Está en la página 1de 3

Failure modes and effects analysis (FMEA)

QUAD TORC

Project:

FMEA Team:

METAL HEADS -20150195

Date:

27/02/2015

Prepared by:

THOMAS J NEREVEETTIL

SEV = How severe is effect on the customer?


OCC = How frequent is the cause likely to occur?
DET = How probable is detection of cause?
RPN = Risk priority number in order to rank concerns; calculated as SEV x OCC x DET

Process step

Potential failure mode

Potential failure effects

S
E
V

Potential causes

Current process controls

D
E
T

R
P
N

Actions
recommended

Responsibility (target
date)

N
e
w

N
e
w

N
e
w

N
e
w

S
E
V

O
C
C

D
E
T

R
P
N

Actions taken

10

What are the existing controls that


either prevent the failure mode
from occurring or detect it should it
occur?

10

1000

What are the actions


for reducing the
occurrence of the
cause or for improving
its detection? You
should provide actions
on all high RPNs and
on severity ratings of 9
or 10.

fuel tank leak / unproper filling /


low fuel efficiency / rong fuel
gauge

fuel gauge

64

proper filling / working


fuel gauge

improper maintanance of pump

none

320

Sen jacob John , will be


proper cleaning and
cleaned the pump and
completed by
maintainance of pump
filteres
26/04/2015

12

total electrical system failure

improper maintanance of battery


and terminals

anti corrosion spray ,cleaning

20

proper maintainance

Kevin Eldho Issac ,will


be completed by
25/04/2015

maintainance done

cannot start the engine

improper maintanance of
motor / defetive

maintainance

63

proper maintainance

Sen jacob John , will be


completed by
maintainance done
26/04/2015

In what ways can the step


What is the step?
go wrong?

What is the impact on the


customer if the failure mode is
not prevented or corrected?

10

What causes the step to go


wrong? (i.e., How could the
failure mode occur?)

fuel

empty tank

unable to reach the


destination / penality / time
loss

fuel pump

mechanical failure

unable to reach the


destination / penality / time
loss

battey

corroded

starter motor

mechanical failure

293107043.xlsx

O
C
C

Printed 13:25:45,10/31/2015

Who is responsible for


the recommended
action? What date
should it be completed
by?

What were the actions


implemented? Include
completion month/year
(then recalculate resulting
RPN).

10

10

10

1000

Thomas J N , ill be
completed by
25/04/2015

working fuel gauge / stop


the leakage

Page 1 of 3

Failure modes and effects analysis (FMEA)


QUAD TORC

Project:

FMEA Team:

METAL HEADS -20150195

Date:

27/02/2015

Prepared by:

THOMAS J NEREVEETTIL

SEV = How severe is effect on the customer?


OCC = How frequent is the cause likely to occur?
DET = How probable is detection of cause?
RPN = Risk priority number in order to rank concerns; calculated as SEV x OCC x DET

Process step

Potential failure mode

Potential failure effects

S
E
V

Potential causes

O
C
C

Current process controls

D
E
T

R
P
N

Actions
recommended

switch

fail to operate

fail to provide adequate power


unable to start the engine and
other electronic systems

manufacturiing defect / improper


installation

ingnition switch

chassis

bend / mechanical failure

instability / danger to the driver

10

improper welding / material


/design

impact testing / simulation and


analysis

suspension

broken / unepected
damping / mechanical
failure

instability / danger to the driver


/ uncomfortable

10

improper designing and


installation / wrong suspenson

lotus suspension analysis

steering

locking / mechanical failure instability /danger to Driver

improper designing and


installation

testing and simuation

battey

short circuit

inproper insulation / overloading

fuse / relay

fire / total electrical system


failure

N
e
w

N
e
w

N
e
w

S
E
V

O
C
C

D
E
T

R
P
N

Actions taken

replacement /
maintainance

Thomas J N , will be
completed by
27/04/2015

maintainance done /
replaced

120

proper designing and


testing

Thomas J N , will be
completed by
27/04/2015

tested the design


,simulated and analyzed
the problem ,made
necessary changes

12

60

proper designing and


testing

Nikhil C Nandhan , will


be completed by
27/04/2015

tested the design


,simulated and analyzed
the problem ,made
necessary changes

48

proper designing and


testing

Toby Tony , will be


completed by
28/04/2015

tested the design


,simulated and analyzed
the problem ,made
necessary changes

proper insulation with Abhay , should be


right rated fuse / reduce completed by
overloading
20/03/2015

proper insulaton was


given , rated fuses were
installed
1

293107043.xlsx

Responsibility (target
date)

N
e
w

Printed 13:25:45,10/31/2015

54

Page 2 of 3