Welcome to the PCR-PPR Cost Estimate Workbook. This Excel Workbook is designed to calculate the cost estimates that are required as part of the Project Charter Review (PCR) and Project Plan Review (PPR)
MSP-IT Control Gates. Please see below for important instructions and notes about this workbook. If you have any questions or need to unlock any of the worksheets to add rows, please contact mspit@state.gov.
Using This Template with iSchedule - Beginning with MSP-IT Version 1.2, this template has been replaced by equivalent functionality iSchedule. Project teams have two choices as to how to develop cost
estimates:
1. Create and finalize the Cost Estimate directly in iSchedule.
2. Create and finalize the Cost Estimate in this template, then enter the information into iSchedule.
Worksheet-specific Instructions
Tab
Project Name and Schedule
Sections
Instructions
Enter expected completion date of each control gate. See Notes above for how to handle Skipped and Combined Control
Gates
NOTE: This Cost Workbook Template does factor in US Federal Holidays. To add/remove/change Holidays, see NOTE on the Holidays tab.
Name (Column B)
Name of the US Holiday
Date (Column C)
Date of the US Holiday
Control Gate End Estimate (Column E)
Holidays
Rates
NOTE: The 'Rates' tab contains blended rates for the Vanguard 2.x contracts. There are 6 entries (Custom 1 - 6) that can be customized to suit your project. To update the
information in Level (Column B) for Custom entries you must use the Data Validation feature, and also update Level on the Labor tab using the same Data Validation feature. Blended
Rates for 2.2.4 have not yet been verified, and this information will be updated accordingly soon. Vanguard 2.2.3 has not yet been awarded.
Contract (A35-A46)
Level (Column B)
Cost (C35-C46)
Resource Role (Column E)
Level (Column F)
Currently Funded (Column G)
Labor
Materials
and ODC
Summary PCR
Summary PPR
Funding Summary
Version History
Vanguard Reference
1
2
Project Name:
4
5
Phase
Gray Cells
Do Not Change
11
12/30/1899
13
14
12/30/1899
Solicitation Review
12/30/1899
Post-Implementation Review
16
18
10
17
White Cells
Do Not Change
15
System Operations
(1-year)
19
Instructions
20
21
22
Step 1 of 2 - Model contiguous, combined control gates by giving them all the same end date and surrounding with a thick border, as
shown below:
23
10/20/14
24
10/20/14
25
Step 2 of 2 - On the Labor tab, lump all labor for the combined gates into the first of the control gates that are combined. In the above
example, all labor would be lumped into the Preliminary Design Review Control Gate.
26
27
Step 1 of 1 - Model skipped control gates by giving each skipped control gate the same end date as the previous control gate and
using a strikethrough font, as shown below:
28
7/20/14
29
Solicitation Review
7/20/14
30
9/20/14
31
32
33
See the Instructions tab Notes section for target accuracy of estimates. Note that the dates provided at PPR are used to monitor project
schedule performance for subsequent gates.
Name
New Years Day
Birthday of Martin Luther King, Jr.
Washingtons Birthday
Memorial Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
New Years Day
Birthday of Martin Luther King, Jr.
Washingtons Birthday
Memorial Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
New Years Day
Birthday of Martin Luther King, Jr.
Washingtons Birthday
Memorial Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
Date
1/1/2014
1/20/2014
2/17/2014
5/26/2014
7/4/2014
9/1/2014
10/13/2014
11/11/2014
11/27/2014
12/25/2014
1/1/2015
1/19/2015
2/16/2015
5/25/2015
7/3/2015
9/7/2015
10/12/2015
11/11/2015
11/26/2015
12/25/2015
1/1/2016
1/18/2016
2/15/2016
5/30/2016
7/4/2016
9/5/2016
10/10/2016
11/11/2016
11/24/2016
12/26/2016
Contract
2.1
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.3.1
2.3.2
2.3.3
2.3.4
Level
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
49.87
63.18
71.00
90.91
76.63
93.75
114.53
153.52
69.36
81.36
102.21
120.40
34.16
53.92
70.95
89.58
54.49
69.61
104.73
136.08
55.89
77.07
109.84
153.60
75.78
87.67
105.08
132.25
75.78
87.67
105.08
132.25
56.63
71.65
83.52
142.36
71.69
2.3.4
Custom 1
Custom 2
Custom 3
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
Entry Level
Journeyman
Senior
Master
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
81.50
97.78
123.80
60.00
90.00
120.00
150.00
60.00
90.00
120.00
150.00
60.00
90.00
120.00
150.00
Resource Role
Level
Currently
Funded?
Investment
Management Code
Contract/Labor
Source
Number of Resources
by Control Gate
Notes
Unit Cost
Labor Days
Total Cost
Total Cost By
Control Gate
Total Cost by
Phase
1
2
Phase
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Deployment
43
44
45
46
47
Post-Implementation Review
48
49
50
51
52
53
54
55
O&M
56
57
58
59
60
Totals
61
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
- $
- $
62
Summary
63
Roles
Definition
64
Contract
Number of
Resources
Architect
System Architects
65
2.1
Deployer
66
2.2.1
Programmer
67
2.2.2
PMO
68
2.2.3
Project Manager
Project Manager
69
2.2.4
QA
70
2.2.5
71
2.3.1
Functional SME
72
2.3.2
73
2.3.3
Tester
74
2.3.4
Tier 1 Support
75
Custom 1
Tier 2 Support
76
Custom 2
Tier 3 Support
77
Custom 3
78
Total
Cost
Phase
Deployment
Deployment
Post-Implementation Review
O&M
Deactivation Approval Review
Name
Currently
Funded?
Investment
Management
Code
Unit Cost
Quantity Required
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
$0
Cost Categories
Hardware
License
Maintenance Agreement
Premium Support
Other
Travel
Project Name:
Version:
Version Date:
Labor + Materials
Materials & ODC
& ODC
Phase
12/30/1899
12/30/1899
Deployment
12/30/1899
Sub-total
System Operations *
Contract Labor
12/30/1899
$
$
Currently
Funded?
Investment
Management Code
Err:501
Additional
Funding Required
Phase
Labor Hours
White Cells
Do Not Change
Gray Cells
Do Not Change
Red Cells
Indicates negative values
Deployment
O&M
Gold Cells
Indicates that IMC required
TCO Cost
Do Not Change
Total Unfunded
Do Not Change
$
Err:501
Labor Days
Tail
Do Not Change
Costs
Funding Item
$0.0K
$0.0K
$0.0K
$0.0K
Total
TCO Cost
Total Unfunded
Funded
Labor
$0.0K
23
Control Gate
Labor Hours
1
2
Project Name:
Version:
Version Date:
4
5
Phase
Contract Labor
Labor + Materials
& ODC
Currently
Funded?
Investment
Management Code
Additional
Funding Required
Red Cells
Indicates negative values
TCO Cost
Do Not Change
Solicitation Review
Total Unfunded
Do Not Change
Tail
Do Not Change
10
11
13
14
Post-Implementation Review
15
Deployment
16
Sub-total
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
System Operations
(1-year)
Deployment
O&M
Solicitation Review
Gold Cells
Indicates that IMC required
Phase
White Cells
Do Not Change
Gray Cells
Do Not Change
Labor Days
Phase
Labor Hours
Costs
Costs
Labor Days
Deployment
O&M
(1) See Notes on the Instructions tab for proper data and illustration of Skipped and Combined control gates
Funding Item
Tail
TCO Cost
Total Unfunded
Funded
Materials & ODC
Labor
Labor
Materials & ODC
Funded
Total Unfunded
Total
$
$
$
$
$
$
TCO Cost
Tail
$0.0K
$0.0K
$0.0K
$0.0K
$0.0K
$0.0K
24
VMO ONLY
Prioritization Assessment
Project priority ranking
Prioritization notes
Available capacity
Recommendation (based on
capacity required, available capacity
and project priority)
Project Name:
Version:
Version Date:
Funding Source
IMC Code(s) or
Contract Name
2014
2015
2016
2017
2018
2019
2020
Total
Funded Total
$
$
Unfunded Total
Total Project Budget
Version #
1
Description
Edited By
1.1
Hannah Kemp
1.2
1.3
1.4
Greg Steinbach
Hannah Kemp
Hannah Kemp
1.5
Adam McIlwain
1.6
Dave Kubiak
1.7
Dave Kubiak
1.8
Dave Kubiak
1.9
IRM/BMP/PSO/MAP
2.0
2.1
2.2
IRM/BMP/SPO/MAP
Date
4/9/2013
5/13/2013
5/15/2013
5/15/2013
5/22/2013
6/6/2013
6/17/2013
7/1/2013
7/17/2013
9/12/2013
6/11/2014
8/12/2014
11/18/2015
Contract Name
Contract Number
SAQMMA12F1424
2.1
5/11/2012
(start 6/1/12)
Performance Period
7 yrs.
Awarded $4.9M,
(1 base/6
NTE $241.5M
Contract Areas
Contract Type
CO
COR
(w/performance
incentives)
Steven
Haines
Gail Shuster
Steven
Haines
Stephen Shinnick
Steven
Haines
1 yr. opts),
5/11/12 to 5/10/19
SAQMMA11F0233
2.2.1
12/22/2010
(start 2/9/11)
10 yrs.
Awarded $171.7M,
(1 base/9
NTE $2,512M
1 yr. opts),
2/9/12 to
2/8/2021
SAQMMA12F0405
2.2.2
(AAST/ Intercom)
3/28/2012
(start 4/1/12)
7 yrs.
Awarded $3.16M,
NTE $62.3M
4/1/12 to 3/31/19
TBD
2.2.3
TBD
TBD
TBD
TBD
4 yrs.
Awarded $0.0,
NTE $28.5M
(separate contract)
SAQMMA11D0114
2.2.4
Copper River
9/12/2011
TBD
TBD
TBD
(individual delivery
orders)
9/12/11 to 9/11/15
2.2.5
Not Awarded
2.3.1
Not Awarded
Not
Not
Awarded
Awarded
SAQMMA13F2905
(Alliant task order)
Awarded $2.9M,
9/29/2013
5 yrs.
SAQMMA13F2651
2.3.2
9/29/2013
5 yrs.
NTE $59.9M
SAQMMA13F2583
Valida Tek Inc.
5 yrs.
5 yrs.
NTE $17.2M
Awarded
Steven
Haines
Steven
Haines
Steven
Haines
Steven
Haines
Awarded $3.3M,
9/29/2013
Not
NTE $34.7M
SAQMMA13F2906
Clearavenue
Telephone procurement.
Awarded $1.4M,
9/29/2013
2.3.4
NTE $77.4M
Awarded $2.1M,
2.3.3
Not Awarded
Vendor Management Office, Contract Management Plan for the Vanguard 2.0 Program, 10-29-13
(w/performance
incentives)
FFP & T&M
(w/award fee)