Documentos de Académico
Documentos de Profesional
Documentos de Cultura
com
Outline
Company Overview
Facilities and Services
Business Process and Operation
Value Proposition
Infrastructure Development
Page 2
Corporate Overview
Owned and operated by PT. Cikarang Inland Port, a subsidiary
company of PT. Jababeka, Tbk on infrastructure business portfolio.
The First Inland Port in Indonesia with International Port Code and
appointed by Government as Integrated Customs Services Zone
(KPPT Kawasan Pelayanan Pabean Terpadu)
Page 3
62%
Page 4
Page 5
Railway:
Domestic
International
Page 6
Page 7
Bonded Trucking
Page 8
24/7 Security
Page 9
Page 10
Direct Shipment
Direct export import through Cikarang Dry Port are served by:
Page 11
PT Mustika
Alam Lestari
Terminal 3
Land
Transporter
(3)
Logistics
Service
Provider
(30+)
GAP Logistics
Page 12
PT PETA SEJATI
NIRMALA
Shipper
Consignee
(100+)
Page 13
Business Process
Flow Chart
CY- CDP
(IDJBK)
CY-Tanjung Priok
(IDJKT)
Shipper /
Consignee
Import Process
Multimodal B/L
B/L @ CDP
Place of Delivery
By Carrier
CIF/CNF
@IDJKT
CIF/CNF
@IDJBK
By Consignee / Forwarder
By Consignee / Forwarder
Export Process
Multimodal B/L
BL @ CDP
Place of Receipt
By Carrier
On Truck/Train
On Board
@IDJBK
By Shipper / Forwarder
Page 14
How to Start
For furtherPort
details
download
guidance at www.cikarangdryport.com
Integrated
andplease
Logistics
Facilitiestechnical
| www.cikarangdryport.com
Page 15
Tracking
Visit www.cikarangdryport.com and put B/L number to monitor the shipment
Import
Export
Page 16
Value Proposition
Certainty
Traceability
Managed bonded
transportation with
Electronic Seal for
better security &
monitoring
Reduced risk by
transfer responsibility
at CDP
Profitability
Better planning,
inventory reduction
and increasing
productivity
Storage start counting
at CDP (Multimodal
B/L)
Free time storage:
import 5 days ATA CDP,
export 7 days ETD
vessel
Page 17
40ft
20 ft
Handling
- Lift On / Lift Off
40ft
Handling
187,500
281,300
Storage
- Day 1 - 3
187,500
281,300
Free
Free
Storage
Free
Free
- Day 1 - 5
- Day 4 - 10
136,000
272,000
- Day 6 - 10
51,680
103,360
204,000
408,000
77,520
155,040
Penalty
Penalty
200%
Free
300%
Free
1,015,000
1,390,000
1,015,000
1,390,000
(*) Storage cost is 62% lower than Tanjung Priok Sea Port
(**) Port charges are settled in Cikarang Dry Port instead of Tanjung Priok Sea Port
Page 18
50
16000000,0
40
11000000,0
30
20
10
0
6000000,0
1000000,0
(4000000,0)
40
16000000,0
11000000,0
30
20
10
0
6000000,0
1000000,0
(4000000,0)
Page 19
6 days
In Cooperation With
Service First
Customers Satisfaction is Our Priority
Fastest Transit Time in The Market
Integrated Port and Logistics Facilities | www.cikarangdryport.com
Page 20
Infrastructure Development
Railway
CDP
Exit toll
km 24
Exit toll
Km 29
Exit toll
km 31
Legend :
New Toll Exit Road (km 29,2 and 34,7)
New Industrial Estate Connecting Road
Existing Industrial Est Connecting Road
Existing road
Integrated
Port and Logistics Facilities | www.cikarangdryport.com
3
Exit toll
km 34.7
21
From Jakarta
Integrated Port and Logistics Facilities | www.cikarangdryport.com
Page 22
Page 23
Contact Us
marketing@cikarangdryport.com
@CikarangDryPort