Documentos de Académico
Documentos de Profesional
Documentos de Cultura
GST0007AJ0036
GSC-TFMG-07-31934
ISSUED TO:
The Contractor's Basic GSA Scbedllie contract is applicable to the Task Order that
is awarded under this RFQ
ISSUED BY:
General Services Administration
Federal Systems Integr'l\tion an.d Management Center (FEDSfM)
Metro Park
. 6354 Walker Laue, Suite 200
Alexandria, VA 22310
(July 9, 2007)
IN SUPPORT OF:
EOP0000161
SUPPLIES OR SERVrCES AND PRJCElCOSTS
The contractor shall perfoInl the effort required by this task order on a Finn Fixed Price (FFP)
basis. The work shall be perfonned in accordance wilh all sections of this task order and the
offeror's GSA Schedule, under which the resulting task order will be placed.
---
Dese Qty Price
Configuration 1
0001
1 $1,717
2 $163
1 $41
2 $654
1 $490
2 $0
6 $16,348
B $106,918
1 SO
1 $5,640
6 $66,456
2 $29,636
1 (-$20,000)
OD01A $4,546
EOP0000162
SUP?UES OR SERVICES AND PRICE/COSTS
•
COnflgUra.t.lo n.2• • • • • •
0002 iii
1 $82
'I $0
1 $2,044
1 $0
........- ., 1 .. $13,365-
___ 1
$673
1 $14,916
0002A 1 $2,633
0003
$2,044
OD03A $2,633
0004
- 'I
1
'2
1
33
$34.127
$1,717
$4,823
$2,411
$24,200
,
B $622
$469
1 $0
1 $0
..
IE.
$0
4
, $0 :
4 $65
1 $0
1 $0
1 $0
1 $0
EOP0000163
_. SUPPLIES OR SERVICES AND PRICE/COSTS
.4
1
1
$2,354
$20,027
$17,880
$9,920
0004A $5,265
OD048 . . 1. $2,418
--
Configuration 5
0005
2 $4,823
26 '$25,777
1 $0
Task Order GST0007AJ0036 Page 3
GSA Schedule GS-35F-0343J
EOP0000164
-
SUPPLIES OR SERVICES AND PRICE/COSTS
0005A
.. $17.BBO
$2,418
EOP0000165
DESCIUPTIONISPECIFJCATIONS/STATEMENT OF WORK
2.1 PURPOSE
This task order snpPoI1s the Executive Office of the President (EOP) through the procurement of
network storage..
2.2 BACKGROUND
A single award will be made for all items. The contractor shall provide aU items in Section 1.2.
All proposed hardware shall include shipping within Washington, DC (CONUS).
Compliance with Section 508 requirements is applicable to quotes submitted in response to tius
RFQ.
EOP0000166
INSPECTION AND 'ACCEPTANCE
The Government requires a period not to exceed fi !teen (15) work days after receipt of final
deliverable items for inspection and acceptance or rejection.
The basis for acceptance shaH be compliance with the requirements set forth in the Task Order,
the contractor's proposal and other terms and conditions of the contract. Deliverable items
rejected shall be corrected in accordance with the applicable clauses.
The Government shaH provide written notification of acceptance'or rejection of all final
deliverables within fifteen (15) worle days (unless specified otherwise in Deliveries or
PE!1formance). All notifications 'of rej ection will be accompanied with atl explanation ofllie
specific deficiencies causing the rejection.
EOP0000167'
INSPECTION AND ACCEPTANCE
Delivery for hardware is 14 days from date ofaward. Required services shall be accomplished
within 16 days after delivery.
GSDIRDF I• • •
Anacostia Naval Annex
Bldg 4 J OlDoor l;l3. TO# GST0007AJ003 6'
250 Murray Lane, SW '
Washington, DC 20509
NOTE:
Contractor MUST follow all procedures as explained in the attached document Remote Delivery
Site (RDS) Solicited Address and Access Procedures. An RDS 410 Delivery Appointment Fonn
is also attached.
All electronic and infonnation technology (EIT) procured through this Task order must meet the
applicable accessibility standards of 36 CFR 1194. 36 CPR 1194 implements SectioD 508 of the
Rehabilitation Act of 1973, as amended, and is viewable at the following URL: '
TIle following Section 508 technical standards are applicable to this task order, as a minimum:
The contTactor shall indicate for each line item in the schedule whether each product or service is
complioUlt or non-compliant with the accessibility standards of 36 CPR 1194. Further, the
proposal must·indicate·where full details of compliance can be found (e. g., vendor's website or
other exact location):
EOP0000168
CONTRACT ADMlNJSTRAnON DA TA
The contractor shall submit Requests fOT Payments in accordance with the format contained in
GSAM 552.232·70, JNV01CE REQUIREMENTS (SEPT 1999), to be considered proper for
payment. In addition, the dala elements indica1ed below shall be included on each invoice.
The contractor shall utilize FEDSIlvPs electronic Tracking and Ordering System (T08) Next to
submit invoices. TIle contractor shallsubrrrit invQices electronically by logging onto:
Select Vendor Support. log in using yOUT assigned J.D. and password, then click on Create
Invoice. The TOS Next Help Desk sbouJd be contacted for support at ( . By
utilizing this method, no paper copy of the invoice shall be submitted to GSA FEDSIM or the
GSA Finance Center in Ft. Worth, TX, . However, the cootractor may be required to submit a
written "hardcopy" invoice to the Government if requested by the FEDSlM COR.
GSAFEDSIM
ATTN: eo CO
6354 Walker Lane, Suite 200
Alexandria, VA 22310 .
TeleP- = : , e :
Fax:
Email
GSDIRD.F• •
ATrn:~
!IIIIIJ
Street: 250 Murray Lane, SW
Building 410/Door 123
City/Str1te: Washington, D.C. 20509
Telephone:
Email:
EOP0000169
CONTRACT ADMINISTRATION DATA
GSAFEDSLM
ATTN: • • • COR
6354 Walker Lane, Suite 200
Alexandria, VA 22310
Telep~hne:
Fax:
Email:
8..The Conlnlcting Officer will aPPo1nt a COR in writing for each Contract/task order (TO).
The COR ,vill receive, for the Government, all work called for by the ContractfTO and will
represent the CO in the technical phases. of the work. The COR will provide no supervisory or
instructional assistance to contractor personnel
b. The COR is not authorized to change any of the terms and conditions of the Contract.or tbe
ContraclfTO. Cbanges in the scope ofworlc will be made only by the CO by properly executed
modifications [0 the Contract or the TO. Additional responsibilities of the COR include:
c. The contractor is advised that only the CO, acting within the scope of1his ContractffO and
to
the CO's authority, has the authority make changes which affect ContIactITO 'prices, quality,
quantities, or deliverytenns.
d. The COR will. furnish technical advice to tile contractor to provide'specmc details, milestones
to be met within the terms of the Contract!I:O, and any other advice of a technical nature
necessary to perfonn the work specified in !he ContractITO. The COR shall not issue any
instrllctions which would constitute a contractual cbang~,
Task Order GST0007AJ0036 l;'age 9
GSA SchecluJe GS-35F-0343J
EOP0000170
CONTRACT CLAUSES
1
EOP0000171