Steam Turbine

Mechanical Maintenance

Routine Turbine
Maintenance
Training Lesson

ALSTOM (Switzerland) Ltd

ABCD

ABCD

Steam Turbine
Mechanical Maintenance

Routine Turbine
Maintenance

We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly
forbidden.
Copyright by ALSTOM (Switzerland) Ltd 2007
This is a training lesson. It provides overall information about the specific system
only.
All mentioned / attached values and settings are for information only. The values
might be changed during commissioning.
For actual values please refer to the Instruction Manual.

Power Plant Training Center


CSXA220043enC

Page 2

ABCD

Steam Turbine
Mechanical Maintenance

Routine Turbine
Maintenance

Table of Contents
Module Objectives .............................................................................................................................. 4
Introduction ........................................................................................................................................ 5
Routine Maintenance Schedules ........................................................................................................... 5
Every Two Weeks ............................................................................................................................. 5
Every Month..................................................................................................................................... 5
Every Three Months .......................................................................................................................... 5
Every Six Months .............................................................................................................................. 6
Once a Year .................................................................................................................................... 6
Other Maintenance Checks ................................................................................................................. 6
Summary ............................................................................................................................................ 7

Power Plant Training Center


CSXA220043enC

Page 3

Steam Turbine
Mechanical Maintenance

ABCD

Routine Turbine
Maintenance

Module Objectives

Upon completion of this section, the trainee should be able to:

List the checks, which should be performed on the turbine every 2 weeks.

List the checks, which should be performed on the turbine every month.

List 5 turbine checks, which should be made every 3 months.

Describe 3 turbine checks, which must be made every 6 months.

Describe 5 maintenance checks, which must be made, on the turbine once a


year.

State how often the following tasks must be performed:


Verifying the correct functioning of the AMOT temperature elements;
Exchanging the hydraulic accumulator bladders and high pressure hoses;
Overhauling the jacking oil pumps.

Power Plant Training Center


CSXA220043enC

Page 4

Steam Turbine
Mechanical Maintenance

ABCD

Routine Turbine
Maintenance

Introduction

In addition to regular visual inspections and operational supervision, certain tasks


must be carried out at the intervals shown below. The results of the tests, checks,
measurements, etc. should be recorded in a log.
The list shows only highlights of important tasks. For full details, refer to specific
maintenance instructions in the Operation Manuals and Service Documentation
Manuals supplied with your unit.

Routine Maintenance Schedules


Every Two Weeks

Switch on stand-by equipment.

Perform partial or full stroke tests on valves.

Perform the simulated (electronic) overspeed test.

Inspect turbine insulation.

Check pressure switches with the trip function.

Check lube oil appearance and water content.

Inspect packing; tighten as needed.

Every Month

Every Three Months

If applicable, check sliding behaviour; improve sliding properties by greasing.

Check the clearances of down-holding and fixation elements.

Check for proper contact to base plates.

Compare actual valve strokes to control room indications.

Measure seal air supply pressure after the orifice.

Check the filling pressure of the hydraulic accumulators.

If it is possible to do so during operation, test the fluid level switches.

Measure shaft current at the ground brush.

Power Plant Training Center


CSXA220043enC

Page 5

Steam Turbine
Mechanical Maintenance

ABCD

Routine Turbine
Maintenance

Every Six Months

Check the condition and setting of the steam piping hangers.

Grease the motor bearings according to instructions of the manufacturer.

Tighten flanges, excluding the controlled, pre-stressed flanges.

Check the pre-stress of the anchor bolts.

Check turbine supervisory equipment for correct functioning and indication.

Using an optical level, record foundation deflection.

Record reference measurements on the spring-loaded foundations.

Record gland clearances; shaft standstill is required.

Using a vacuum, clean out all wire junction boxes and computer cabinets.

Check contact of grounding cables.

Measure shaft lift with jacking oil.

Check the pedestal and gland seal system under pressure.

Record control valve characteristics and compare them to commissioning


values.

Make an endoscopic inspection of turbine internals.

Compare steam pressure readings to valve strokes and power output.

Take a lube oil sample and have it analyzed in a laboratory according to


specification HTGD 90 117.

Record reference measurements for the rotor/casing and casing/pedestals. This


requires a cold unit.

Once a Year

Other Maintenance Checks

Verify the correct functioning of the AMOT temperature elements every 2-3
years.

Exchange hydraulic accumulator bladders and high pressure hoses every 3-4
years.

Overhaul the jacking oil pumps every 3-4 years.

Power Plant Training Center


CSXA220043enC

Page 6

ABCD

Steam Turbine
Mechanical Maintenance

Routine Turbine
Maintenance

Summary

This section list important maintenance tasks, outside the scope of overhauls, which
should be at specified regular intervals.
To ensure that you understand the topic covered, review each question in the
Objectives (page 4).

Power Plant Training Center


CSXA220043enC

Page 7

ABCD

Steam Turbine
Mechanical Maintenance

Routine Turbine
Maintenance

Blank Page

Power Plant Training Center


CSXA220043enC

Page 8