Está en la página 1de 1

72808 Federal Register / Vol. 70, No.

234 / Wednesday, December 7, 2005 / Notices

FERCOnlineSupport@ferc.gov, or call The application is on file with the comments in support of or in opposition
(866) 208–3676 (toll free). For TTY, call Commission and open to public to this project. The Commission will
(202) 502–8659. inspection. This filing is available for consider these comments in
review at the Commission in the Public determining the appropriate action to be
Magalie R. Salas,
Reference Room or may be viewed on taken, but the filing of a comment alone
Secretary. the Commission’s Web site at http:// will not serve to make the filer a party
[FR Doc. E5–6943 Filed 12–6–05; 8:45 am] www.ferc.gov using the ‘‘eLibrary’’ link. to the proceeding. The Commission’s
BILLING CODE 6717–01–P Enter the docket number excluding the rules require that persons filing
last three digits in the docket number comments in opposition to this project
field to access the document. For provide copies of their protests only to
DEPARTMENT OF ENERGY assistance, please contact FERC Online the party or parties directly involved in
Support at the protest.
Federal Energy Regulatory FERCOnlineSupport@ferc.gov or toll Persons may also wish to comment
Commission free at (866) 208–3676, or for TTY, further only on the environmental
contact (202) 502–8659. review of this project. Environmental
[Docket Nos. CP06–5–000; CP06–6–000; Any questions regarding this commenters will be placed on the
CP06–7–000] application should be directed to David Commission’s environmental mailing
W. Reitz, Attorney for the Applicants, list, will receive copies of
Empire State Pipeline, Empire Pipeline, 6363 Main Street, Williamsville, New
Inc.; Notice of Application environmental documents issued by the
York 14221; phone (719) 857–7949 or Commission, and will be notified of
November 30, 2005. reitzd@natfuel.com. meetings associated with the
On September 21, 2004 the Commission’s environmental review
Take notice that on October 11, 2005,
Commission staff granted the process. Those persons, organizations,
Empire State Pipeline (Empire State),
Applicants’ request to utilize the and agencies who submitted comments
and Empire Pipeline, Inc.
National Environmental Policy Act during the NEPA Pre-Filing Process in
(EPI)(collectively, Applicants), 6363
(NEPA) Pre-Filing Process and assigned Docket No. PF04–16–000 are already on
Main Street, Williamsville, New York
Docket No. PF04–16–000 to staff the Commission staff’s environmental
14221, filed with the Federal Energy activities involving the Empire
Regulatory Commission (Commission) mailing list for the proceeding in the
Connector Project. Now, as of the filing above dockets and may file additional
an application under section 7(c) of the of this application on October 11, 2005,
Natural Gas Act and parts 157 and 284 comments on or before the below listed
the NEPA Pre-Filing Process for this comment date. Environmental
of the Commission’s regulations for: (1) project has ended. From this time
A certificate of public convenience and commenters will not be required to
forward, this proceeding will be serve copies of filed documents on all
necessity authorizing the construction, conducted in Docket Nos. CP06–5–000,
ownership, and operation of existing other parties. However, environmental
et. al, as noted in the caption of this commenters are also not parties to the
and new interstate natural gas pipeline, Notice.
compression and other facilities; (2) a proceeding and will not receive copies
There are two ways to become
blanket certificate to provide open- of all documents filed by other parties
involved in the Commission’s review of
access firm and interruptible or non-environmental documents issued
this project. First, any person wishing to
transportation services; and (3) a blanket by the Commission. Further, they will
obtain legal status by becoming a party
certificate to construct, operate, and/or to the proceedings for this project not have the right to seek court review
abandon certain eligible facilities, and should, on or before the comment date of any final order by Commission in this
services related thereto. Empire also listed below, file with the Federal proceeding.
requests authorization of the initial rates The Commission strongly encourages
Energy Regulatory Commission, 888
for transportation service and terms and First Street, NE., Washington, DC 20426, electronic filings of comments, protests,
conditions of service proposed in the a motion to intervene in accordance and interventions via the Internet in lieu
pro forma tariff. with the requirements of the of paper. See 18 CFR 385.2001(a)(1)(iii)
Empire State’s existing facilities Commission’s Rules of Practice and and the instructions on the
consist of an approximately 157-mile Procedure (18 CFR 385.214 or 385.211) Commission’s Web site (http://
natural gas pipeline running from the and the Regulations under the NGA (18 www.ferc.gov) under the ‘‘e-Filing’’ link.
U.S./Canada border near Buffalo, New CFR 157.10). A person obtaining party Comment Date: January 17, 2006.
York to near Syracuse, New York, and status will be placed on the service list Magalie R. Salas,
are currently subject to state maintained by the Secretary of the Secretary.
jurisdiction. In the Empire Connector Commission and will receive copies of [FR Doc. E5–6959 Filed 12–6–05; 8:45 am]
Project, the Applicants propose to all documents filed by the applicant and BILLING CODE 6717–01–P
expand and extend the existing Empire by all other parties. A party must submit
State pipeline from Victor, New York, to 14 copies of this filing and all
a proposed interconnection with the subsequent filings made with the DEPARTMENT OF ENERGY
facilities of Millennium Pipeline Commission and must mail a copy of all
Company, L.P. in Corning, New York. filing to the applicant and to every other Federal Energy Regulatory
The expansion facilities will consist of party in the proceeding. Only parties to Commission
approximately 78 miles of 24-inch the proceeding can ask for court review
[Docket No. RP06–108–000]
diameter pipeline, 20,620 horsepower of Commission orders in the proceeding.
compressor station, and associated However, other persons do not have Enbridge Pipelines (KPC); Notice of
facilities. The Applicants state the to intervene in order to have comments Proposed Changes in FERC Gas Tariff
proposed facilities will have a design considered. The second way to
capacity of 250,000 Dth/day in the participate is by filing with the November 29, 2005.
winter and 221,000 Dth/day in the Secretary of the Commission, as soon as Take notice that on November 23,
summer. possible, an original and two copies of 2005, Enbridge Pipelines (KPC)

VerDate Aug<31>2005 13:01 Dec 06, 2005 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\07DEN1.SGM 07DEN1

También podría gustarte