Edificaciones
Project Overview
1,000m
Project Development
Stacking Diagram
Structural System
No columns
No outriggers
No column transfers
No spandrel beams
Structural System
Spire Silo and Sky Raft
CN Tower
Burj Khalifa
Kingdom Tower
End Walls
- Tapered / variable width
-
Thickness:
Level Range
223 to 240
500
168 to 222
600
99 to 167
800
73 to 98
900
43 to 72
1000
20 to 42
1100
Base to 19
1200
Corridor Walls
- 36m long from the tips of the triangular core at
the base
- 520MPa vertical rebars form base to L60
Corridor Walls
(mm)
223 to 240
168 to 222
99 to 167
600
73 to 98
700
43 to 72
800
20 to 42
900
Base to 19
1000
Fin Walls
- 2 types: Corridor Fins + Triangular Fins
- Corridor Fins drop off
Wing A: 45, 87, 108
Triangular Fins
(mm)
Typical
TC, TJ, TR
223 to 240
168 to 222
99 to 167
600
600
73 to 98
650
600
600
43 to 72
650
600
600
20 to 42
750
700
700
Base to 19
850
800
800
Triangular Core
- Base to Skyraft
- 2m wide x 1m deep beams at the 3 vertices
- 1.8m deep coupling beams
Level Range
Triangular Core
(mm)
223 to 240
168 to 222
99 to 167
600
73 to 98
600
43 to 72
600
20 to 42
700
Base to 19
800
Corridor Walls
- Vertically stacked openings
75 MPa
11000 psi
Concrete (fc)
Cylinder
85 MPa
12500 psi
520 MPa
75 ksi
420 MPa
60 KSI
Vertical
Rebar
65 MPa
9500 psi
696 lb
76
lb
170 lb
1580 lb (Mecca)
1245 lb
235 lb
Polycarboxylate
Water/Cementitious Ratio
Density
0.25
149 pcf
Subgrade Conditions
50m
2m
2m
Competent
Coralline
Limestone
Siltstone
Gravel Layer
Moderate/
50-60m Weak
Sandstone
Hard Sandstone
Structural System
Piled Raft Foundations (270 Staggered Piles)
Draw-Down of Podium
Time = 47 Months
Site Seismicity
Saudi Building Code (SBC 301)
- Site Class B
- Seismic Design Category B
34.8
38.0
Actual
Wind Climate
( Dubai and
Jeddah)
Mode 1 - 11.9s
Mode 2 - 11.2s
Single Curvature
Translation
Single Curvature
Translation
Mode 3 5.8s
Single Curvature
Torsion
HFPI
12/23/2010
1:600 Model
Atmospheric
Boundary
Layer
- SBC 301 Code Design Wind Speed 21% Greater than ULWCA Model
ETABS/SAP2000
Acceleration Results
Highest Occupied Floor (Level 163: 654m)
Single Span
Multiple Span
Two-Panel Model
Constructability
Vertical Shortening
Kingdom Tower
Creep - UNLOADS
Staged (Midas)
At 10 Years
PreConstruction
Testing Program
Full Construction
Concrete Testing
Program
- Modulus
- Strength
- Creep
Surveying/Monitoring
Requirements
Reporting
Compensation
Instructions
- Vertical
- Horizontal
Assumed Sequence
of Construction
Size Effect?
Actual Scale vs. Testing Scale
FEM
WIND TUNNEL
BUILT
Groundbreaking
Thank You