APPENDIX E
CONTRACTOR RESOURCES
APPENDIX E
GENERAL NOTE
APPENDIX E
CONTRACTOR RESOURCES
INDEX TO ANNEXURES
Annexure 1
Annexure 2
Annexure 3
CONTRACTOR PERSONNEL
Annexure 4
Annexure 5
SUBCONTRACTORs
Annexure 6
Suppliers
Annexure 7
Annexure 8
Annexure 9
QA/QC Procedures
Annexure 10 -
Annexure 11 -
Annexure 12 -
Annexure 13 -
APPENDIX E
CONTRACTOR enters below brief company particulars. QP reserves the right to visit
CONTRACTORs business premises to verify any of the information provided in order to
ascertain CONTRACTORs capability of carrying out the WORK.
1.
Name of CONTRACTOR:
2.
Company Owner/Sponsor:
(along with copy of their ID cards)
3.
Business Address/Location:
4.
Telephone No.:
5.
Telefax No.:
6.
Contact Person:
7.
8.
9.
10.
APPENDIX E
11.
12.
13.
Bankers in Qatar:
14.
Auditors in Qatar:
15.
Insurance Company:
16.
Hard copy of the audited Financial Statements to be submitted for last three (03)
years prepared in accordance with the International Accounting Standards that
include the Balance Sheet, Statement of Income, Statement of Cash Flow,
Statement of Changes in Equity and Notes to Financial Statement. The accounts
should be applicable to the actual Tenderer or Tenderers forming any joint
venture or similar
17.
Fixed Assets:
18.
Net Assets:
19.
Net Income:
20.
APPENDIX E
21.
Personnel Details
Management and Administration:
Qualified Engineers:
(Segregated by discipline together with a copy of
Qatari Engineering Registration)
Technicians:
(Segregated by discipline)
Quantity Surveyors/Estimators:
22.
Number
APPENDIX E
Pursuant to IT.16 certified translated proof in the English language of all required
registration (or exemptions as the case may be) with and/or from the appropriate
relevant Qatar State Authorities must accompany copies of the original documentation in
Arabic and appended as part of this Annexure 2 to this Appendix E.
APPENDIX E
A)
CONTRACTOR REPRESENTATIVE
None of CONTRACTOR PERSONNEL listed here shall be removed or relocated
from the positions indicated or replaced without the prior written approval of QP.
Personnel removed shall be immediately replaced with new personnel who, in the
sole opinion of QP are of, at least, an equivalent standard as the personnel
removed. CONTRACTOR REPRESENTATIVE shall be a qualified Engineer with a
minimum of ten (10) years relevant experience. CVs shall be provided for all
nominated CONTRACTOR PERSONNEL. CVs shall identify the age, qualifications,
present position/length of tenure and previous experience of each nominee.
CONTRACTOR REPRESENTATIVE shall be:
:
Position :
Name
Position
Address
Fax No
Telephone :
B)
(a)
(b)
Nationality
Qualifications :
APPENDIX E
C)
D)
Nationality
Qualification :
This Annexure also includes CVs for all those persons of key positions required to
be filled under the CONTRACT.
All CONTRACTOR PERSONNEL must have the prior approval of QP before being
engaged in the WORK.
The period the personnel have been employed by CONTRACTOR shall be given.
This Annexure should include details of qualification, experience and CV of the
proposed Project Manager.
Specific mention shall be made in this Annexure of CONTRACTOR PERSONNEL
who shall be responsible for safety related matters.
Minimum Qualification Required for CONTRACTOR PERSONNEL
The following are the minimum qualification and experience required for the
CONTRACTOR PERSONNEL to be engaged in the SERVICES.
Project Engineer/Manager
Ten (10) years relevant experience out of which seven (07) years should be in
Project Management. B.Sc. (Engineering) qualification or equivalent.
Lead Discipline Engineers
Ten (10) years relevant discipline experience, out of which at least seven (07) years
should be in the respective discipline, or related to that discipline. B.Sc. qualification
or equal in an appropriate engineering subject. Past experience on similar contracts
is required.
Senior Discipline Engineers
Eight (08) years relevant discipline experience, out of which at least five (05) years
should be in the respective discipline, or related to that discipline. B.Sc. qualification
or equal in an appropriate engineering subject. Past experience on similar contracts
is required.
APPENDIX E
Planning Engineer
Minimum seven (07) years of experience in project planning, scheduling,
coordinating, reporting and the like of similar nature of project with engineering
qualification.
Senior Designers for all disciplines
Eight (08) years experience in relevant facility design including five (05) years CAD
experience should be in HND/B.Sc. (Engineering) qualification or equivalent.
Draughtsman
Five (05) years experience including two (02) years on CAD should be in
ONC/Draughtsman qualification or equivalent.
APPENDIX E
CONTRACTOR states below the details of its resources and facilities intended to be
utilised for this CONTRACT. CONTRACTOR design office, design facilities, expediting
and procurement agencies, fabrication yard (location and facilities) etc. are listed.
CONTRACTOR states below the details of the main items of constructional plant and
equipment, which it proposes to use for this CONTRACT. Details of all equipments etc.
are specified. This list is the minimum that CONTRACTOR will be required to provide on
WORKSITE. CONTRACTOR states whether the tool or equipment is already in
CONTRACTOR ownership or will be purchased or hired. Details of any special tools
should be highlighted.
Description
Capacity and
present
whereabouts
Manufacturer
and year of
manufacture
No. of units
Valid Test
Certificate
attached
(YES/NO)
______________________________________________________________________
The provision of this information shall not relieve CONTRACTOR from providing such
information as QP may require in accordance with the General Conditions of Contract of
the special equipment and tools CONTRACTOR proposes to supply or use, neither shall
it in any way relieve CONTRACTOR of any of its obligations to carry out, and, complete
the WORK in accordance with the CONTRACT.
______________________________________________________________________
APPENDIX E
ANNEXURE 5 SUBCONTRACTORS
CONTRACTOR states below the names and addresses of all SUBCONTRACTORs from
whom it proposes to obtain work or services.
CONTRACTOR is not permitted to change any SUBCONTRACTOR(s) named in this list
without first obtaining QP written authority.
SUBCONTRACTORs are also required to submit details under each schedule of this
Appendix E along with details of relevant experience and shall be bound separately for
each SUBCONTRACTOR.
Acceptance of the Tender as a whole will not imply approval of any SUBCONTRACTOR
listed below. Full technical submissions will be required regarding all work and services
proposed to be subcontracted along with details of relevant experience as stipulated in
the General Conditions of Contract and the Specifications.
Full technical submissions are required for all services rendered under the CONTRACT
as required by the General Conditions of Contract and the Specifications.
WORK to be
Performed
SUBCONTRACTORs
REPRESENTATIVE
APPENDIX E
ANNEXURE 6 SUPPLIERS
CONTRACTOR states below the names and addresses of all suppliers and vendors
from whom it proposes to procure goods.
CONTRACTOR is not permitted to change any supplier named in this list without first
obtaining QP written authority.
Acceptance of the Tender as a whole will not imply approval of any supplier listed below.
Full technical submissions will be required for all materials to be supplied either by
CONTRACTOR or supplier, as stipulated in the General Conditions of Contract and
Specifications.
Full technical submissions are required for all goods procured under the CONTRACT as
required by the General Conditions of Contract and the Specifications.
Supplier
Goods to be supplied
APPENDIX E
CONTRACTOR inserts a copy of its organisation chart which clearly shows the
Company structure with respect to Subsidiaries and Joint Venture Partners, if applicable.
The Organigram indicates positions of Company Directors, Managers, Partners and the
like.
APPENDIX E
CONTRACTOR provides the proposed organisation chart for this CONTRACT (including
key CONTRACTOR and SUBCONTRACTOR personnel, where applicable, and the
person responsible for QA/QCand safety matters and the like) and indicate the line of
reporting to QP personnel. Inspection activities and expediting efforts shall be
segregated from each other with separate CONTRACTOR PERSONNEL. The CVs of all
the personnel identified under this Annexure shall be submitted under Annexure 1.
APPENDIX E
CONTRACTORs Quality Assurance and Control System dedicated for this CONTRACT is
APPENDIX E
Material/Equipment
National Products and
Products of National Origin
Source
Quantity intended to be
used
APPENDIX E
CONTRACTOR provides a list of customers for whom it has carried out or still carrying
out similar works to this CONTRACT, with contact name and address, completion date
and value.
SI. No.
Name of Project
Name of Client
with Contact
Persons Name
Value of Project
Scheduled or
Completion
Date
APPENDIX E
APPENDIX E