Está en la página 1de 3

CURRICULUM VITAE

ISHTIAQ AHMED
Tel. No:

Mobile: 0092-321-5715429, Home Tel No: 0092-572-613002

E-Mail Address: ishtiaqahmed46@yahoo.com


Permanent Address: Teen Mila Chowk Kamra Road Attock City -Pakistan
Nationality: Pakistani

D.O. Birth: 05-04-1976

QUALIFICATION:
Bachelor of Technology (Honours) Electrical - (Secured 3.2/4 CGPA): from PRESTON
UNIVERSITY, Islamabad Campus Pakistan
Diploma of Associate Engineer Electrical Technology (Aggregate Secured 71%):
Punjab Board of Technical Education, Lahore- Pakistan

MS Office (Word/Excel/Power Point)

Professional Training in Installation and Maintenance of power distribution lines


(Transformer /HT / LT ) from Regional Training Centre IESCO Islamabad

SKILLS:
Supervision of HV/LV Sub Station & Distribution Lines.
Able to read single line drawing / diagram

Preparation of proposal for 11 KV overloaded Feeder and Distribution Transformer

Operation & Maintenance of HV/LV Sub Station & Distribution Lines.

Installation of Transformer and Distribution lines 11 KV /0.415 KV

Testing and commissioning of HV/LV Sub Station

Conduct safety meeting with his crew and compliance with approved safety practices

Design Review of HV/LV Sub Station.

Management of staff - HV/LV Sub Station & Distribution Lines ,construction, operation & maintenance
EXPERIENCE:
Islamabad Electric Supply Company - Pakistan: I started my Career as
Assistant Engineer Operation & Maintenance (10-01-2008 to till now), Design and Installation of Feeder,
up-gradation/modification of existing system including Review of Base design, Detail Design and As Built
Drawings. My responsibilities also include inspection of installation activities, erection of electrical
equipment, Testing and Commissioning of HV/LV equipment at 11/0.415 KV Sub Stations including
power transformers, circuit breakers, CTs, PTs, all type of relays and protection Schemes, 11KV Panel
Installation,. Coordination between Civil, Electrical, Mechanical works, monitoring safety and quality,
coordinating meetings, issuing site instruction to Sub-contractor.

Page 1 of 3

CURRICULUM VITAE
I also got the experience of Construction, Maintenance/Fault tracing, Installation, Inspection & Testing
and staff management of HV/LV Equipment at 11KV Feeders and 380/220V power distribution lines
including 200/150/100KVA Distribution power transformers at Hattian sub-Division Office, ATTOCK (IESCO ISLAMABAD)
COMPANY PROFILE: IESCO is one of the Best Distribution Company.
Islamabad Electric Supply Company (IESCO) provide the services for Maintenance of the existing
Power system and construction of new Transmission & Distribution Power lines and substations
under Water and Power Development Authority (WAPDA) Pakistan

ISLAMABAD ELECTRIC SUPPLY COMPANY IESCO PAKISTAN


Assistant Engineer Electrical (Operation and maintenance)
From 10-01-2008 TO DATE
1- Management:
Working as Assistant Engineer for all matters related to construction quality
assurance of electrical works at 11kV & 415V Distribution line and Transformer.
1. Assist to plan & design new and reinforcement network of T/F and
overhead lines
2. Monitor and control interconnected distribution network ensuring
safe and reliable delivery of electrical power
3. To collect/keep the record of all documents for the projects
4. Monitoring the electrical works for conformance with the provisions
of the Contract Documents and the Procedures manual
5. Coordinate and supervise the work of all electrical activities
(material approval, delivery, installation and proper operation after
energization
6. Receive/action Request for Inspection (RFI) that apply to electrical
& mechanical works.
7. Review Sub-contractors' claims related to construction works.
Assist in negotiations with Sub-contractors regarding the value of
claims or changes in schedules.
8. Supervise all activities of the on-going projects, monitor the
progress and adopt various measures to enhance it.
9. Prepare the monthly report for presentation to management which
includes the Design, material procurement & construction
installation etc.
10. To ensure the work is executed as per standard operating
procedure and with safety regulation as per client requirements.
11. Preparing & submission of invoice
12. Coordinate with higher/various offices to discuss/resolve the
problems faced during the execution of work.
It also includes the management (Transfer, salaries, medical, disciplinary
actions etc.) for staff.
2- Procurement:
1. Get the allocation of material according to the requirements of project
etc.
2. Arrange the shifting of material from warehouses to the work site.
3. Arrange the material for any modification during the execution of project.
4. Arrange the test equipment necessary for the testing of T/F.

Page 2 of 3

CURRICULUM VITAE
5. Arrange the skilled staff, machinery, tools and plants.
3- Technical:
1. Repair & Maintenance of Power LV and HV Transmission Lines and
Power distribution transformers (50KVA, 100KVA & 200KVA) in IESCO
(WAPDA).
2. Supervised the Installation and Monthly Reading of Max: Demand
Indicator (MDI) Meters.
3. Estimation, Costing & Purchase order, Work Orders.
4. Coordinating with Consumers & Making Bill of Materials, Finalizing the
Orders.
5. Preparation of Removed/dismantled material report.
6. Purchase & Procurement of Various Electrical materials.
7. Prepared the Safety Management Programs for Office Working Staff,
(Safety Precautions for Working on Energize & De-energize System).
8. Coordination and follow up for approval of critical outages involved
during line faults.
9. Preparation & submission of Operation and Maintenance manual & Test
Record books as per WAPDA requirement.
10. Conducting coordination meeting with internal departments to resolve
the disputed issues.
11. TTR Test, Insulation Resistance Test (Megger Test), Oil DES Test.
12. We can find the accuracy of HT/LT Insulators by performing the short
circuit test of HV/LV Insulators.
13. Issuing the work permit during line faults/Maintenance.
14. Installation of KWH Meters/ capacitors/Lighting Arresters.
15. Laying /Installation of 11KV power cables and Overhead Conductors &
Power distribution Transformers.

Project completed:
1- Bifurcation and Reconductoring of 11KV Hazro Feeder
(For Reduction of line losses)
Diagram: prepare single line diagram and Base Map of 11KV existing feeder which is connected
from 132KV substation (Faqirabad) and then Prepare sketch of 11 Kilo-meter new line to connect
the feeder for bifurcation and 4 kilo-meter reconductoring of the existing feeder
Estimate: To prepare estimate for Material requirement and obtain the approval from concern
authority
Monitor: to monitor the Electrical, Civil and Mechanical Activities
Completion: After completion of work obtain quality Assurance from concern department and
handover to concerning sub-division

Page 3 of 3

También podría gustarte