Está en la página 1de 18

Agricultural Mechanization Programme

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Demonstration of Agricultural Machinery - Rs.4000/- Demo

0.04

12

0.48

12

0.48

12

0.48

II

Training of farmers- Rs.4000/ per trainee per week

0.04

0.36

0.36

0.36

III

Training of Rural Youth in workshops- Rs.4000/ per trainee


per week

0.04

0.36

0.36

0.36

IV

Financial assistance for Post Harvest Equipment

1.5

1.50

0.00

0.00

0.00

0.00

0.04

0.36

0.36

0.36

0.00

0.00

0.00

0
1.00
1.00
1.25
1.25
0
0.50
0.75
0
0.94

0
3
25
6
8
0
0
25
0
1

0.00
3.00
25.00
7.50
10.00
0.00
0.00
18.75
0.00
0.94

0
2
25
6
8
0
0
25
0
1

0.00
2.00
25.00
7.50
10.00
0.00
0.00
18.75
0.00
0.94

0
3
25
8
10
0
0
30
0
1

0.00
3.00
25.00
10.00
12.50
0.00
0.00
22.50
0.00
0.94

(mention the machinery name)


V
VI

Demonstration of Post Harvest Technologies- Rs.4000/ Demo


Financial assistance for Procurement of Agricultural
Machinery and Equipment
1 Tractors
Tractor (8-15 PTO HP)
Tractor (15-20 PTO HP)
Tractor (Above 20-40 PTO HP)
Tractor (40-70 PTO HP)
2 Power Tillers
Power Tiller (below 8 BHP)
Power Tiller (8 BHP & above)
3 Rice Transplanter
Self Propelled Rice Transplanter (4 rows)

0.00

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

2.00

2.00

0.00

0.00

4 Self Propelled Machinery


Reaper cum Binder
5 Specialized Self Propelled Machinery
Reaper
Post Hole Digger / Augur
Tractor/Power Tiller (below 20 BHP) driven equipments
6
a. Land Development, tillage and seed bed preparation
equipments

0
1.25
0
0.63
0.63

0
40
0
3
12

0.00
50.00
0.00
1.89
7.56

50
0
3
12

0.00
62.50
0.00
1.89
7.56

30
0
3
12

0.00
37.50
0.00
1.89
7.56

0.00

0.00

0.00

0.00

0.00

0.00

MB Plow
Disc Plow
Cultivator
Harrow
Leveler Blade
Ridger
Laser Land Leveller
Reversible Mechanical plough
Rotavator
Rotopuddler
Reversible Hydraulic plough
b. Sowing Planting, Reaping and Digging Equipments:

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.35
0.35
0.35

1
1
2
0
2
1
0
0
3
0
0

0.15
0.15
0.30
0.00
0.30
0.15
0.00
0.00
1.05
0.00
0.00

1
0
1
0
2
1
0
0
3
0
0

0.00
0.00
0.15
0.00
0.30
0.15
0.00
0.00
1.05
0.00
0.00

0
0
2
0
2
1
0
0
3
0
0

0.00
0.00
0.30
0.00
0.30
0.15
0.00
0.00
1.05
0.00
0.00

0.00

0.00

0.00

Post Hole Digger


Tractor drawn reaper
Zero till seed cum fertilizer drill
Seed drill

0.15
0.15
0.15
0.15

0
0
0
0

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

Self Propelled Rice Transplanter (Above 4-8 rows)

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

c. Intercultivation Equipments
Power Weeder (engine operated below 2 BHP)
d. Equipment for residue management / hay and forage
equipments

0
0.15

0
4

0.00
0.60

0
3

0.00
0.45

0
4

0.00
0.60

0.00

0.00

0.00

Sugarcane thrash Cutter


Coconut Frond chopper
Balers
e. Harvesting and Threshing equipments
Multi crop Threshers
Paddy Thresher
Brush Cutter
f. Chaff Cutter (Operated by engine / electric motor below 3
hp and by power tiller and tractor of below 20 BHP tractor)

0.15
0.15
0.15
0
0.20
0.20
0.20

1
1
0
0
0
0
0

0.15
0.15
0.00
0.00
0.00
0.00
0.00

1
1
0
0
0
0
0

0.15
0.15
0.00
0.00
0.00
0.00
0.00

1
1
0
0
0
0
0

0.15
0.15
0.00
0.00
0.00
0.00
0.00

0.20

150

30.00

150

30.00

150

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.44
0.44

1
0
1
1
1
1
0
0
16
0

0.19
0.00
0.19
0.19
0.19
0.19
0.00
0.00
7.04
0.00

1
1
1
0
0
1
0
0
16
0

0.19
0.19
0.19
0.00
0.00
0.19
0.00
0.00
7.04
0.00

0
0
1
1
1
0
0
0
16
1

0.00
0.00
0.19
0.19
0.19
0.00
0.00
0.00
7.04
0.44

Tractor (above 20-35 BHP) driven equipments


7
a. Land Development, tillage and seed bed preparation
equipments
MB Plow
Disc Plow
Cultivator
Harrow
Leveler Blade
Ridger
Laser Land Leveller
Reversible Mechanical plough
Rotavator
Rotopuddler

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Reversible Hydraulic plough


b. Sowing, Planting, Reaping and Digging Equipments

0.44

0.00

0.44

0.44

0.00

0.00

0.00

Post Hole digger


Tractor drawn reaper
Zero till seed cum fertilizer drill
Seed drill
c.Inter Cultivation Equipments
Power Weeder (engine operated above 2 BHP)

0.19
0.19
0.19
0.19
0

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.19

15

2.85

15

2.85

15

2.85

0.00

0.00

0.00

0.19
0.19
0.19
0
0.25
0.25
0.25

0
1
1
0
1
0
0

0.00
0.19
0.19
0.00
0.25
0.00
0.00

0
2
1
0
1
0
0

0.00
0.38
0.19
0.00
0.25
0.00
0.00

2
1
0
1
0
0

0.00
0.38
0.19
0.00
0.25
0.00
0.00

0.25

0.25

0.25

0.25

0.00

0.00

0.00

0.00

0.00

0.00

0.44
0.44
0.44

1
1
9

0.44
0.44
3.96

1
0
9

0.44
0.00
3.96

1
1
9

0.44
0.44
3.96

d. Equipments for Residue management/Hay and Forage


Equipments
Sugarcane thrash Cutter
Coconut Frond chopper
Balers
e.Harvesting & Threshing Equipments
Multi crop Threshers
Paddy Thresher
Brush Cutter
f.Chaff Cutter (Operated by engine / electric motor above 3-5
hp and by power tiller and tractor of below 35 BHP tractor)
8 Tractor (above 35 BHP) driven equipments
a.Land Development, tillage and seed bed preparation
equipments
MB Plow
Disc Plow
Cultivator

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Harrow
Leveler Blade
Ridger
Reversible Mechanical plough
Laser Land Leveller
Rotavator
Rotopuddler
Reversible Hydraulic plough
b. Sowing Planting, Reaping and Digging Equipments:

0.44
0.44
0.44
0.44
0.63
0.63
0.63
0.63

1
2
1
1
0
50
1
4

0.44
0.88
0.44
0.44
0.00
31.50
0.63
2.52

1
2
1
1
0
50
1
4

0.44
0.88
0.44
1.00
0.00
31.50
0.63
2.52

1
2
1
1
0
50
1
4

0.44
0.88
0.44
0.44
0.00
31.50
0.63
2.52

0.00

0.00

0.00

Zero till seed cum fertilizer drill


Tractor drawn reaper

0.44
0.44

0
5

0.00
2.20

0
5

0.00
2.20

0
4

0.00
1.76

Post Hole digger

0.63

0.63

0.00

0.63

Automatic Rice NurserySowing Machine

0.63

0.00

0.00

0.63

d.Harvesting & Threshing Equipments


Thresher/Multi Crop threshers
Paddy Thresher
e.Equipments for Residue management/Hay and Forage
Equipments

0
0.63
0.63

0
2
0

0.00
1.26
0.00

0
2
0

0.00
1.26
0.00

0
2
0

0.00
1.26
0.00

0.00

0.00

0.00

Sugarcane thrash Cutter


Coconut Frond chopper
Balers (Round)
Baler (Rectangular)
Sugarcane ratoon manager
All Manual/animal drawn equipment/implements / Tools

0.63
0.63
0.63
0.63
0.63

1
6
3
2
1

0.63
3.78
1.89
1.26
0.63

1
5
3
2
0

0.63
3.15
1.89
1.26
0.00

5
3
2
1

0.00
3.15
1.89
1.26
0.63

0.00

0.00

0.00

Drum Seeder (Below 4 Row)

0.015

0.00

0.00

0.00

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

Drum Seeder (Above 4 Row)


Tree climber
10 Plant protection equipments
Manual sprayer:
Knapsack/foot operated sprayer
Powered Knapsack Sprayer/Power operated Taiwan sprayer
(capacity 8-12 lts)
Powered Knapsack Sprayer/Power operated Taiwan sprayer
(capacity above 12-16 lts)
Powered Knapsack Sprayer/Power operated Taiwan sprayer
(capacity above 16 lts)

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0.019
0.10
0

0
10
0

0.00
1.00
0.00

0
10
0

0.00
1.00
0.00

0
10
0

0.00
1.00
0.00

0.006

0.02

0.02

0.02

0.031

60

1.86

60

1.86

60

1.86

0.038

70

2.66

70

2.66

70

2.66

0.10

0.40

0.40

0.40

10.00

20.00

20.00

10.00

40.00

0.00

0.00

0.00

VII

Establishment of Farm Machinery Banks for Custom Hiring


(Upto Rs.25.00 Lakhs)- Subsidy Rs.10.00 Lakhs

VIII

Establishment of Hi-Tech, High Productive Equipment Hub


for Custom Hiring (up to Rs.100.00 Lakhs)- Subsidy -Rs.40.00
Lakhs

8.00

16.00

16.00

16.00

IX

Promotion of Farm Mechanization in Selected VillagesRs.10.00 Lakhs per Farm Machinery Bank

0.02

20

0.40

20

0.40

20

0.40

Financial assistance for promotion of Mechanized Farming


operations- Rs.2000/- per Ha per farmer per year

0
0
8.00
0.50
80.00

0
0
0
4
0

0.00
0.00
0.00
2.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

Tractor Hiring Scheme


1 Purchase of Tractors for AED
2 Purchase of Tractor drawn implemnets for AED
3 Purchase of Bull Dozers for AED

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

4 Purchase of Paddy Transplanter for AED


5 Purchase of Paddy combine Harvester for AED
6 Purchase of Balers for AED
7 Purchase of Multi Crop Thresher for AED

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

18.00
17.00
4.50
3.50

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0
0
2
0

0.00
0.00
9.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

(Rs. in Lakhs)

Minor Irrigation Scheme


1 Purchase of Rotary Drill for AED
2 Hammer cum Rotary Drill for AED
3 Purchase of Percussion Drill for AED
4 Purchase of Rock Blasting Unit for AED
5 Purchase of Air Compressor 750 cfm for AED
6 Purchase of Long Hole Equipments for AED
7 Purchase of Resitivity Metres for AED
8 Purchase of Electrical Loggers for AED
Solar Energy
Solar Powered Pumping System with automatic tracking facility
1

2017-18

2018-19

Unit cost

5 hp
7.5 hp
10 hp
Solar Driers to farmers / farmers groups for drying agricultural
produce
upto 400sq.ft
400-600sq.ft

Any other innovative schemes of AED with Components


& its unit cost
Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0
72.00
150.00
0
0
25.00
0
2.50
7.50
0
0

0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

4.80
5.80
7.00

25
10
8

120.00
58.00
56.00

25
10
8

120.00
58.00
56.00

25
10
8

120.00
58.00
56.00

0.00

0.00

0.00

4.00
6.00

1
1

4.00
6.00

1
1

4.00
6.00

1
1

4.00
6.00

0.00

0.00

0.00

685

525.73

680

520.80

672

496.80

Name of the District: ERODE

Sub Division: GOBICHETT


2016-17

Sl No Name of the component

2017-18

2018-19

Unit cost
(Rs. in Lakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

echanization Programme
Sub Division: GOBICHETTIPALAYAM
2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

12

0.48

12

0.48

60

2.40

0.36

0.36

45

1.80

0.36

0.36

45

1.80

1.50

0.00

3.00

0.00

0.00

0.00
9

0.36

0.36

45

1.80

0.00

0.00

0.00

0
3
25
6
8
0
0
30
0
1

0.00
3.00
25.00
7.50
10.00
0.00
0.00
22.50
0.00
0.94

0
2
25
6
10
0
0
25
0
1

0.00
2.00
25.00
7.50
12.50
0.00
0.00
18.75
0.00
0.94

0
13
125
32
44
0
0
135
0
5

0.00
13.00
125.00
40.00
55.00
0.00
0.00
101.25
0.00
4.70

Sub Division: GOBICHETTIPALAYAM


2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

2.00

0.00

4.00

3
12

0.00
50.00
0.00
1.89
7.56

0
200
0
15
60

0.00
250.00
0.00
9.45
37.80

3
12

0.00
50.00
0.00
1.89
7.56

0.00

0.00

0.00

0.00

0.00

0.00

0
0
1
1
2
1
0
0
3
0
0

0.00
0.00
0.15
0.15
0.30
0.15
0.00
0.00
1.05
0.00
0.00

0
0
2
0
1
1
0
0
3
0
0

0.00
0.00
0.30
0.00
0.15
0.15
0.00
0.00
1.05
0.00
0.00

2
1
8
1
9
5
0
0
15
0
0

0.15
0.15
1.20
0.15
1.35
0.75
0.00
0.00
5.25
0.00
0.00

0.00

0.00

0.00

0
0
0
0

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

40

40

Sub Division: GOBICHETTIPALAYAM


2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0
3

0.00
0.45

0
4

0.00
0.60

0
18

0.00
2.70

0.00

0.00

0.00

1
1
0
0
0
0
0

0.15
0.15
0.00
0.00
0.00
0.00
0.00

1
1
0
0
0
0
0

0.15
0.15
0.00
0.00
0.00
0.00
0.00

5
5
0
0
0
0
0

0.75
0.75
0.00
0.00
0.00
0.00
0.00

150

30.00

150

30.00

750

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0
0
1
0
1
1
0
0
16
0

0.00
0.00
0.19
0.00
0.19
0.19
0.00
0.00
7.04
0.00

0
0
1
0
1
0
0
0
16
0

0.00
0.00
0.19
0.00
0.19
0.00
0.00
0.00
7.04
0.00

2
1
5
2
4
3
0
0
80
1

0.38
0.19
0.95
0.38
0.76
0.57
0.00
0.00
35.20
0.44

Sub Division: GOBICHETTIPALAYAM


2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0.44

0.44

1.76

0.00

0.00

0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

15

2.85

15

2.85

75

14.25

0.00

0.00

0.00

0
2
1
0
1
0
0

0.00
0.38
0.19
0.00
0.25
0.00
0.00

0
2
1
0
1
0
0

0.00
0.38
0.19
0.00
0.25
0.00
0.00

0
9
5
0
5
0
0

0.00
1.71
0.95
0.00
1.25
0.00
0.00

0.25

0.25

1.25

0.00

0.00

0.00

0.00

0.00

0.00

1
1
9

0.44
0.44
3.96

1
0
9

0.44
0.00
3.96

5
3
45

2.20
1.32
19.80

Sub Division: GOBICHETTIPALAYAM


2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

1
2
1
1
0
50
1
4

0.44
0.88
0.44
0.44
0.00
31.50
0.63
2.52

1
2
1
1
0
50
1
4

0.44
0.88
0.44
0.44
0.00
31.50
0.63
2.52

5
10
5
5
0
250
5
20

2.20
4.40
2.20
2.76
0.00
157.50
3.15
12.60

0.00

0.00

0.00

0
4

0.00
1.76

0
4

0.00
1.76

0
22

0.00
9.68

0.00

0.00

1.26

0.63

0.00

1.26

0
2
0

0.00
1.26
0.00

0
2
0

0.00
1.26
0.00

0
10
0

0.00
6.30
0.00

0.00

0.00

0.00

6
3
2

0.00
3.78
1.89
1.26
0.00

6
3
2
0

0.00
3.78
1.89
1.26
0.00

2
28
15
10
2

1.26
17.64
9.45
6.30
1.26

0.00

0.00

0.00

0.00

0.00

0.00

Sub Division: GOBICHETTIPALAYAM


2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0
10
0

0.00
1.00
0.00

0
10
0

0.00
1.00
0.00

0
50
0

0.00
5.00
0.00

0.02

0.02

20

0.12

60

1.86

60

1.86

300

9.30

70

2.66

70

2.66

350

13.30

0.40

0.40

20

2.00

10.00

10.00

70.00

0.00

0.00

0.00

16.00

8.00

72.00

15

0.30

15

0.30

90

1.80

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0
0
0
4
0

0.00
0.00
0.00
2.00
0.00

Sub Division: GOBICHETTIPALAYAM


2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0
0
0
0

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0
0
2
0

0.00
0.00
9.00
0.00

Sub Division: GOBICHETTIPALAYAM


2019-20

2020-21

Total

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

Phy
(in Nos)

Fin
(Rs.inLakhs)

0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

25
10
8

120.00
58.00
56.00

25
10
8

120.00
58.00
56.00

125
50
40

600.00
290.00
280.00

0.00

0.00

0.00

1
1

4.00
6.00

1
1

4.00
6.00

5
5

20.00
30.00

0.00

0.00

0.00

672

506.48

662

491.47

3371

2541.30

Sub Division: GOBICHETTIPALAYAM


2019-20
Phy
(in Nos)

Fin
(Rs.inLakhs)

2020-21
Phy
(in Nos)

Fin
(Rs.inLakhs)

Total
Phy
(in Nos)

Assistant Executive Engineer(AE)


Gobichettipalayam

Fin
(Rs.inLakhs)

También podría gustarte