8/2015-10/2015
Identified scope and stakeholders impacted by redesign of infrastructure cross verified with
contract and SOW this was an extension of my work with IBM since 2013.
Created communication plan for the stakeholders interviewed IBM and Cisco
Anticipated risks versus just reacting to problems not anticipated
Identified risks and owners for mitigation plans used lessons learned to leverage solutions from
similar projects I also leveraged my experience with dozens of projects across the country
Communicated daily with stakeholders, vendors and clients Agile Scrum by IBM leveraged
my Agile background to manage
Escalated as needed to meet schedule
Documented Findings for Improvement of Infrastructure by IBM and Cisco
3/2013 8/2015
gmurrell99@gmail.com
502-618-3195
859-552-9513
Identified scope and stakeholders impacted cross verified with SOW and contract
Gathered requirements from stakeholders (Delta, CenturyLink, Freddie Mac, BHP etc.)
Wrote Proposed Delivered Requirements (PDR) cross verified with stakeholders and contract
Created communication plan for the stakeholders managed conflicts at my level before
escalating
Anticipated risks versus just reacting to problems not anticipated.
Identified risks and owners for mitigation plans during meetings ensured buy in from owners
Wrote project plan reviewed weekly with stakeholders, vendors and transition team
Created changes as required from project plan and tracked via change management
Tracked problems as action items with owners daily created punch out list for risks and
problems
Procured all equipment needed and tracked for managing budget tracked in dashboard
Communicated daily with stakeholders, vendors and clients.
Escalated as needed to meet schedules.
Saved 40-50% on internet access costs
Negotiated between vendors and IBM to meet requirements my collaborative approach and
technical background mitigated any miscommunications with vendors that could impact the
schedule
Environments Hypervisor, Unix / Wintel, Storage and Network for clients on IBM floor space
Worked with technical team during build out to ensure project plan was on track my technical
background enabled me to see technical project issues that would impact the schedule that others
would miss
2012-2013
2012
2011-2012
gmurrell99@gmail.com
502-618-3195
859-552-9513
Managed 20 SMEs to roll out per project plan the virtual infrastructure to cut costs my
technical background enabled me to assess the technical plans were viable and integrated
Between projects I became certified in networking CCNA, VMware (virtualization), ITIL
and PMP - online as well as on campus to anticipate the next wave of technology
2007-2009
2006 - 2007