/16x3/4 bin
bolts at the top sidelap at vertical seams of transition sheet.

NOTE: All bins have all 2 ring bottom stiffeners at the bottom, a 1 ring stiffener must be
placed at every other stiffener line in the 3rd ring.

Page 69

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 70

B. Laminated Sheet Installation


(1). All rings, which require laminated sheets (indicated in the sheet and stiffener charts)
must be installed with the endlaps interlapped as shown in the endlap detail below.
(2). Select the proper sheet gauge for each ring of the bin as indicated in the stiffener and
gauge chart.

Laminated Sheet Endlap


(3). Lap the bin sheets so that the outside ring of sheets follow this sequence: The right end of
each sheet is always on the outside of the bin and the left end is always on the inside
(looking from the outside). Refer to the endlap detail.
NOTE: This sequence is the same as the single sheet sequence.
(4). Lap the inner ring of the bin sheet so that they follow the same lapping sequence as the
outside ring of sheets. Refer to the endlap detail for lapping sequence.
(5). Follow the bolt installation procedure for bin sheet endlaps and sidelaps.
(6). Install stiffeners as outlined.

Page 71

MANUAL CHIEF42 CB34 TITAN

C. Base Angle Detail

(1) Bolt the base angle to the bottom of the bottom sheet as shown, with either 5/16 x 3/4 with
a 3/8 flat washer between the whiz nut and the base angle or 7/16 bin bolts.
(2) Seal base angle to concrete, using plastic cement or tar sealant. (NOTE: Sealant not supplied
by Chief Industries, Inc.)

MANUAL CHIEF42 CB34 TITAN

Page 72

D. Titan One Ring Door


1. Place expandable foam around edges of frames as shown below.

2. Bolt the inner and outer frame to the bin sidewall with 7/16 x 3 bin bolts, making sure to
only place bolts in the holes shown in the detail below. The top eyebrow on the outer frame is to
be placed behind the sheet above the door. The bottom eyebrow is to be placed on the outside of
the sheet below the door. Bolt the inner and outer frames together with (10) 7/16 x 2 bin bolts
with whiz flange nuts.

Page 73

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 74

Page 75

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 76

Page 77

MANUAL CHIEF42 CB34 TITAN

2 Ring Door Installation (optional)


Place expandable foam around edges of frames as shown below.

1. Bolt the inner and outer frame to the bin sidewall with 7/16 x 3 bin bolts, making sure
to only place bolts in the holes shown. Bolt the inner and outer frames together with (10)
7/16 x 2 bin bolts with whiz flange nuts.

MANUAL CHIEF42 CB34 TITAN

Page 78

Page 79

MANUAL CHIEF42 CB34 TITAN

MANUAL CHIEF42 CB34 TITAN

Page 80

3 STIFFENED TANK

Page 81

MANUAL CHIEF42 CB34 TITAN

2 STIFFENED TANK

MANUAL CHIEF42 CB34 TITAN

Page 82

E. Heavy Bin Stiffener Anchor


(1) All bins will have ALL 2 ring bottom stiffeners. Stiffened bins may have two or three
Stiffeners per sidewall sheet depending upon bin size and height.

IMPORTANT: All anchors


must be bearing firmly upon
concrete or shimmed to
develop full bearing contact
with concrete foundation

(2) Bolt anchor brackets to 2-ring bottom stiffeners. DO NOT fully tighten, only finger
tighten at this time.
(3) After the bottom ring is attached, lower the bin carefully, placing all anchor brackets
over the anchor bolts.
(4) When full weight of the bin is on the concrete, shim the anchors as necessary by
sliding shim plates between the concrete and anchor bracket. All anchors must be
bearing upon the concrete or shimmed so that full bearing of the anchor is developed.
NOTE: Anchors placed over aeration trenches must be supported from the bottom of the
trench.
After all anchors brackets are shimmed snuggly, place two square washers over the
anchor bolt and tighten.
Plastic cement or tar sealant should be applied from inside the bin to seal the bottom ring
to concrete. (NOTE: Sealant is not furnished by Chief Industries, INC.)

Page 83

MANUAL CHIEF42 CB34 TITAN

Bin Stiffener anchors allow up to 3 anchor bolts to be used at each anchor location. There are (2)
1 diameter and (1) 1-1/2 diameter holes in each Bin Stiffener Anchor.
There are several different combinations that Chief Industries Recommends to anchor the bin to
the foundation.
1. One 1-1/4 x 12 anchor bolt may be used in the 1-1/2 diameter hole, if this is done the
anchor bolt must be pre set in the concrete
2. Two 3/4 x 12 anchor bolts may be used in the two 1 diameter holes. If this is done, at least
one of the two anchor bolts must be pre set in the concrete the second may be drilled in. (It is
recommended that both anchor bolts are pre-set.)
If anchor bolts are not pre set as stated above, and the anchor bolt radius is not held, the bins
warranty may be nullified.
Larger anchor bolts or the use of all three anchor bolts may be required if seismic conditions or
high wind loads exist. Chief Industries should be consulted for proper anchor bolts to be used.
All anchor bolts must project a minimum of 2 above the concrete floor.
All anchor bolts, nuts and washers shall conform to ASTM A307 (specification for carbon steel
threaded standard fasteners) unless otherwise noted. Anchor bolts, nuts and washers are not
provided by Chief Industries, Inc.
IMPORTANT: If expansion type anchor bolts are used to replace damaged anchor
bolts, the bolt radius circle must be checked at replacement locations so that the bin is
round when anchored. Chief Industries recommends using wedge anchors that meet
10,000 LB Pull-Out and 7,500 LB shear criteria.
Anchor Bolt
Typical Chord
Typical Chord
Radius
(2 Stiffened Bins) (3 Stiffened Bins)
18'-10 5/8"
4'-11 3/16"
3'-3 1/2"
20'-5 1/4"
4'-11 1/8"
3'-3 7/16"
21'-11 13/16"
4'-11 1/16"
3'-3 7/16"
25'-0 15/16"
4'-11"
3'-3 3/8"
28'-2 3/16"
4'-10 15/16"
3'-3 5/16"
31'-3 3/8"
4'-10 7/8"
3'-3 5/16"
34'-4 1/2"
4'-10 7/8"
3'-3 1/4"
37'-5 11/16"
4'-10 13/16"
3'-3 1/4"
40'-7"
4'-10 13/16"
3'-3 3/16"
46'-9 5/16"
4'-10 3/4"
3'-3 3/16"
52'-11 11/16"
4'-10 11/16"
3'-3 1/8"

CB12
CB13
CB14
CB16
CB18
CB20
CB22
CB24
CB26
CB30
CB34
Note:
All dimensions are to center anchor bolt.
All dimensions are for standard bins.

MANUAL CHIEF42 CB34 TITAN

Page 84

F. Transition Stiffeners
Aeration Trough Transition Stiffener Installations (for flush-floor aeration systems with two or
more fans)
(1) The formed concrete dimensions and the anchor bolt placement are important for the correct
installation of the transition stiffeners. When forming the concrete, the aeration troughs
should be located as specified in Chiefs aeration layout. The anchor bolt locations for the bin
need to be oriented to make sure that the number of anchors over the aeration trough is
minimized. When installing the anchor bolts, the bolt radius and bolt chord must be correct
and they must also be placed according to the details below.
IMPORTANT NOTE: Do NOT install the anchor bolts inside the aeration trench at this
time.

2 Stiffener/Sheet Bins

3 Stiffener/Sheet Bins

(2) When the bin is erected and located correctly (as illustrated above), insert the transition in the
aeration trough. Using the hole in the anchor bracket as a guide, drill a 3/4 hole through the
top of the transition. Slide the transition stiffener inside the transition and line it up with the
previously drilled hole. Loosely install the 5/8 x 1-1/2 A325 bolt. Rotate the transition
stiffener body so that it is centered under the bin wall anchor. See installation detail that
follows.
(3) The transition stiffener must be attached to the foundation with two (2) 5/8 x 6 expansiontype anchor bolts. The holes for these anchor bolts should now be located. With an acetylene
torch, cut two holes in the bottom of the transition using the holes in the transition stiffener
base plate as guides. (This would mark the location of the anchor bolts in the concrete as
well.)
(4) Remove the transition stiffener and the transition.

Page 85

MANUAL CHIEF42 CB34 TITAN

Aeration Trough Transition Stiffener Installation Detail


(5) Locate the two anchor bolt locations (from cutting the holes in the bottom of the transition).
Set the transition stiffener over the locations to insure that the holes line up. Also, check to
insure that the transition stiffener is directly under and in line with the anchor. Make
adjustments if necessary. Drill the two holes for the 5/8 x 6 anchor bolts.
IMPORTANT NOTE: Do NOT install anchor bolts at this time.
(6) Enlarge the two holes in the bottom of the transition to 1 diameter.
(7) Reinstall the transition and slide the transition stiffener into position Loosely install the 5/8
x 1-1/2 A325 bolt and rectangular washers at the anchor bracket location. The two 5/8 x 6
expansion-type anchor bolts should now be installed and securely tightened the 5/8 bolts at
the anchor bracket. Caulking should be applied to seal the transition.
IMPORTANT NOTE: Transition stiffeners support the bin anchors. The transition must also
be supported inside the bin. See Chiefs aeration layout for supporting the transition.

MANUAL CHIEF42 CB34 TITAN

Page 86

G. Stiffener Upgrades for Goal Post (Optional)


When a goal post is being attached to bin, an extra layer of stiffeners are laminated over standard
stiffeners at goal post location from eave to base, as been is being erected.
Chief recommends that goal post be uniformly attached to at least the top 2 rings of tank at the
stiffeners from bottom of 2nd ring to top of 1st ring.
Note: Listed below are the maximum loads that can be applied to upgraded stiffener columns.
16GA stiffener upgrade = 5,000 lbs. per column
14GA stiffener upgrade = 6,000 lbs. per column

2 stiffeners per sidewall

Page 87

MANUAL CHIEF42 CB34 TITAN

2 stiffeners per sidewall sheet

3 stiffeners per sidewall sheet

MANUAL CHIEF42 CB34 TITAN

Page 88

Section 8 Wind Rings


A. Wind Rings
Consult the Chief catalog for the quantity of wind rings required for your bin. The quantity of
wind rings depends on the size of the bin and the application of any accessories (such as a
sidedraw system). For quantities and placement of wind rings required when a Sidedraw System
is installed on the bin, refer to the charts in this manual. The wind rings will be attached to the
sidewall using one bracket per stiffener spaced 58-5/16 apart (38-7/8 on 3 stiffened bins). The
brackets are specially formed and prepunched to bolt directly to the sidewall stiffener holes. The
wind ring segments will be joined together using a bolted coupler.
NOTE: All wind ring segments are 248 long, and may need field cut to keep couplers in
between brackets. Always cut segments on end opposite end with pre-punched hole.
(1) Working from outside the bin, determine the proper location for installation of the first wind
ring.
(2) Bolt the first wind ring bracket to the sidewall stiffener holes as shown in Detail below using
(2) of the stiffener attachment bolts and nuts with bolt heads on the inside. (Note: Wind ring
brackets may be installed below the endcaps if desired to allow for clearance of ladders and
platforms.)

(3) Move right to the next stiffener and repeat step 2.


(4) When 4 wind ring brackets have been installed, slide the first ring segment through the four
brackets leaving approximately 29 inches of the segment projection past the last bracket.
Insert coupler over end of wind ring segment, and attach with 5/8 x 4 bolt.

Page 89

MANUAL CHIEF42 CB34 TITAN

(5) Repeat step 2 through 3 until four more brackets have been installed.
(6) Slide another connector into the end of the previously installed ring segment. Slide the next
ring segment through the four brackets and butt it firmly against the previous segment.

(7)

Repeat steps 5 and 6 until only one ring segment remains to be installed. Installing the
final ring segment requires special procedures.

(8)

Attach coupler to end of last wind ring segment.

MANUAL CHIEF42 CB34 TITAN

Page 90

(9)

Slide coupler attach to segment over end of 1st segment so segments are bolted together.

(10)

Field cut other end of segment so segments are flush.

(11)

Slide last coupler and brackets over segments.

(12)

Hold segments flush and slide coupler over joint and attach with 5/8 x 4 bolts. Attach
brackets to stiffeners

(15)

Check to see that all bolts in the complete wind ring are tight

(16)

Repeat steps 1 through 13 for the remaining wind rings.

Page 91

MANUAL CHIEF42 CB34 TITAN

Titan Commercial Bins 5 thru 15 Rings Tall

Drawing is for illustrative purpose only. The quantity and location of wind rings required
depends on the application of any accessories (EX: sidedraw system). On Standard Bins place
wind rings as shown in figure above. Refer to chart on following page for qty. of wind rings
required on standard tanks. (Ex. If only one wind ring is required place on 2nd ring from eave, if
2 reqd place on 2nd and 5th ring, if 3 reqd place on 2nd, 5h, and 8th and so on)

MANUAL CHIEF42 CB34 TITAN

Page 92

Titan Commercial Bins 16 thru 30 Rings Tall

Drawing is for illustrative purpose only. The quantity and location of wind rings required
depends on the application of any accessories (EX: sidedraw system). On Standard Bins place
wind rings as shown in figure above. Refer to chart on following page for qty. of wind rings on
standard tanks. (Ex. If only one wind ring is required place on 3rd ring from eave, if 2 reqd place
on 3rd and 6th ring, if 3 reqd place on 3rd, 6th, and 9th, and so on)

Page 93

MANUAL CHIEF42 CB34 TITAN

Wind rings required on standard Commercial Titan Bins

BIN
HEIGHT
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MANUAL CHIEF42 CB34 TITAN

18
0
0
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
3
3
3

20
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
3
3
3
3

BIN SERIES
22
24
26
1
1
1
1
1
2
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
2
3
3
2
3
3
2
3
3
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
4
3
3
4
3

30
1
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
4
4
5
5
5
5

34
1
2
2
2
2
2
3
3
3
3
3
3
3
3
4
4
4
4
5
5
NA
NA
NA

Page 94

Wind Ring Placement with Sidedraw Systems

Page 95

MANUAL CHIEF42 CB34 TITAN

Bin
Size
10
11
11
12
12
13
13
14
14
16
16
16
18
18
18
18
20
20
20
20
22
22
22
22
24
24
24
24
24
26
26
26
26
26
30
30
30
30
30
30
34
34
34
34
34

Ring
Height
10 - 18
10 - 18
19 - 20
10 - 18
19 - 22
10 - 18
19 - 23
10 - 18
19 - 24
10 - 15
16 - 18
19 - 26
10 - 16
17 - 21
22 - 27
28
10 - 16
17 - 21
22 - 26
27 - 29
10
11 - 21
22 - 24
25 - 28
10
11 - 20
21 - 24
25 - 28
29 - 30
10 - 15
16 - 19
20 - 23
24 - 29
30
10 - 15
16 - 19
20 - 24
25
26
27 - 30
10 - 13
14 - 17
18 - 21
22 - 25
26 - 27

MANUAL CHIEF42 CB34 TITAN

Standard
Wind Rings
Quantities
0
0
0
0
0
0
0
0
0
0
1
1
1
2
2
3
1
2
2
3
1
2
2
3
1
2
3
3
4
2
2
3
3
3
2
2
3
4
4
5
2
3
3
4
5

Additional
with
Sidedraw System
+1
+1
+2
+1
+2
+1
+2
+1
+2
+1
+1
+2
+1
+1
+2
+2
+1
+1
+2
+2
+1
+1
+2
+2
+1
+1
+1
+2
+2
+1
+2
+2
+3
+4
+1
+2
+2
+2
+3
+3
+1
+1
+2
+2
+2

Total
Wind
Rings
1
1
2
1
2
1
2
1
2
1
2
3
2
3
4
5
2
3
4
5
2
3
4
5
2
3
4
5
6
3
4
5
6
7
3
4
5
6
7
8
3
4
5
6
7

Page 96

Section 9 Miscellaneous
A. Maintenance Instructions
ROOF:

Annual inspection of the roof structure should be made to be sure there is


no holes in the roof panels and all connections are water tight. If leaks
should occur apply weatherproof caulk in the area of concern.

SIDEWALL:

Sidewall inspection must also be conducted at least annually. Should leaks


occur apply caulk to area of concern.
Should spoilage occur, thoroughly clean surfaces. If oxidation is present,
remove oxidation and apply corrosive resistance paint.

BASE:

Inspect base as often as possible for spoilage, as this is a direct indication


of excess moisture. If spoilage is present, thoroughly clean surface. If
oxidation is present, remove oxidation and apply corrosive resistance
paint. After paint has dried, apply base sealer to effected area.

DOORS:

Inspect doors and manholes as often as possible to be sure proper seal is


maintained.

DECALS:

Be sure all warning decals are installed in proper locations. Replace all
damaged or unreadable warning decals.

Page 97

MANUAL CHIEF42 CB34 TITAN

B. Comment Sheet
Dear Erector:
In an effort to better serve and please you, list below any problems you may have encountered
with your product or the erection procedures in this manual. Also list any suggestions you may
have for improvements.
Erection Manual Problems:
____________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
__________________________________________________

Recommended Solutions:
____________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
__________________________________________________

Product Problems: ____________________________________________________________


_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
__________________________________________________

Product Improvements Suggestions:


____________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
__________________________________________________

Thank you for your time and reason. All responses will be reviewed by our engineering staff.
Please detach this page and send to:

MANUAL CHIEF42 CB34 TITAN

Agri Engineering Department


Chief Industries, Inc.
P.O. Box 848
Kearney, NE 68848-0848

Page 98

CHIEF INDUSTRIES, INC.


Agri/Industrial Division
Chief Industries, Inc.
4400 East 39th
Kearney, NE

Page 99

MANUAL CHIEF42 CB34 TITAN