United Engineers ( Singapore ) Pte. Ltd.

257 Jalan Ahmad Ibrahim


Singapore 629147
Tel: +6562660988
Fax: +6562686993

CONTENTS:

1. Scope of works
2. Project organization for Health & Safety Control
3. Health & Safety Risk and Control
4. Access / Egress
5. Lighting
6. Plant & Equipment
7. Personnel Training Certificate
8. Hazardous Materials & Substances
9. Waste Management
10. Special Control Measures
11. Appendixes
Appendixes
Appendix 1: Checklist for Earthing Installation
Appendix 2: Project Organization for Health & Safety control
Appendix 3: Risk Assessment
Appendix 4: Personnel Training Certificate

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

1. Scope of Works
Scope of Activities
This scope defines the minimum standards to be adopted when installing Earthing in
surfaced concrete/brick wall according to construction co-ordination drawings. The
Electrical Earthing system shall be installed both vertically and horizontally along the
routes shown on the drawings, and shall form the network bonding all switchboards,
control panels, distribution boards, all exposed conductive parts and extraneous
conductive parts to the buildings main earth bar.
Site Procedure
Site mobilization shall be done with real time monitoring the conditions & progress of
builder works. Before commencement of the work, carry out examination of the
physical condition of the area. Photographs should be taken where necessary, prior
to commencement and during works.

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

Method Statement
I.

Preparation stage
a. The principle components of a conventional structural lightning protection
system are
1. Down Conductors
2. Bonding
b. Specification allows the use of 'natural conductors' such as rebars and
structural steelwork, provided that they are electrically continuous and
adequately earthed.
c. Prior to install lightning protection system examine paths to ensure all
areas free of debris that may interfere with the installation.
d. Inventory all items immediately after unloading, using manufactures
packing list.
e. All the related material should be stored away from high traffic areas.

1. Testing & Commissioning stage


a. Site survey of the proposed Earthing routing based on approved CSD by
foreman / sub-contractor together with Engineer.
b. Installation must be carried out based on approved shop drawings & samples
by foreman / sub-contractor.
c. Earthing system is tested in accordance with current regulations and
standards.
d. Test results are documented in accordance with current regulations and
standards and company requirements.
e. Testing confirms that all requirements of current regulations and standards

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

have been met, and that the earthing system is safe to connect.
f. A certificate of compliance is completed by a registered Licensed Electrical
Worker in accordance with regulations.
g. After Testing & Commissioning of Earthing Installations, Engineer-in-charge
shall check the complete works and complete the Inspection checklist for T&C
of earthing installation works. ( See annex. 1 )
h. Engineer-in-charge shall arrange and request for inspection with the Owners
representative M&E clerks of works (COW) using approved Main con
Request for Inspection (RIN) form. ( See annex.2 )
2. Preferred Materials
N.A

3. Project organization for Health & Safety Control


(See annex. 3)
4. Health & Safety risks and controls
(Please refer to attach Risk assessment in respect to above scope of works Annex.4)

5. Access / Egress
Proper step ladders shall be provided for access and egress into Distribution board as
applicable.

6. Lighting
Adequate temporary/task lighting shall be provided if work to be carried at night or at dark
places.

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

7. Plant & Equipment


S/N

Description

Unit

Metal cutting saw

1 lot

Square

1 lot

Hammer

1 lot

Electrical drill (only for surface installation works)

1 lot

Diagonal-Cutting Pliers

1 lot

File

1 lot

Tape measure

1 lot

Level

1lot

Shank Screwdriver
P.P.E. Personal Protective Equipment (safety helmet, Boots,

1 lot

10

gloves & safety vest )

1 set per worker

*The above machinery & Equipment used quantity will be varied depending on site conditions
and production rate.

8. Waste management
The Rubbish which would be created from our scope of works will be disposed to the
designated dumping ground.

9. Special Control measures


The following general control measures against Safety, Environment and Quality shall be
required for our scope of work and special control measures are not applicable for us

Proper PPE must be worn at all time

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

ANNEX 1:
Inspection Checklist
for Earthing
Installation

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

ANNEX 2 :
Request for Inspection

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

ANNEX 3:
Project Organisation
for Health & Safety
Control

United Engineers ( Singapore ) Pte. Ltd.


257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993

ANNEX 4:
Risk Assessment