Documentos de Académico
Documentos de Profesional
Documentos de Cultura
VerDate Aug<31>2005 18:27 Oct 06, 2005 Jkt 208001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\07OCN1.SGM 07OCN1
Federal Register / Vol. 70, No. 194 / Friday, October 7, 2005 / Notices 58699
Washington, Windham and Windsor preferred alternative because of EIS No. 20050402, Final EIS, FHW, UT,
Counties, VT. potential adverse impacts to source Iron County Transportation Corridors,
Summary: EPA has no objections to water, streams and water quality, Construction from Station Road 56 to
the proposed project, but supports wetlands and aquatic resources. EPA Exit 51 on Interstate 15, Funding and
alternatives C, D or E as those that best supports the transition from unmanaged Right-of-Way Grant, Southwest of the
address resource protection. motorized recreation to restricted travel Cedar City Limits, Iron County, UT,
and suggests the final EIS include Wait Period Ends: 11/07/2005,
Rating LO specific analyses of the direct, indirect Contact: Gregory S. Punske 801–963–
EIS No. 20050226, ERP No. D–FHW– and cumulative impacts of this 0182.
B40095–RI, U.S. Route 6/Route 10 proposed plan. EIS No. 20050403, Final EIS, AFS, CA,
Interchange Improvement Project, To Watdog Project, Proposes to Reduce
Identify Transportation Alternative, Rating EC2 Fire Hazards, Harvest Trees, Using
Funding, City of Providence, EIS No. 20050240, ERP No. DS–FTA– Group Selection Methods, Feather
Providence County, RI. B54007–WA, Silver Line Phase III River Ranger District, Plumas
Summary: EPA has environmental (previously known as South Boston National Forest, Butte and Plumas
concerns about the impacts to water and Pier) Project, Updated Information to Counties, CA, Wait Period Ends: 11/
air quality as well as environmental Physically Integrate Silver Line Phase 07/2005, Contact: Susan Joyce 530–
justice issues. I and II, Massachusetts Bay 532–6500.
Transportation Authority’s, Funding, EIS No. 20050404, Draft EIS, DOI, OH,
Rating EC2 MA. First Ladies National Historic Site
EIS No. 20050247, ERP No. D–SFW– Summary: EPA has no objections to General Management Plan,
K64025–AZ, Cabeza Prieta National the proposed project. Implementation, Canton, OH,
Wildlife Refuge, Comprehensive Comment Period Ends: 11/30/2005,
Conservation Plan, Wilderness Rating LO Contact: Nick Chevance 402–661–
Stewardship Plan, Implementation, Final EISs 1844.
Ajo, AZ. EIS No. 20050405, Draft EIS, NPS, NV,
EIS No. 20050341, ERP No. F–COE– Clean Water Coalition Systems
Summary: EPA has no objection to the G32058–00, Arkansas River
proposed project. Conveyance and Operations Program,
Navigation Study, To Maintain and Construction, Operation and
Rating LO Improve the Navigation Channel in Maintenance, City of Las Vegas, City
EIS No. 20050256, ERP No. D–AFS– Order to Enhance Commercial County, NV, Comment Period Ends:
J65446–MT, Beaverhead-Deerlodge Navigation on the McCellan Kerr 12/06/2005, Contact: Michael Boyles
National Forest Draft Revised Land Arkansa River Navigation System 702–293–8978.
and Resource Management Plan, (MKARNS), Several Counties, AR and EIS No. 20050406, Draft EIS, FHW, WA,
Implementation, Beaverhead, Butte- Several Counties, OK. South Park Bridge Project, Proposes to
Silver Bow, Deerlodge, Granite, Summary: No formal comment letter Rehabilitate or Replace the Historic
Jefferson, Madison Counties, MT. was sent to the preparing agency. South Park Ridge over the Duwamish
Summary: EPA generally supports the Dated: October 4, 2005. Waterway at 14th/16 Avenue S, U.S.
forestwide aquatic strategy, watershed Robert W. Hargrove, Coast Guard Permit and U.S. Army
restoration and revised management Director, NEPA Compliance Division, Office COE Section 10 and 404 Permits, King
practices. However, EPA expressed of Federal Activities. County, WA, Comment Period Ends: ,
environmental concerns about [FR Doc. 05–20207 Filed 10–6–05; 8:45 am] 11/21/2005, Contact: Jim Leonard
continued impacts to water quality, the BILLING CODE 6560–50–U
360–753–9408.
level of watershed protection and EIS No. 20050407, Final EIS, NPS, AZ,
restoration, management direction for Saguaro National Park Fire
roads and other resources, and ENVIRONMENTAL PROTECTION Management Plan, Implementation,
environmental protection management AGENCY Tucson, AZ, Wait Period Ends: 11/07/
measures. 2005, Contact: Sarah Craighead 520–
[ER–FRL–6668–1] 733–5101.
Rating EC2 EIS No. 20050408, Final EIS, FHW, WI,
EIS No. 20050301, ERP No. D–FAA– Environmental Impacts Statements; US 41 Highway Corridor Project,
A12043–00, PROGRAMMATIC— Notice of Availability Transportation Improvement between
Horizontal Launch and Reentry of Responsible Agency: Office of Federal the Cities of Oconto and Perhtigo,
Reentry Vehicles, Facilitate the Activities, General Information (202) Funding, Marinette and Oconto
Issuance of Licenses in United States. 564–7167 or http://www.epa.gov/ Counties, WI, Wait Period Ends: 11/
Summary: EPA has no objection to the compliance/nepa/. 07/2005, Contact: Johhny Gerbitz
proposed action. Weekly receipt of Environmental Impact 608–829–7500.
Statements EIS No. 20050409, Final EIS, AFS, OR,
Rating LO
Filed 09/26/2005 Through 09/30/2005 Joseph Creek Rangeland Analysis
EIS No. 20050315, ERP No. D–AFS– Pursuant to 40 CFR 1506.9. Project, Proposal to Allocate Forage
J65449–UT, Fishlake National Forest EIS No. 20050401, Draft Supplement, for Commercial Livestock Grazing on
Off-Highway Vehicle Route SFW, CA, Southern Sea Otters Eleven Allotment, Wallowa-Whitman
Designation Project, Proposes to (Enhydra lutris nereis) Translocation National Forests, Wallowa Valley
Designate a System of Motorized Program, New and Updated Ranger District, Wallowa County, OR,
Road, Trails, and Areas to Revise and Information, San Nicolas Island, Wait Period Ends: 11/07/2005,
Update the Existing Motorized Travel Southern California Bight, CA, Contact: Alicia Glassford 541–426–
Plan, UT. Comment Period Ends: 01/05/2006, 5689.
Summary: EPA expressed Contact: Greg Sander 805–644–1766 EIS No. 20050411, Draft EIS, IBR, CA,
environmental concerns about the Ext. 315. Central Valley Project, West San
VerDate Aug<31>2005 18:27 Oct 06, 2005 Jkt 208001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\07OCN1.SGM 07OCN1