7A Barbados Avenue, Kingston 5, Jamaica, Tele: (876) 754-2154/5 Fax: (876) 754-2156
E-mail: mail@fcsconsultants.com
PREPARED FOR
Kingston Container Terminals Limited
June 2010
The following is estimate reflects the works items and associated cost for the construction
of the Perimeter wall for the Kingston Container Terminals.
RW-P1
Preliminaries
General Conditions of Contract and Preliminaries
650,000.00
650,000.00
RW-D1
Preamble
Proposed 6" thick masonry wall
Demolition and Alterations
A Carefully demolish damaged concrete wall panels &
remove to spoil heaps. Cut away decomposed
reinforcement.
522
sq.yd
$ 1,386.90
723,961.80
376
cu.yd
$ 1,499.40
563,774.40
338.4 sq.yd
250.00
84,600.00
206.8 cu.yd
420.00
86,856.00
169.2 cu.yd
500.00
84,600.00
$ 1,550.00
72,850.00
338.4 sq.yd
275.00
93,060.00
206.8 sq.yd
$ 1,551.15
320,777.82
$ 16,842.08
$ 2,374,733.28
Filling
F Approved quality imported marl filling as specified,
spread,levelled and compacted to a California Bearing
Ratio of 30, in layers not exceeding 6" thick under floor.
G Level ,prepare and blind (2") filling to receive concrete.
47
cu.yd
Carried to collection
141
cu.yd
$ 4,405,213.30
RW-D2
1410
lb.
89.88
126,730.80
4606
lb.
89.88
413,987.28
3102
lb.
89.88
278,807.76
7050
lb.
89.88
633,654.00
10528
lb.
89.88
946,256.64
1034
sq.yd
Formwork
F Fabricate, erect and strike sawn form work to sides of
masonry walling [ one face only ]
$ 1,370.00
$ 1,416,580.00
Provisional Sum
G Include a P.C. Sum of ($183,600.00) for SAND
BLASTING of reinforcement bars, to be executed under
the direction of an Engineer.
sum
sum
$ 1,433,985.60
sum
Carried to collection
183,600.00
250,000.00
$ 5,683,602.08
RW-D3
COLLECTION
Carried from page RW-D1
$ 4,405,213.30
$ 5,683,602.08
$10,088,815.38
GS-1
GENERAL SUMMARY
Preliminaries
650,000.00
10,088,815.38
10,738,815.38
G.S. 1