Está en la página 1de 15

DEPARTMENT ORD

DATE RELEASED

D.O. NO.

D.O. SERIES

January 05, 2015

2015

January 13, 2015


January 20, 2015
January 31, 2013

4
7
8

2015
2015
2013

January 26, 2015

10

2015

January 27, 2015

11

2015

January 27, 2015

12

2015

January 28, 2015

13

2015

February 12, 2015

15

2015

February 12, 2015

17

2015

February 12, 2015

20

2015

February 18, 2015


February 20, 2015
March 02, 2015
March 11, 2014
March 06, 2015
March 12, 2015
March 11, 2015
March 11, 2015
March 11, 2015
March 11, 2015
March 11, 2015
March 11, 2015
March 12, 2015
March 20, 2015

22
23
28
32
33
34
35
36
37
38
39
40
41
44
44

2015
2015
2015
2014
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
2012

March 20, 2015

45

2015

March 20, 2015


March 19, 2015
August 12, 2008
March 25, 2015
March 25, 2015
ocotber 8 2006

46
47
48
49
50
50

2015
2015
2008
2015
2015
2006

March 25, 2015

51

2015

July 30, 2012


April 06, 2015

52
56

2012
2015

April 06, 2015

57

2015

April 08, 2015

58

2015

April 14, 2015


July 08, 2013
june 6 2014

59
62
63

2015
2013
2014

April 22, 2015

65

2015

May 06, 2015


May 04, 2015

68
69

2015
2015

May 04, 2015

70

2015

May 09, 2015


October 05, 2012
April 30, 2015
july 7 2014
May 14, 2015
May 19, 2015
May 25, 2015
May 25, 2015
May 29, 2015
June 19, 2015
June 19, 2015
September 03, 2014

71
71
72
73
74
75
76
79
81
92
93
93

2015
2012
2015
2014
2015
2015
2015
2015
2015
2015
2015
2014

June 19, 2015

94

2015

June 19, 2015

95

2015

June 19, 2015

96

2015

June 22, 2015


sep 17 2014

98
98

2015
2014

July 09, 2015

99

2015

July 09, 2015

100

2015

July 09, 2015

101

2015

July 09, 2015

102

2015

September 24, 2014


July 09, 2015
July 09, 2015
November 08, 2013
July 09, 2015

102
103
104
104
105

2014
2015
2015
2013
2015

July 09, 2015


July 09, 2015
October 01, 2014
July 10, 2015
July 10, 2015
July 13, 2015
July 13, 2015

106
107
107
108
109
110
111

2015
2015
2014
2015
2015
2015
2015

July 14, 2015

112

2015

July 14, 2015

113

2015

July 14, 2015

114

2015

July 21, 2015


July 21, 2015

115
116

2015
2015

July 27, 2015

117

2015

July 28, 2015


July 28, 2015
July 28, 2015
July 29, 2015
August 05, 2015
aug 10 2015
November 25, 2014

118
119
120
123
125
126
128
133
134

2015
2015
2015
2015
2015
2015
2014
2015
2015

August 18, 2015

135

2015

dec 1 2014
December 01, 2014
December 01, 2014
September 18, 2015
dec 23 2014

137
138
139
143
152
156
157
159
162
163
164

2014
2014
2014
2015
2014
2015
2015
2015
2015
2015
2015

October 14, 2015


October 23, 2015
October 23, 2015
October 28, 2015

DEPARTMENT ORDERS
SUBJECT

Prescribing the Minimum Period for the Submission of Legal, Technical and Financial Documents to the
Road and Bridge Project, Polices, Responsibilites and Accountabilities
Guidelines for Shortlisting and Bid Evaluation for Consultants for Locally-Funded Infrastructure Projects
AMENDMENTS TO DEPARTMENTORDER NO. 41, SERIES OF 2007,ACCREDITATION AND ASSIGNMENTOF

Guidelines on the Procurement, Turn Over, Disposal, and Inventory of Information and Communication
Road and Bridge Projects Policies, Responsibilities and Accountabilities

Guidance on Project Modification, Realignment and Use of Savings Under the FY 2015 General Approri
Policies and Guidelines on the Use ofDPWH Information andCommunications Technology (ICT)Resource

Guidelines to Ensure Disaster Preparedness of DPWH Field Offices in Promptly Responding to Typhoons
3-Strike Policy in the Procurement of Contracts for Infrastructure Works, Goods, and Consulting Service

Prescribing a Consultant's Performance Evaluation System (CONSPES) for Locally-Funded Infrastructur


Revised Guidelines in the Preparation of Approved Budget for the Contract (ABC)
Flood Control and Drainage/Slope Protection Projects Policies
SPECIFIC GUIDELINES TO MANAGE ANDCONTROL VARIATION ORDERS FORDPWH INFRASTRUCTURE CO
STRATEGIC PERFORMANCEMANAGEMENT SYSTEM
LIQUIDATED DAMAGES ON CONTRACTSFOR GOODS THRU ALTERNATIVEMETHODS OF PROCUREMENT
AMENDING THE AUTHORITIES AND AREASOF RESPONSIBILITIES OF DPWH KEYOFFICIALS
GUIDELINES FOR THE PROCUREMENTOF MULTI-YEAR CONTRACTS FORLOCALLY-FUNDED INFRASTRUCTU
DISCLOSURE OF ONGOING CONTRACTSBY PROSPECTIVE BIDDERS FOR DPWHINFRASTRUCTURE CONTR
DISQUALIFICATION OF CONTRACTORSWITH LIQUIDATED DAMAGES ONONGOING DPWH INFRASTRUCTU
SUBCONTRACTING OF DPWHINFRASTRUCTURE PROJECTS
SUSPENSION AND BLACKLISTING OFCONTRACTORS, CONSULTANTS ANDSUPPLIERS FOR INFRASTRUCT
REQUIREMENTS FOR ISSUANCE OFCERTIFICATE OF COMPLETION ANDCERTIFICATE OF ACCEPTANCE FO
REVISED LIMITS OF DELEGATEDAUTHORITY TO DISTRICT ENGINEERSTO APPROVE DETAILED ENGINEER
DPWH Standard Specification for Item 1039 - Aluminum Cladding
Standardization of Construction Duration of DPWH Projects

DPWH Standard Specification for Item 738 - Epoxy Resin Adhesives for Bonding Traffic Markers to Hard
DPWH Standard Specification for Item 404A - Epoxy Coated reinforcing Steel Bars
Adoption of International Roughness Index Values for all National Primary Roads
Implementing of the Document Tracking System (DoTS) for Consulting Services
Reconstitution of the DPWH Citizen's Charter Team
Guidelines on Hiring and Rehiring of Job Order Personnel in the DPWH
DPWH Standard Specifications forForms and Falseworks, Item 414

Allocation of the Authorized 3.5% Deductions from Project Funds for Engineering and Administrative O
Implementing of the Document Tracking System (DoTS) for Civil Works Projects
Guidelines on the Rendition and Payment of Overtime Services by the Hour

Amendments to DPWH Standard Specification for Item 706 - Concrete, Clay, Plastic and Fiber Pipe

Guidelines and Procedures for the Implementation of D.O. 57, Series of 2009 "DPWH Solid Waste Mana
RECONSTITUTION OF THE COMPLAINTSVALIDATION AND INVESTIGATIONCOM VlITTEE (CVIC)
DPWH STANDARD DESIGNDRAWINGS (ROADS)
DPWH Standard Specification forItem 522A - Protection Systems forUnstable Slope

Exemption of all PPP Projects of the Department from the Rule Prescribing its Publication in the Officia
DPWH Social Media Networking Policy
Revised Schedule of Fees andCharges for Laboratory Testing ofConstruction Materials

Guidelines on the Design Development of Proposed DPWH Housing Subdivision Projects for Urban and
Use of Reclaimed Asphlat Pavement (RAP) in Hot Mix Asphalt
GUIDELINES FOR THEESTABLISHMENT OFCONSTRUCTION MATERIALSPRICE , STANDARD LABORAND EQ
Revised Guidelines on the Installation of Project Billboards
PROHIBITED USES WITHIN THERIGHT-Of-WAY Of NATIONALROADS
SAFETY ON BOARD ALL DPWHDREDGES AND SUPPORT VESSELS
Clarification on DPWH Standard Specification for Item 522A - Protection Systems for Unstable Slopes
Classification of DPWH Regional Offices
Revised Policies And Procedures onthe Reimbursement of Expenses forMaintenance of Equipment and
DPWH Standard Specifications forItem 1040 - Metal Lath andAccessories
49th Partial List of Initial Accreditation of DPWH Materials Engineers
Restructuring of the Specialized Clusters under the Unified Project Management Office (UPMO)
Regular Pruning/Trimming and/orCutting at Trees within the RoadRight-at-Way at our National Roads
Transferring the Flood Control Management Cluster (FCMC) Under the Supervision of the Office of the
Placing the Building Manegement Cluster (BMC) Under the Technical Services

Declaring the Access Road Inside the New Bilibid Prison (NBP) from K0031+109 to K0031+1115, as Pa
Lifting of Department Orders No. 21, Series of 2014 on the Suspension/Blacklisting of NASCON Builder
Submission of Construction Safetyand Health Program Approved by theDepartment of Labor andEmpl

Requirements for Issuance of Certificate of Completion and Certificate of Acceptance for Infrastructure

Issuance and Approval of Contract Work Suspension Order, Work Resumption Order, and Contract Tim

Reconstitution of DPWH - Performance Management Team (DPWH-PMT) and Establishment of Office Pe

Guidelines and Procedures in the Receipt, Inspection, Acceptance, Issuance, Custody and Physical Inve
Defining the Roles andResponsibilities for BridgeInspections Type 1 {Routine}
and Type 2 {Condition}

50th Partial List of Initial Accreditation of DPWH Materials Engineers


51st Partial List of Initial Accreditation of DPWH Materials Engineers
Implementing of the Document Tracking System (DoTS) for the Procurement of Goods
DWPH Standard Specification for Item 1041 - Gypsum Board

DPWH Standard Specification for Item 740 - Structural Concrete Injection and Crack Repair
Reconstitution of the Complaints Validation and Investigation Committee (CVIC)
GUIDEUNES ON THE WEARING OFEMPLOYEE IDENTIFICATION (I.D.)CARDS
56th Upgrading Rank of Accredited Project Engineers and Inspectors
57th Partial List of Initial Accreditation of Project Engineers and Inspectors
Revised Guidelines Re: Project Reporting to Congressmen and Local Officials
Standard Specification on the Procurement of Office Furniture

Supplemental Guidelines to D.O. No. 43, series of 2011, Re: Guidelines in the Evaluation and Selection
Selection Criteria on the Evaluation of Applicants/Candidates for Appointment to Entry Level Positions

Revised Limits of Delegated Authority to Approve Program of Work (POW) and Approve Budget for the
Delegated Authority of District Engineers for School Building Projects
Supplemental Guidelines on Shoulder Paving along National Roads

Declaring the Marcos Alvarez Road from Zapote-Alabang Roas, Las Pias City to City Boundary of Las P
Amending the Procedures for the Calibration of Testing Equipment of the Regional and District Offices
Implementing of Document Tracking System (DoTS) for the Procurement of Goods
Creation of a Committee on Evaluation of Major Work Categories in the Civil Works Registry
Revised Policies And Procedures onthe Reimbursement of Expenses forMaintenance of Equipment and
limiting the total payment for progress billing
DPWH~QMS Controlof Documents
AMENDING GUIDELINES IN THEGRANTING! AVAILMENT OF STUDYLEAVE
adoption of precedence diagram method as project scheduling technique in dpwh projects
Wearing of Office Uniforms Schedule for CY 2015

Strict Compliance to Road Work Safety & Traffic Management and Construction Safety & Health Requir
SUSPENSION OF APPLICATION OFDOWELS ON CHAIRS ASPRESCRIBED IN D.O. 40, SERIES OF2014, PRE
CONSIDERATION FOR HISTORICAL SITESAND STRUCTURES IN THE PREPARATIONOF DESIGN PLANS AND
GUIDELINES ON RIVER DREDGINGOPERATIONS FOR FLOOD CONTROL
supplemental guidelines to do 43 s 2011. guidelines in the evaluation and selection of candidates for
Creation of Open Data Philippines(ODP) Committee
Implementation of the Document Tracking System (DoTS) for Civil Works Projects
Revised Guidelines on theImplementation of the IntegratedTime and Attendance System(ITAS) in the D
Standardization of Project Duration for Standard DPWH School Building Projects
GUIDELINES ON HOT WORKOPERATIONS (HWO) AND LOCKOUT/TAG-OUT (LOTO) PROCEDUREFOR LAN
Standard Forms of Program ofWorks (POW), Approved Budget forthe Contract (ABC) and Detailed Unit
CREATION OF PERFORMANCEBASED MAINTENANCE MONITORINGTEAMS (PBMMTs) TO ASSESSCOMPUA

REMARKS

PROJECTENGINEERS

STRUCTURE CONTRACTS
SIGN, AS-STAKED AND AS-BUILTPLANS

NT RENTALRATES DATA BASE

NG MINIMUMDESIGN STANDARD FOR PORTLANDCEMENT CONCRETE PAVEMENT(PCCP) IN ARTERIAL ANDSECOND


IONALCONSTRUCTION AFFECTING CULTURALHERITAGES

ment to excecute/managerial positions

entraJOffice

WATER BASEDEQUIPMENT
alysis (DUPA)
THE LEVELS OFMAINTENANCE SERVICE BYCONTRACTORS UNDER THELONG TERM PERFORMANCEBASEDMAINT

CCP) IN ARTERIAL ANDSECONDARY NATIONAL ROADS ANDACCESSROADS LEADING TO PORTS

M PERFORMANCEBASEDMAINTENANCE CONTRACTS(LTPBMC) NRIMP2 ROAD CLUSTERII

G TO PORTS

También podría gustarte